Georgia Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 18311-18312 [2023-06366]
Download as PDF
Federal Register / Vol. 88, No. 59 / Tuesday, March 28, 2023 / Notices
lotter on DSK11XQN23PROD with NOTICES1
How To File Protests, Interventions,
and Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–94–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 7
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–94–
000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: Cindy Thompson,
Director, Regulatory, Compliance &
Information Governance, Southern Star
Central Gas Pipeline, Inc., 4700 State
Route 56, Owensboro, Kentucky 42301,
by phone at (270) 852–4655 or by email
to cindy.thompson@southernstar.com.
Any subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
7 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
VerDate Sep<11>2014
16:59 Mar 27, 2023
Jkt 259001
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: March 21, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–06367 Filed 3–27–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2354–168]
Georgia Power Company; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Temporary
Variance from Recreation Plan.
b. Project No: 2354–168.
c. Date Filed: March 3, 2023.
d. Applicant: Georgia Power
Company.
e. Name of Project: North Georgia
Hydroelectric Project.
f. Location: Nacoochee Park located
just below the Nacoochee dam in Rabun
County, Georgia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Joseph Charles,
241 Ralph McGill Blvd. NE, BIN 10151,
Atlanta, GA 30308; (404)506–2337;
jcharles@southernco.com.
i. FERC Contact: Mark Carter, (678)
245–3083, mark.carter@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: April
19, 2023.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
18311
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–2354–168. Comments
emailed to Commission staff are not
considered part of the Commission
record.
k. Description of Request: The
licensee requests a variance from Article
418 (Recreation Plan) to close
Nacoochee Park beginning August 1,
2023, for a period of up to two years, to
support its hydro modernization efforts
at the Nacoochee dam and powerhouse.
Specifically, the licensee plans to stage
equipment and store materials needed
for the modernization work at
Nacoochee Park and close the park to
public access for public safety and
project security reasons.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
E:\FR\FM\28MRN1.SGM
28MRN1
18312
Federal Register / Vol. 88, No. 59 / Tuesday, March 28, 2023 / Notices
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: March 21, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–06366 Filed 3–27–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
lotter on DSK11XQN23PROD with NOTICES1
Combined Notice of Filings #1
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL23–48–000.
Applicants: Ponderosa Power, LLC v.
North Western Corporation.
Description: Complaint of Ponderosa
Power, LLC v. North Western
Corporation.
Filed Date: 3/20/23.
Accession Number: 20230320–5128.
Comment Date: 5 p.m. ET 4/10/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–378–003.
Applicants: Mississippi Power
Company.
Description: Compliance filing: Gulf
States TFA Order No. 864 Supplemental
Further Compliance Filing to be
effective 1/27/2020.
VerDate Sep<11>2014
16:59 Mar 27, 2023
Jkt 259001
Filed Date: 3/21/23.
Accession Number: 20230321–5113.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: ER22–2462–002;
EL22–27–001.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company, Alabama
Power Company, Georgia Power
Company, Mississippi Power Company.
Description: Southern Companies
submits a Compliance Filing with
respect to a revised version of its
Formula Rate Protocols as directed in
January 19, 2023 Commission Order.
Filed Date: 3/20/23.
Accession Number: 20230320–5203.
Comment Date: 5 p.m. ET 4/10/23.
Docket Numbers: ER23–1427–000.
Applicants: American Electric Power
Service Corporation, Ohio Power
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
American Electric Power Service
Corporation submits tariff filing per
35.13(a)(2)(iii: AEP submits one
Facilities Agreements re: ILDSA, SA No.
1336 to be effective 5/21/2023.
Filed Date: 3/21/23.
Accession Number: 20230321–5014.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: ER23–1428–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
6827; Queue No. AE1–108 to be
effective 2/21/2023.
Filed Date: 3/21/23.
Accession Number: 20230321–5016.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: ER23–1429–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2023–03–21_SA 4015 NSP-Mayhew
Creek Solar FSA (J1445) to be effective
5/21/2023.
Filed Date: 3/21/23.
Accession Number: 20230321–5020.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: ER23–1430–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Attachment AE to Modify
the Regulation Mileage Compensation
Design to be effective 12/31/9998.
Filed Date: 3/21/23.
Accession Number: 20230321–5027.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: ER23–1431–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to OATT and OA RE Market
Suspension Rules to be effective 6/1/
2023.
PO 00000
Frm 00021
Fmt 4703
Sfmt 9990
Filed Date: 3/21/23.
Accession Number: 20230321–5031.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: ER23–1432–000.
Applicants: Southern California
Edison Company.
Description: Tariff Amendment:
Cancel High Desert Power Project IFA
(TOT005_SA No. 11) to be effective 5/
21/2023.
Filed Date: 3/21/23.
Accession Number: 20230321–5044.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: ER23–1433–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
Constellation FKA Exelon NITSA (OR
DA) SA 943 Rev 5 to be effective 3/1/
2023.
Filed Date: 3/21/23.
Accession Number: 20230321–5049.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: ER23–1434–000.
Applicants: Sugar Maple Wind, LLC.
Description: Baseline eTariff Filing:
Shared Facilities Agreement Between
Big Savage, LLC and Sugar Maple Wind,
LLC to be effective 5/21/2023.
Filed Date: 3/21/23.
Accession Number: 20230321–5096.
Comment Date: 5 p.m. ET 4/11/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 21, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–06368 Filed 3–27–23; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\28MRN1.SGM
28MRN1
Agencies
[Federal Register Volume 88, Number 59 (Tuesday, March 28, 2023)]
[Notices]
[Pages 18311-18312]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-06366]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2354-168]
Georgia Power Company; Notice of Application Accepted for Filing
and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Temporary Variance from Recreation Plan.
b. Project No: 2354-168.
c. Date Filed: March 3, 2023.
d. Applicant: Georgia Power Company.
e. Name of Project: North Georgia Hydroelectric Project.
f. Location: Nacoochee Park located just below the Nacoochee dam in
Rabun County, Georgia.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Joseph Charles, 241 Ralph McGill Blvd. NE,
BIN 10151, Atlanta, GA 30308; (404)506-2337; [email protected].
i. FERC Contact: Mark Carter, (678) 245-3083, [email protected].
j. Deadline for filing comments, motions to intervene, and
protests: April 19, 2023.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include docket number P-2354-168. Comments emailed to Commission staff
are not considered part of the Commission record.
k. Description of Request: The licensee requests a variance from
Article 418 (Recreation Plan) to close Nacoochee Park beginning August
1, 2023, for a period of up to two years, to support its hydro
modernization efforts at the Nacoochee dam and powerhouse.
Specifically, the licensee plans to stage equipment and store materials
needed for the modernization work at Nacoochee Park and close the park
to public access for public safety and project security reasons.
l. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the
[[Page 18312]]
appropriate action to take, the Commission will consider all protests
or other comments filed, but only those who file a motion to intervene
in accordance with the Commission's Rules may become a party to the
proceeding. Any comments, protests, or motions to intervene must be
received on or before the specified comment date for the particular
application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: March 21, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-06366 Filed 3-27-23; 8:45 am]
BILLING CODE 6717-01-P