Combined Notice of Filings #1, 17564-17565 [2023-05905]

Download as PDF 17564 Federal Register / Vol. 88, No. 56 / Thursday, March 23, 2023 / Notices Filed Date: 3/17/23. Accession Number: 20230317–5072. Comment Date: 5 p.m. ET 4/7/23. Docket Numbers: ER23–1418–000. Applicants: AES WR Limited Partnership. Description: Baseline eTariff Filing: Application for Market Based Rate to be effective 6/1/2023. Filed Date: 3/17/23. Accession Number: 20230317–5084. Comment Date: 5 p.m. ET 4/7/23. Docket Numbers: ER23–1419–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original NSA, SA No. 6833; Queue No. AE2–148 to be effective 2/17/2023. Filed Date: 3/17/23. Accession Number: 20230317–5089. Comment Date: 5 p.m. ET 4/7/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 17, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–06009 Filed 3–22–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission ddrumheller on DSK120RN23PROD with NOTICES1 Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG23–93–000. Applicants: Double Black Diamond Solar Power, LLC. Description: Double Black Diamond Solar Power, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. VerDate Sep<11>2014 19:23 Mar 22, 2023 Jkt 259001 Filed Date: 3/16/23. Accession Number: 20230316–5087. Comment Date: 5 p.m. ET 4/6/23. Docket Numbers: EG23–94–000. Applicants: Landrace Holdings, LLC. Description: Landrace Holdings, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 3/16/23. Accession Number: 20230316–5130. Comment Date: 5 p.m. ET 4/6/23. Docket Numbers: EG23–95–000. Applicants: PGR 2021 Lessee 18, LLC. Description: PGR 2021 Lessee 18, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 3/16/23. Accession Number: 20230316–5134. Comment Date: 5 p.m. ET 4/6/23. Docket Numbers: EG23–96–000. Applicants: Virginia Line Solar, LLC. Description: Virginia Line Solar, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 3/16/23. Accession Number: 20230316–5142. Comment Date: 5 p.m. ET 4/6/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER15–1668–004. Applicants: Phoenix Energy Group, LLC. Description: Notice of Non-Material Change in Status of Phoenix Energy Group, LLC. Filed Date: 3/15/23. Accession Number: 20230315–5216. Comment Date: 5 p.m. ET 4/5/23. Docket Numbers: ER17–405–000; ER17–406–000. Applicants: American Electric Power Service Corporation, PJM Interconnection, L.L.C., American Electric Power Service Corporation, PJM Interconnection, L.L.C. Description: Formal Challenge of the Joint Consumer Group to the 2022 Annual Formula Rate Update of AEP East Operating Companies. Filed Date: 3/8/23. Accession Number: 20230308–5176. Comment Date: 5 p.m. ET 4/7/23. Docket Numbers: ER20–1298–004. Applicants: Midcontinent Independent System Operator, Inc. Description: Compliance filing: 2023– 03–16_MISO TO’s Order 864 Deficiency Response to be effective 1/27/2020. Filed Date: 3/16/23. Accession Number: 20230316–5107. Comment Date: 5 p.m. ET 4/6/23. Docket Numbers: ER22–1165–003. Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Order No. 676–J Compliance Revisions to PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 Tariff, Section 4.2 to be effective 2/23/ 2023. Filed Date: 3/16/23. Accession Number: 20230316–5096. Comment Date: 5 p.m. ET 4/6/23. Docket Numbers: ER23–868–001. Applicants: PEI Power LLC. Description: Tariff Amendment: Supplement to Tariff Filing to be effective 1/19/2023. Filed Date: 3/16/23. Accession Number: 20230316–5069. Comment Date: 5 p.m. ET 4/6/23. Docket Numbers: ER23–1064–001. Applicants: Upper Missouri G. & T. Electric Cooperative, Inc. Description: Tariff Amendment: Amended Cert. of Concurrence—SPS Serv. Agreement to be effective 1/12/ 2023. Filed Date: 3/16/23. Accession Number: 20230316–5032. Comment Date: 5 p.m. ET 4/6/23. Docket Numbers: ER23–1398–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 6824; Queue No. AE2–120 to be effective 2/14/2023. Filed Date: 3/16/23. Accession Number: 20230316–5002. Comment Date: 5 p.m. ET 4/6/23. Docket Numbers: ER23–1399–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Correction to 2022 Annual Regional Transmission Expansion Plan Update Filing to be effective 1/1/2022. Filed Date: 3/16/23. Accession Number: 20230316–5010. Comment Date: 5 p.m. ET 4/6/23. Docket Numbers: ER23–1401–000. Applicants: Niagara Mohawk Power Corporation, New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: Niagara Mohawk Power Corporation submits tariff filing per 35.13(a)(2)(iii: NYISO-National Grid Joint 205: SGIA Hawthorn Solar Project SA2756 to be effective 3/2/2023. Filed Date: 3/16/23. Accession Number: 20230316–5016. Comment Date: 5 p.m. ET 4/6/23. Docket Numbers: ER23–1402–000. Applicants: Midcontinent Independent System Operator, Inc., Ameren Illinois Company. Description: § 205(d) Rate Filing: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2023–03–16_SA 4014 Ameren IL-Flora Solar E&P (J1679) to be effective 3/17/2023. Filed Date: 3/16/23. E:\FR\FM\23MRN1.SGM 23MRN1 17565 ddrumheller on DSK120RN23PROD with NOTICES1 Federal Register / Vol. 88, No. 56 / Thursday, March 23, 2023 / Notices Accession Number: 20230316–5031. Comment Date: 5 p.m. ET 4/6/23. Docket Numbers: ER23–1403–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, SA No. 6274; Queue No. AE2–133 (amend) to be effective 5/16/2023. Filed Date: 3/16/23. Accession Number: 20230316–5048. Comment Date: 5 p.m. ET 4/6/23. Docket Numbers: ER23–1406–000. Applicants: Nevada Power Company. Description: § 205(d) Rate Filing: OATT Section 205 Amendments in Response to Order EL23–27 to be effective 12/1/2022. Filed Date: 3/16/23. Accession Number: 20230316–5094. Comment Date: 5 p.m. ET 4/6/23. Docket Numbers: ER23–1407–000. Applicants: Transource Pennsylvania, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Transource Pennsylvania, LLC submits tariff filing per 35.13(a)(2)(iii: Transource Pennsylvania, LLC Order No. 679 Application to be effective 5/ 16/2023. Filed Date: 3/16/23. Accession Number: 20230316–5124. Comment Date: 5 p.m. ET 4/6/23. Docket Numbers: ER23–1408–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revisions to Sch. 12-Appx A: February 2023 RTEP, 30-Day Comment Period Requested to be effective 6/14/2023. Filed Date: 3/16/23. Accession Number: 20230316–5140. Comment Date: 5 p.m. ET 4/6/23. Take notice that the Commission received the following electric reliability filings Docket Numbers: RD23–4–000. Applicants: North American Electric Reliability Corporation. Description: North American Electric Reliability Corporation submits Petition for Approval of Proposed Reliability Standard PCR–002–4. Filed Date: 3/10/23. Accession Number: 20230310–5272. Comment Date: 5 p.m. ET 4/10/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern VerDate Sep<11>2014 19:23 Mar 22, 2023 Jkt 259001 time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 16, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–05905 Filed 3–22–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY On July 30, 2021, Winooski Hydroelectric Company filed an application for a subsequent license to continue operating the existing 856kilowatt Winooski 8 Hydroelectric Project No. 6470 (Winooski 8 Project or project). The project is located on the Winooski River in Washington County, Vermont. The project does not occupy federal land. In accordance with the Commission’s regulations, on January 4, 2023, Commission staff issued a notice that the project was ready for environmental analysis (REA notice). Based on the information in the record, including comments filed on the REA notice, staff does not anticipate that licensing the project would constitute a major federal action significantly affecting the quality of the human environment. Therefore, staff intends to prepare a single Environmental Assessment (EA) on the application to license the Winooski 8 Project. The EA will be issued and circulated for review by all interested parties. All comments filed on the EA will be analyzed by staff and considered in the Commission’s final licensing decision. The application will be processed according to the following schedule. Revisions to the schedule may be made as appropriate. Frm 00050 Fmt 4703 Council on Environmental Quality’s (CEQ) regulations under 40 CFR 1501.10(b)(1) require that EAs be completed within 1 year of the federal action agency’s decision to prepare an EA. This notice establishes the Commission’s intent to prepare an EA for the Moretown Project. Therefore, in accordance with CEQ’s regulations, the Final EA must be issued within 1 year of the issuance date of this notice. Any questions regarding this notice may be directed to Kristen Sinclair at (202) 502–6587, or kristen.sinclair@ ferc.gov. Dated: March 17, 2023. Debbie-Anne A. Reese, Deputy Secretary. DEPARTMENT OF ENERGY Winooski Hydroelectric Company; Notice of Intent To Prepare an Environmental Assessment PO 00000 October 2023. 1 The BILLING CODE 6717–01–P [Project No. 6470–008] Commission issues EA. Comments on EA ...... Target date [FR Doc. 2023–06007 Filed 3–22–23; 8:45 am] Federal Energy Regulatory Commission Milestone Milestone Target date September 2023.1 Sfmt 4703 Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas & Oil Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP23–576–000. Applicants: Cove Point LNG, LP. Description: Section 4(d) Rate Filing: Cove Point—Rate Schedule LTD–3 to be effective 4/16/2023. Filed Date: 3/17/23. Accession Number: 20230317–5010. Comment Date: 5 p.m. ET 3/29/23. Docket Numbers: RP23–577–000. Applicants: Bison Pipeline LLC. Description: Compliance filing: Company Use Gas Annual Report 2023 to be effective N/A. Filed Date: 3/17/23. Accession Number: 20230317–5036. Comment Date: 5 p.m. ET 3/29/23. Docket Numbers: RP23–578–000. Applicants: Gas Transmission Northwest LLC. Description: Section 4(d) Rate Filing: Negotiated Rate Agreement— Tourmaline to be effective 3/17/2023. Filed Date: 3/17/23. Accession Number: 20230317–5050. Comment Date: 5 p.m. ET 3/29/23. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but E:\FR\FM\23MRN1.SGM 23MRN1

Agencies

[Federal Register Volume 88, Number 56 (Thursday, March 23, 2023)]
[Notices]
[Pages 17564-17565]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-05905]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG23-93-000.
    Applicants: Double Black Diamond Solar Power, LLC.
    Description: Double Black Diamond Solar Power, LLC submits Notice 
of Self-Certification of Exempt Wholesale Generator Status.
    Filed Date: 3/16/23.
    Accession Number: 20230316-5087.
    Comment Date: 5 p.m. ET 4/6/23.

    Docket Numbers: EG23-94-000.
    Applicants: Landrace Holdings, LLC.
    Description: Landrace Holdings, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 3/16/23.
    Accession Number: 20230316-5130.
    Comment Date: 5 p.m. ET 4/6/23.

    Docket Numbers: EG23-95-000.
    Applicants: PGR 2021 Lessee 18, LLC.
    Description: PGR 2021 Lessee 18, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 3/16/23.
    Accession Number: 20230316-5134.
    Comment Date: 5 p.m. ET 4/6/23.

    Docket Numbers: EG23-96-000.
    Applicants: Virginia Line Solar, LLC.
    Description: Virginia Line Solar, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 3/16/23.
    Accession Number: 20230316-5142.
    Comment Date: 5 p.m. ET 4/6/23.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER15-1668-004.
    Applicants: Phoenix Energy Group, LLC.
    Description: Notice of Non-Material Change in Status of Phoenix 
Energy Group, LLC.
    Filed Date: 3/15/23.
    Accession Number: 20230315-5216.
    Comment Date: 5 p.m. ET 4/5/23.

    Docket Numbers: ER17-405-000; ER17-406-000.
    Applicants: American Electric Power Service Corporation, PJM 
Interconnection, L.L.C., American Electric Power Service Corporation, 
PJM Interconnection, L.L.C.
    Description: Formal Challenge of the Joint Consumer Group to the 
2022 Annual Formula Rate Update of AEP East Operating Companies.
    Filed Date: 3/8/23.
    Accession Number: 20230308-5176.
    Comment Date: 5 p.m. ET 4/7/23.

    Docket Numbers: ER20-1298-004.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Compliance filing: 2023-03-16_MISO TO's Order 864 
Deficiency Response to be effective 1/27/2020.
    Filed Date: 3/16/23.
    Accession Number: 20230316-5107.
    Comment Date: 5 p.m. ET 4/6/23.

    Docket Numbers: ER22-1165-003.
    Applicants: PJM Interconnection, L.L.C.
    Description: Compliance filing: Order No. 676-J Compliance 
Revisions to Tariff, Section 4.2 to be effective 2/23/2023.
    Filed Date: 3/16/23.
    Accession Number: 20230316-5096.
    Comment Date: 5 p.m. ET 4/6/23.

    Docket Numbers: ER23-868-001.
    Applicants: PEI Power LLC.
    Description: Tariff Amendment: Supplement to Tariff Filing to be 
effective 1/19/2023.
    Filed Date: 3/16/23.
    Accession Number: 20230316-5069.
    Comment Date: 5 p.m. ET 4/6/23.

    Docket Numbers: ER23-1064-001.
    Applicants: Upper Missouri G. & T. Electric Cooperative, Inc.
    Description: Tariff Amendment: Amended Cert. of Concurrence--SPS 
Serv. Agreement to be effective 1/12/2023.
    Filed Date: 3/16/23.
    Accession Number: 20230316-5032.
    Comment Date: 5 p.m. ET 4/6/23.

    Docket Numbers: ER23-1398-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, Service 
Agreement No. 6824; Queue No. AE2-120 to be effective 2/14/2023.
    Filed Date: 3/16/23.
    Accession Number: 20230316-5002.
    Comment Date: 5 p.m. ET 4/6/23.

    Docket Numbers: ER23-1399-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Correction to 2022 Annual 
Regional Transmission Expansion Plan Update Filing to be effective 1/1/
2022.
    Filed Date: 3/16/23.
    Accession Number: 20230316-5010.
    Comment Date: 5 p.m. ET 4/6/23.

    Docket Numbers: ER23-1401-000.
    Applicants: Niagara Mohawk Power Corporation, New York Independent 
System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: Niagara Mohawk Power 
Corporation submits tariff filing per 35.13(a)(2)(iii: NYISO-National 
Grid Joint 205: SGIA Hawthorn Solar Project SA2756 to be effective 3/2/
2023.
    Filed Date: 3/16/23.
    Accession Number: 20230316-5016.
    Comment Date: 5 p.m. ET 4/6/23.

    Docket Numbers: ER23-1402-000.
    Applicants: Midcontinent Independent System Operator, Inc., Ameren 
Illinois Company.
    Description: Sec.  205(d) Rate Filing: Midcontinent Independent 
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2023-
03-16_SA 4014 Ameren IL-Flora Solar E&P (J1679) to be effective 3/17/
2023.
    Filed Date: 3/16/23.

[[Page 17565]]

    Accession Number: 20230316-5031.
    Comment Date: 5 p.m. ET 4/6/23.

    Docket Numbers: ER23-1403-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to ISA, SA No. 
6274; Queue No. AE2-133 (amend) to be effective 5/16/2023.
    Filed Date: 3/16/23.
    Accession Number: 20230316-5048.
    Comment Date: 5 p.m. ET 4/6/23.

    Docket Numbers: ER23-1406-000.
    Applicants: Nevada Power Company.
    Description: Sec.  205(d) Rate Filing: OATT Section 205 Amendments 
in Response to Order EL23-27 to be effective 12/1/2022.
    Filed Date: 3/16/23.
    Accession Number: 20230316-5094.
    Comment Date: 5 p.m. ET 4/6/23.

    Docket Numbers: ER23-1407-000.
    Applicants: Transource Pennsylvania, LLC, PJM Interconnection, 
L.L.C.
    Description: Sec.  205(d) Rate Filing: Transource Pennsylvania, LLC 
submits tariff filing per 35.13(a)(2)(iii: Transource Pennsylvania, LLC 
Order No. 679 Application to be effective 5/16/2023.
    Filed Date: 3/16/23.
    Accession Number: 20230316-5124.
    Comment Date: 5 p.m. ET 4/6/23.

    Docket Numbers: ER23-1408-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Revisions to Sch. 12-Appx A: 
February 2023 RTEP, 30-Day Comment Period Requested to be effective 6/
14/2023.
    Filed Date: 3/16/23.
    Accession Number: 20230316-5140.
    Comment Date: 5 p.m. ET 4/6/23.

    Take notice that the Commission received the following electric 
reliability filings

    Docket Numbers: RD23-4-000.
    Applicants: North American Electric Reliability Corporation.
    Description: North American Electric Reliability Corporation 
submits Petition for Approval of Proposed Reliability Standard PCR-002-
4.
    Filed Date: 3/10/23.
    Accession Number: 20230310-5272.
    Comment Date: 5 p.m. ET 4/10/23.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 16, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-05905 Filed 3-22-23; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.