ANR Pipeline Company; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 18532-18533 [2023-06439]
Download as PDF
18532
Federal Register / Vol. 88, No. 60 / Wednesday, March 29, 2023 / Notices
A decisional record on the Request
will be developed through responses to
this Notice by parties, including the
parties’ written comments and replies
thereto. Additional procedures will be
used as necessary to achieve a complete
understanding of the facts and issues. If
an additional procedure is scheduled,
notice will be provided to all parties. If
no party requests additional procedures,
a final Order may be issued based on the
official record, including the Request
and responses filed by parties pursuant
to this Notice, in accordance with 10
CFR 590.316.
Signed in Washington, DC, on March 23,
2023.
Amy Sweeney,
Director, Office of Regulation, Analysis, and
Engagement, Office of Resource
Sustainability.
[FR Doc. 2023–06509 Filed 3–28–23; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–92–000]
ddrumheller on DSK120RN23PROD with NOTICES1
ANR Pipeline Company; Notice of
Request Under Blanket Authorization
and Establishing Intervention and
Protest Deadline
Take notice that on March 13, 2023,
ANR Pipeline Company (ANR), 700
Louisiana Street, Suite 1300, Houston,
Texas 77002, filed in the above
referenced docket, a prior notice
pursuant to Sections 157.205 and
157.216 of the Federal Energy
Regulatory Commission’s regulations
under the Natural Gas Act and the
blanket certificate issued by the
Commission in Docket No. CP82–480–
000,1 seeking authorization to abandon
two injection/withdrawal wells and
appurtenances located at the Reed City
Storage Field in Osceola County,
Michigan.
The proposed abandonment is
required by Pipeline and Hazardous
Materials Safety Administration’s
Storage Final Rule, which requires
storage operators to assess well integrity
risk and to implement appropriate
prevention and mitigation measures to
reduce risk. The two proposed wells
provide little value and have
historically performed poorly. The
estimated cost of the project is $430,000,
all as more fully set forth in the request
which is on file with the Commission
and open to public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TTY, (202)
502–8659.
Any questions concerning this
application should be directed to David
A. Alonzo, Manager, Project
Authorizations, Bison Pipeline LLC, 700
Louisiana Street, Suite 1300, Houston,
Texas 77002, by phone at (832) 320–
5477; or by email to david_alonzo@
tcenergy.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on May 22, 2023. How to
file protests, motions to intervene, and
comments is explained below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,2 any person 3 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
Wisconsin Pipe Line Company, 20
FERC ¶ 62,595 (1982).
VerDate Sep<11>2014
19:20 Mar 28, 2023
Jkt 259001
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 5 and the regulations under
the NGA 6 by the intervention deadline
for the project, which is May 22, 2023.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
2 18
3 Persons
1 Michigan
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,4 and must be submitted by
the protest deadline, which is May 22,
2023. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
4 18
CFR 157.205(e).
CFR 385.214.
6 18 CFR 157.10.
5 18
E:\FR\FM\29MRN1.SGM
29MRN1
Federal Register / Vol. 88, No. 60 / Wednesday, March 29, 2023 / Notices
ensure that your comments are timely
and properly recorded, please submit
your comments on or before May 22,
2023. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
ddrumheller on DSK120RN23PROD with NOTICES1
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–92–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing.’’ The
Commission’s eFiling staff are available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
(2) You can file a paper copy of your
submission. Your submission must
reference the Project docket number
CP23–92–000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: David A. Alonzo,
Manager, Project Authorizations, Bison
Pipeline LLC, 700 Louisiana Street,
Suite 1300, Houston, Texas 77002, by
phone at (832) 320–477; or by email to
david_alonzo@tcenergy.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
VerDate Sep<11>2014
19:20 Mar 28, 2023
Jkt 259001
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: March 22, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–06439 Filed 3–28–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2879–013]
Green Mountain Power Corporation;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-capacity
Amendment of License.
b. Project No: 2879–013.
c. Date Filed: February 7, 2023, and
supplemented March 8, 2023.
d. Applicant: Green Mountain Power
Corporation (licensee).
e. Name of Project: Bolton Falls
Hydroelectric Project.
f. Location: The project is located on
the Winooski River near the town of
Duxbury in Washington County,
Vermont, and does not occupy federal
land.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Jason L. Lisai,
Green Mountain Power Corporation, 163
Acorn Lane, Colchester, VT 05446–
6611, (802) 655–8723, jason.lisai@
greenmountainpower.com.
i. FERC Contact: Jeremy Jessup, (202)
502–6779, Jeremy.Jessup@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: April
24, 2023.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
18533
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–2879–013. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee proposes to replace the two
existing turbine-generator units with
two new turbine-generator units, and
add an additional steel roof hatch to the
powerhouse. The new turbine-generator
units would be placed in the same
location as the existing turbinegenerator units. The installation of the
new units would result in the
authorized installed capacity of the
project decreasing from 7,500 kilowatts
(kW) to 6,962 kW and the maximum
hydraulic capacity decreasing from
2,400 cubic feet per second (cfs) to 2,210
cfs. The licensee does not propose any
other structural modifications to the
powerhouse or any other project
structures. In addition, the licensee
states there will be no change in the
project’s operating mode and all
construction activities associated with
the proposed amendment would occur
within the existing powerhouse and be
isolated from the river.
l. Locations of the Application: This
filing may be viewed on the
E:\FR\FM\29MRN1.SGM
29MRN1
Agencies
[Federal Register Volume 88, Number 60 (Wednesday, March 29, 2023)]
[Notices]
[Pages 18532-18533]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-06439]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-92-000]
ANR Pipeline Company; Notice of Request Under Blanket
Authorization and Establishing Intervention and Protest Deadline
Take notice that on March 13, 2023, ANR Pipeline Company (ANR), 700
Louisiana Street, Suite 1300, Houston, Texas 77002, filed in the above
referenced docket, a prior notice pursuant to Sections 157.205 and
157.216 of the Federal Energy Regulatory Commission's regulations under
the Natural Gas Act and the blanket certificate issued by the
Commission in Docket No. CP82-480-000,\1\ seeking authorization to
abandon two injection/withdrawal wells and appurtenances located at the
Reed City Storage Field in Osceola County, Michigan.
---------------------------------------------------------------------------
\1\ Michigan Wisconsin Pipe Line Company, 20 FERC ] 62,595
(1982).
---------------------------------------------------------------------------
The proposed abandonment is required by Pipeline and Hazardous
Materials Safety Administration's Storage Final Rule, which requires
storage operators to assess well integrity risk and to implement
appropriate prevention and mitigation measures to reduce risk. The two
proposed wells provide little value and have historically performed
poorly. The estimated cost of the project is $430,000, all as more
fully set forth in the request which is on file with the Commission and
open to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (www.ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TTY, (202) 502-8659.
Any questions concerning this application should be directed to
David A. Alonzo, Manager, Project Authorizations, Bison Pipeline LLC,
700 Louisiana Street, Suite 1300, Houston, Texas 77002, by phone at
(832) 320-5477; or by email to [email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on May 22, 2023. How
to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\2\ any person \3\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\2\ 18 CFR 157.205.
\3\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\4\ and must be submitted by
the protest deadline, which is May 22, 2023. A protest may also serve
as a motion to intervene so long as the protestor states it also seeks
to be an intervenor.
---------------------------------------------------------------------------
\4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \5\ and the regulations under the NGA \6\ by the
intervention deadline for the project, which is May 22, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\5\ 18 CFR 385.214.
\6\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To
[[Page 18533]]
ensure that your comments are timely and properly recorded, please
submit your comments on or before May 22, 2023. The filing of a comment
alone will not serve to make the filer a party to the proceeding. To
become a party, you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP23-92-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select ``General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing.'' The Commission's eFiling
staff are available to assist you at (202) 502-8258 or
[email protected]
(2) You can file a paper copy of your submission. Your submission
must reference the Project docket number CP23-92-000.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426.
To mail via any other courier, use the following address: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at: David A.
Alonzo, Manager, Project Authorizations, Bison Pipeline LLC, 700
Louisiana Street, Suite 1300, Houston, Texas 77002, by phone at (832)
320-477; or by email to [email protected]. Any subsequent
submissions by an intervenor must be served on the applicant and all
other parties to the proceeding. Contact information for parties can be
downloaded from the service list at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: March 22, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-06439 Filed 3-28-23; 8:45 am]