provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
Saguaro proposes to site, construct,
connect, operate, and maintain a 48inch-diameter natural gas pipeline from
the United States (U.S.) to the Mexico
International Border in Hudspeth
County, Texas. The pipeline would
extend from State of Texas land to the
U.S.–Mexico international border in the
middle of the Rio Grande River. The
Project would consist of the installation
of approximately 1,000 feet of 48-inchdiameter pipeline, establishment of a
50-foot-width permanent right-of-way,
and use of approximately 14.2 acres as
temporary workspaces and 6.9 miles of
temporary access road.
lotter on DSK11XQN23PROD with NOTICES1
Background
On February 3, 2023, the Commission
issued a Notice of Scoping Period
Requesting Comments on
Environmental Issues for the Proposed
Borders Facilities Project (Notice of
Scoping). The Notice of Scoping was
sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. In response to
the Notice of Scoping, the Commission
received several comments. The primary
issues raised by the commenters are
environmental justice, cultural
resources, and pipeline safety. The U.S.
Environmental Protection Agency (EPA)
provided recommendations to FERC
regarding air quality, water quality,
hazardous waste, and environmental
justice. EPA’s recommendations for
these resources included comments
regarding cumulative impacts for the
non-jurisdictional pipeline connected to
the Project and consultation with the
U.S. Army Corps of Engineers regarding
Clean Water Act Section 404 waters. All
substantive comments will be addressed
in the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
service provides automatic notification
of filings made to subscribed dockets,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
VerDate Sep<11>2014
16:52 Mar 21, 2023
Jkt 259001
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP23–29), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: March 15, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–05789 Filed 3–21–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14514–003]
Community of Elfin Cove Non Profit
Corporation, DBA Elfin Cove Utility
Commission; Notice of Availability of
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR 1 part 380, the
Office of Energy Projects has reviewed
the application for a license to construct
and operate the Crooked Creek and Jim’s
Lake Hydroelectric Project. The project
would be located on Crooked Creek and
Jim’s Lake, near the community of Elfin
Cove, in the Sitka Recording District,
Unorganized Borough, Alaska.
Commission staff has prepared an
Environmental Assessment (EA) for the
project. The project would occupy 10.5
acres of federal land in the Tongass
National Forest, managed by the U.S.
Department of Agriculture’s Forest
Service.
The EA contains the staff’s analysis of
the potential environmental impacts of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
The Commission provides all
interested persons with an opportunity
to view and/or print the EA via the
internet through the Commission’s
Home Page (https://www.ferc.gov/), using
the ‘‘eLibrary’’ link. Enter the docket
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
17209
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, you may submit
a paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–
14514–003.
For further information, contact John
Matkowski at (202) 502–8576 or by
email at john.matkowski@ferc.gov.
Dated: March 15, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–05792 Filed 3–21–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–82–000]
Columbia Gas Transmission, LLC.;
Notice of Application and Establishing
Intervention Deadline
Take notice that on March 2, 2023,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite
1300, Houston, Texas 77002–2700 filed
in the above referenced docket an
E:\FR\FM\22MRN1.SGM
22MRN1
lotter on DSK11XQN23PROD with NOTICES1
17210
Federal Register / Vol. 88, No. 55 / Wednesday, March 22, 2023 / Notices
application pursuant to section 7(b) of
the Natural Gas Act and Part 157 of the
Federal Energy Regulatory
Commission’s (Commission) requesting
authorization to abandon 37 injection/
withdrawal wells, associated pipelines,
and appurtenances, located in its Lucas
and Pavonia Storage in Ashland and
Richland Osceola Counties, Ohio, all as
more fully set forth in the application
which is on file with the Commission
and open for public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application should be directed to David
Alonzo, Manager, Project
Authorizations, 700 Louisiana Street,
Suite 1300, Houston, Texas 77002–2700
at 832–320–5477; or email at
David.Alonzo@tcenergy.com.
Pursuant to Section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
1 18
CFR (Code of Federal Regulations) 157.9.
VerDate Sep<11>2014
16:52 Mar 21, 2023
Jkt 259001
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on April 5, 2023. How to
file protests, motions to intervene, and
comments is explained below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,2 any person 3 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,4 and must be submitted by
the protest deadline, which is April 5,
2023. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 5 and the regulations under
the NGA 6 by the intervention deadline
for the project, which is April 5, 2023.
As described further in Rule 214, your
2 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
4 18 CFR 157.205(e).
5 18 CFR 385.214.
6 18 CFR 157.10.
3 Persons
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
how-guides.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before April 5,
2023. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–82–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 7
7 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
E:\FR\FM\22MRN1.SGM
22MRN1
Federal Register / Vol. 88, No. 55 / Wednesday, March 22, 2023 / Notices
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–82–
000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To send via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FERCOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served to the applicant by mail
to: David Alonzo, Manager, Project
Authorizations, 700 Louisiana Street,
Suite 1300, Houston, Texas 77002–2700
or by email (with a link to the
document) at david.alonzo@
tcenergy.com.
Any subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
lotter on DSK11XQN23PROD with NOTICES1
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to https://www.ferc.gov/ferconline/overview.
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
VerDate Sep<11>2014
16:52 Mar 21, 2023
Jkt 259001
Dated: March 15, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–05790 Filed 3–21–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL23–46–000]
Midcontinent Independent System
Operator, Inc.; Notice of Institution of
Section 206 Proceeding and Refund
Effective Date
On March 17, 2023, the Commission
issued an order in Docket No. EL23–46–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e, instituting an investigation into
whether Midcontinent Independent
System Operator, Inc.’s failure to update
its system-wide Unforced Capacity/
Intermediate Seasonal Accredited
Capacity ratio is inconsistent with
Schedule 53 of the Open Access
Transmission, Energy and Operating
Reserve Markets Tariff and may be
unjust, unreasonable, unduly
discriminatory or preferential, or
otherwise unlawful and to establish a
refund effective date. Midcontinent
Indep. Sys. Operator, Inc., 182 FERC
¶ 61,176 (2023).
The refund effective date in Docket
No. EL23–46–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL23–46–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2022),
within 5 days of the date of publication
of this notice in the Federal Register.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
17211
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
In lieu of electronic filing, you may
submit a paper copy. Submissions sent
via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Dated: March 17, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–05933 Filed 3–21–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–42–001]
Northern Natural Gas Company; Notice
of Application Requesting an
Amendment to Certificate of Public
Interest and Necessity
Take notice that on March 14, 2023,
Northern Natural Gas Company
(Northern), 1111 South 103rd Street,
Omaha, NE 68124, filed an application
pursuant to Section 7 of the Natural Gas
Act (NGA) to amend the certificate
issued on December 7, 2022, authorizing
Northern to: (1) abandon in-place
approximately 82.70 miles of 20-inchdiameter A-line and appurtenances in
Boone, Webster, Wright, and Hancock
counties, Iowa; and (2) install the
approximately 6.04-mile extension of its
30-inch-diameter D-line extension and
above-ground facilities, all with
appurtenances, in Wright County, Iowa,
all as more fully set forth in the request,
which is on file with the Commission
and open to public inspection.
Specifically, Northern has determined
based on the hydraulic analysis, that
existing capacity demands on the
existing pipeline system can be
adequately met by reducing the length
of the proposed D-line Extension to 1.51
miles. In addition to reducing the length
of pipeline, Northern is no longer
proposing to install a pipeline
inspection gauge (pig) receiver and
E:\FR\FM\22MRN1.SGM
22MRN1
Agencies
[Federal Register Volume 88, Number 55 (Wednesday, March 22, 2023)]
[Notices]
[Pages 17209-17211]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-05790]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-82-000]
Columbia Gas Transmission, LLC.; Notice of Application and
Establishing Intervention Deadline
Take notice that on March 2, 2023, Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite 1300, Houston, Texas 77002-2700
filed in the above referenced docket an
[[Page 17210]]
application pursuant to section 7(b) of the Natural Gas Act and Part
157 of the Federal Energy Regulatory Commission's (Commission)
requesting authorization to abandon 37 injection/withdrawal wells,
associated pipelines, and appurtenances, located in its Lucas and
Pavonia Storage in Ashland and Richland Osceola Counties, Ohio, all as
more fully set forth in the application which is on file with the
Commission and open for public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions concerning this application should be directed to
David Alonzo, Manager, Project Authorizations, 700 Louisiana Street,
Suite 1300, Houston, Texas 77002-2700 at 832-320-5477; or email at
[email protected].
Pursuant to Section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on April 5, 2023. How
to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\2\ any person \3\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\2\ 18 CFR 157.205.
\3\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\4\ and must be submitted by
the protest deadline, which is April 5, 2023. A protest may also serve
as a motion to intervene so long as the protestor states it also seeks
to be an intervenor.
---------------------------------------------------------------------------
\4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \5\ and the regulations under the NGA \6\ by the
intervention deadline for the project, which is April 5, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/how-guides.
---------------------------------------------------------------------------
\5\ 18 CFR 385.214.
\6\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before April 5, 2023. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP23-82-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \7\
---------------------------------------------------------------------------
\7\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
[[Page 17211]]
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
---------------------------------------------------------------------------
number CP23-82-000.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426
To send via any other courier, use the following address: Kimberly D.
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
Protests and motions to intervene must be served to the applicant
by mail to: David Alonzo, Manager, Project Authorizations, 700
Louisiana Street, Suite 1300, Houston, Texas 77002-2700 or by email
(with a link to the document) at [email protected]
Any subsequent submissions by an intervenor must be served on the
applicant and all other parties to the proceeding. Contact information
for parties can be downloaded from the service list at the eService
link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to https://www.ferc.gov/ferc-online/overview.
Dated: March 15, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-05790 Filed 3-21-23; 8:45 am]