Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 18309-18311 [2023-06367]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 88, No. 59 / Tuesday, March 28, 2023 / Notices 4. Reporting: (a) If you apply for a grant under this competition, you must ensure that you have in place the necessary processes and systems to comply with the reporting requirements in 2 CFR part 170 should you receive funding under the competition. This does not apply if you have an exception under 2 CFR 170.110(b). (b) At the end of your project period, you must submit a final performance report, including financial information, as directed by the Secretary. If you receive a multiyear award, you must submit an annual performance report that provides the most current performance and financial expenditure information as directed by the Secretary under 34 CFR 75.118. The Secretary may also require more frequent performance reports under 34 CFR 75.720(c). For specific requirements on reporting, please go to www.ed.gov/ fund/grant/apply/appforms/ appforms.html. Performance reports for the IRS program must be submitted electronically using the International Resource Information System (IRIS), the web-based reporting system for the International and Foreign Language Education office. For information about the system and to view the reporting instructions, please go to https:// iris.ed.gov/iris/pdfs/IRS.pdf. 5. Performance Measures: The following performance measures for this program have been established for the purpose of Department reporting under 34 CFR 75.110. a. The percentage of IRS projects that are focused on improving or strengthening K–16 instruction in less commonly taught languages, area studies, or other international fields. b. The percentage of IRS projects that are focused on evaluation of the outcomes and effectiveness of title VI programs in addressing national needs. c. The percentage of IRS projects that result in information from IRS studies, surveys, or research on language, area studies, and international studies being made available and accessible to the public. d. The cost per IRS project that is focused on improving or strengthening K–16 instruction in modern foreign languages, area studies, and other international fields. 6. Continuation Awards: In making a continuation award under 34 CFR 75.253, the Secretary considers, among other things: whether a grantee has made substantial progress in achieving the goals and objectives of the project; whether the grantee has expended funds in a manner that is consistent with its approved application and budget; and, VerDate Sep<11>2014 16:59 Mar 27, 2023 Jkt 259001 if the Secretary has established performance measurement requirements, whether the grantee has made substantial progress in achieving the performance targets in the grantee’s approved application. In making a continuation award, the Secretary also considers whether the grantee is operating in compliance with the assurances in its approved application, including those applicable to Federal civil rights laws that prohibit discrimination in programs or activities receiving Federal financial assistance from the Department (34 CFR 100.4, 104.5, 106.4, 108.8, and 110.23). VII. Other Information Accessible Format: On request to the program contact person listed under FOR FURTHER INFORMATION CONTACT, individuals with disabilities can obtain this document and a copy of the application package in an accessible format. The Department will provide the requestor with an accessible format that may include Rich Text Format (RTF) or text format (txt), a thumb drive, an MP3 file, braille, large print, audiotape, or compact disc, or other accessible format. Electronic Access to This Document: The official version of this document is the document published in the Federal Register. You may access the official edition of the Federal Register and the Code of Federal Regulations at www.govinfo.gov. At this site you can view this document, as well as all other documents of this Department published in the Federal Register, in text or Portable Document Format (PDF). To use PDF you must have Adobe Acrobat Reader, which is available free at the site. You may also access documents of the Department published in the Federal Register by using the article search feature at www.federalregister.gov. Specifically, through the advanced search feature at this site, you can limit your search to documents published by the Department. Nasser H. Paydar, Assistant Secretary for Postsecondary Education. [FR Doc. 2023–06341 Filed 3–27–23; 8:45 am] BILLING CODE 4000–01–P PO 00000 18309 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 10489–020] City of River Falls Municipal Utilities; Notice of Waiver Period for Water Quality Certification Application On April 26, 2022, the City of River Falls Municipal Utilities submitted to the Federal Energy Regulatory Commission (Commission) a copy of its application for a Clean Water Act section 401(a)(1) water quality certification filed with the Wisconsin Department of Natural Resources (Wisconsin DNR), in conjunction with the above captioned project. Pursuant to 40 CFR 121.6 and section 5.23(b) of the Commission’s regulations,1 we hereby notify Wisconsin DNR of the following: Date of Receipt of the Certification Request: April 28, 2022.2 Reasonable Period of Time to Act on the Certification Request: One year (April 28, 2023). If Wisconsin DNR fails or refuses to act on the water quality certification request on or before the above date, then the agency certifying authority is deemed waived pursuant to section 401(a)(1) of the Clean Water Act, 33 U.S.C. 1341(a)(1). Dated: March 21, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–06365 Filed 3–27–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–94–000] Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on March 14, 2023, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 State Route 56, Owensboro, Kentucky 42301, filed a prior notice request for authorization, in accordance with 18 CFR 157.205, 157.208, and 157.213 of the Federal Energy Regulatory Commission’s (Commission) regulations under the Natural Gas Act and Southern Star’s blanket certificate issued in Docket No. CP82–479–000, to drill a new horizontal 1 18 CFR [4.34(b)(5)/5.23(b)/153.4/157.22]. City of River Falls Municipal Utilities filed proof of the certification request on April 29, 2022. 2 The Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\28MRN1.SGM 28MRN1 lotter on DSK11XQN23PROD with NOTICES1 18310 Federal Register / Vol. 88, No. 59 / Tuesday, March 28, 2023 / Notices well and install a lateral pipeline to connect the new well to existing facilities at Southern Star’s Webb Storage Field in Grant County, Oklahoma (Webb Storage Field Project or Project). Southern Star states that the Webb Storage Field Project is designed to supplement existing deliverability and improve overall efficiency, reduce operating costs, and serve as an alternative to the installation of new dewatering facilities on existing storage gathering laterals. Southern Star further states that the Project will not require any changes to working or cushion gas volumes, reservoir pressure, reservoir and buffer boundaries, or the certificated capacity of the field. Specifically, Southern Star proposes to drill the new horizontal well approximately 110 feet from existing line VM–002 and to construct a 6-inchdiameter lateral (Line VM–066) connecting the well to Line VM–002. Additional pig launcher/receiver valves and metering, communications, and power facilities would be constructed at the well head and enclosed with fencing. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application should be directed to Cindy Thompson, Director, Regulatory, Compliance & Information Governance, Southern Star Central Gas Pipeline, Inc., 4700 State Route 56, Owensboro, Kentucky 42301, by phone at (270) 852– 4655 or by email to cindy.thompson@ southernstar.com. Pursuant to section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and 1 18 CFR (Code of Federal Regulations) 157.9. VerDate Sep<11>2014 16:59 Mar 27, 2023 Jkt 259001 place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify Federal and State agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all Federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on May 20, 2023. How to file protests, motions to intervene, and comments is explained below. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,2 any person 3 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,4 and must be submitted by the protest deadline, which is May 20, 2023. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. 2 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 4 18 CFR 157.205(e). 3 Persons PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 5 and the regulations under the NGA 6 by the intervention deadline for the project, which is May 20, 2023. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before May 20, 2023. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. 5 18 6 18 CFR 385.214. CFR 157.10. E:\FR\FM\28MRN1.SGM 28MRN1 Federal Register / Vol. 88, No. 59 / Tuesday, March 28, 2023 / Notices lotter on DSK11XQN23PROD with NOTICES1 How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP23–94–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing’’; or 7 (2) You can file a paper copy of your submission by mailing it to the address below. Your submission must reference the Project docket number CP23–94– 000. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission encourages electronic filing of submissions (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail or email (with a link to the document) at: Cindy Thompson, Director, Regulatory, Compliance & Information Governance, Southern Star Central Gas Pipeline, Inc., 4700 State Route 56, Owensboro, Kentucky 42301, by phone at (270) 852–4655 or by email to cindy.thompson@southernstar.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– 7 Additionally, you may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project. VerDate Sep<11>2014 16:59 Mar 27, 2023 Jkt 259001 FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Dated: March 21, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–06367 Filed 3–27–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2354–168] Georgia Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Temporary Variance from Recreation Plan. b. Project No: 2354–168. c. Date Filed: March 3, 2023. d. Applicant: Georgia Power Company. e. Name of Project: North Georgia Hydroelectric Project. f. Location: Nacoochee Park located just below the Nacoochee dam in Rabun County, Georgia. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Joseph Charles, 241 Ralph McGill Blvd. NE, BIN 10151, Atlanta, GA 30308; (404)506–2337; jcharles@southernco.com. i. FERC Contact: Mark Carter, (678) 245–3083, mark.carter@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: April 19, 2023. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 18311 efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–2354–168. Comments emailed to Commission staff are not considered part of the Commission record. k. Description of Request: The licensee requests a variance from Article 418 (Recreation Plan) to close Nacoochee Park beginning August 1, 2023, for a period of up to two years, to support its hydro modernization efforts at the Nacoochee dam and powerhouse. Specifically, the licensee plans to stage equipment and store materials needed for the modernization work at Nacoochee Park and close the park to public access for public safety and project security reasons. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the E:\FR\FM\28MRN1.SGM 28MRN1

Agencies

[Federal Register Volume 88, Number 59 (Tuesday, March 28, 2023)]
[Notices]
[Pages 18309-18311]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-06367]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-94-000]


Southern Star Central Gas Pipeline, Inc.; Notice of Request Under 
Blanket Authorization and Establishing Intervention and Protest 
Deadline

    Take notice that on March 14, 2023, Southern Star Central Gas 
Pipeline, Inc. (Southern Star), 4700 State Route 56, Owensboro, 
Kentucky 42301, filed a prior notice request for authorization, in 
accordance with 18 CFR 157.205, 157.208, and 157.213 of the Federal 
Energy Regulatory Commission's (Commission) regulations under the 
Natural Gas Act and Southern Star's blanket certificate issued in 
Docket No. CP82-479-000, to drill a new horizontal

[[Page 18310]]

well and install a lateral pipeline to connect the new well to existing 
facilities at Southern Star's Webb Storage Field in Grant County, 
Oklahoma (Webb Storage Field Project or Project).
    Southern Star states that the Webb Storage Field Project is 
designed to supplement existing deliverability and improve overall 
efficiency, reduce operating costs, and serve as an alternative to the 
installation of new dewatering facilities on existing storage gathering 
laterals. Southern Star further states that the Project will not 
require any changes to working or cushion gas volumes, reservoir 
pressure, reservoir and buffer boundaries, or the certificated capacity 
of the field. Specifically, Southern Star proposes to drill the new 
horizontal well approximately 110 feet from existing line VM-002 and to 
construct a 6-inch-diameter lateral (Line VM-066) connecting the well 
to Line VM-002. Additional pig launcher/receiver valves and metering, 
communications, and power facilities would be constructed at the well 
head and enclosed with fencing.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions concerning this application should be directed to 
Cindy Thompson, Director, Regulatory, Compliance & Information 
Governance, Southern Star Central Gas Pipeline, Inc., 4700 State Route 
56, Owensboro, Kentucky 42301, by phone at (270) 852-4655 or by email 
to [email protected].
    Pursuant to section 157.9 of the Commission's Rules of Practice and 
Procedure,\1\ within 90 days of this Notice the Commission staff will 
either: complete its environmental review and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or environmental 
assessment (EA) for this proposal. The filing of an EA in the 
Commission's public record for this proceeding or the issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
Federal and State agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all Federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
---------------------------------------------------------------------------

    \1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on May 20, 2023. How 
to file protests, motions to intervene, and comments is explained 
below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\2\ any person \3\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \2\ 18 CFR 157.205.
    \3\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\4\ and must be submitted by 
the protest deadline, which is May 20, 2023. A protest may also serve 
as a motion to intervene so long as the protestor states it also seeks 
to be an intervenor.
---------------------------------------------------------------------------

    \4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \5\ and the regulations under the NGA \6\ by the 
intervention deadline for the project, which is May 20, 2023. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \5\ 18 CFR 385.214.
    \6\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before May 20, 2023. The filing of a comment alone will not serve 
to make the filer a party to the proceeding. To become a party, you 
must intervene in the proceeding.

[[Page 18311]]

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP23-94-000 in your submission.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing''; or \7\
---------------------------------------------------------------------------

    \7\ Additionally, you may file your comments electronically by 
using the eComment feature, which is located on the Commission's 
website at www.ferc.gov under the link to Documents and Filings. 
Using eComment is an easy method for interested persons to submit 
brief, text-only comments on a project.
---------------------------------------------------------------------------

    (2) You can file a paper copy of your submission by mailing it to 
the address below. Your submission must reference the Project docket 
number CP23-94-000.
    To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426.
    To mail via any other courier, use the following address: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852.
    The Commission encourages electronic filing of submissions (option 
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected]
    Protests and motions to intervene must be served on the applicant 
either by mail or email (with a link to the document) at: Cindy 
Thompson, Director, Regulatory, Compliance & Information Governance, 
Southern Star Central Gas Pipeline, Inc., 4700 State Route 56, 
Owensboro, Kentucky 42301, by phone at (270) 852-4655 or by email to 
[email protected]. Any subsequent submissions by an 
intervenor must be served on the applicant and all other parties to the 
proceeding. Contact information for parties can be downloaded from the 
service list at the eService link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.

    Dated: March 21, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-06367 Filed 3-27-23; 8:45 am]
BILLING CODE 6717-01-P