Erie Boulevard Hydropower, L.P.; Notice of Denial of Water Quality Certification, 17207 [2023-05893]
Download as PDF
Federal Register / Vol. 88, No. 55 / Wednesday, March 22, 2023 / Notices
Comments: Comments are invited on:
(1) whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: March 16, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–05887 Filed 3–21–23; 8:45 am]
Dated: March 16, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
lotter on DSK11XQN23PROD with NOTICES1
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
[FR Doc. 2023–05859 Filed 3–21–23; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
Combined Notice of Filings
DEPARTMENT OF ENERGY
Take notice that the Commission has
received the following Natural Gas & Oil
Pipeline Rate and Refund Report filings:
Federal Energy Regulatory
Commission
Filings Instituting Proceedings
[Project No. 2701–061]
Docket Numbers: RP23–569–000.
Applicants: Midship Pipeline
Company, LLC.
Description: 2022 Annual Operations
Transaction Report of Midship Pipeline
Company, LLC.
Filed Date: 3/13/23.
Accession Number: 20230313–5247.
Comment Date: 5 p.m. ET 3/27/23.
Docket Numbers: RP23–574–000.
Applicants: MountainWest Pipeline,
LLC.
Description: § 4(d) Rate Filing: Nonconforming Contracts—Wapiti Rocky
Mountain, LLC to be effective 4/15/
2023.
Filed Date: 3/15/23.
Accession Number: 20230315–5108.
Comment Date: 5 p.m. ET 3/27/23.
Docket Numbers: RP23–575–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: § 4(d) Rate Filing: SS–2
and Firm and Interruptible
Transportation Fuel Percentages Tracker
Filing to be effective 4/1/2023.
Filed Date: 3/16/23.
Accession Number: 20230316–5046.
Comment Date: 5 p.m. ET 3/28/23.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
VerDate Sep<11>2014
16:52 Mar 21, 2023
Jkt 259001
Erie Boulevard Hydropower, L.P.;
Notice of Denial of Water Quality
Certification
On February 26, 2021, Erie Boulevard
Hydropower, L.P. (Erie) filed an
application for a license for the West
Canada Creek Hydroelectric Project
(project) in the above captioned docket.
Erie filed with the New York State
Department of Environmental
Conservation (New York DEC) a request
for water quality certification for the
project under section 401(a)(1) of the
Clean Water Act on March 9, 2022. On
March 7, 2023, New York DEC denied
certification for the project. Pursuant to
40 CFR 121.8, we are providing notice
that New York DEC’s denial satisfies the
requirements of 40 CFR 121.7(e).
Dated: March 16, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–05893 Filed 3–21–23; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
17207
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 803–120]
Pacific Gas and Electric Company;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Application for
Temporary Variance of Flow
Requirements.
b. Project No: 803–120.
c. Date Filed: February 28, 2023.
d. Applicant: Pacific Gas and Electric
Company (licensee).
e. Name of Project: DeSablaCenterville Project.
f. Location: The project is located on
Butte Creek, West Branch Feather River,
and their tributaries in Butte County,
California.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Ms. Jackie Pope,
License Coordinator, Pacific Gas and
Electric Company, Mail Code: N11D,
P.O. Box 770000, San Francisco, CA
94177, Phone: (530) 254–4007.
i. FERC Contact: Katherine Schmidt,
(415) 369–3348, katherine.schmidt@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: April
17, 2023.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
E:\FR\FM\22MRN1.SGM
22MRN1
Agencies
[Federal Register Volume 88, Number 55 (Wednesday, March 22, 2023)]
[Notices]
[Page 17207]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-05893]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2701-061]
Erie Boulevard Hydropower, L.P.; Notice of Denial of Water
Quality Certification
On February 26, 2021, Erie Boulevard Hydropower, L.P. (Erie) filed
an application for a license for the West Canada Creek Hydroelectric
Project (project) in the above captioned docket. Erie filed with the
New York State Department of Environmental Conservation (New York DEC)
a request for water quality certification for the project under section
401(a)(1) of the Clean Water Act on March 9, 2022. On March 7, 2023,
New York DEC denied certification for the project. Pursuant to 40 CFR
121.8, we are providing notice that New York DEC's denial satisfies the
requirements of 40 CFR 121.7(e).
Dated: March 16, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-05893 Filed 3-21-23; 8:45 am]
BILLING CODE 6717-01-P