Combined Notice of Filings #1, 16969-16970 [2023-05777]
Download as PDF
Federal Register / Vol. 88, No. 54 / Tuesday, March 21, 2023 / Notices
ddrumheller on DSK120RN23PROD with NOTICES1
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 10
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–87–
000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: Lori Myerchin, Director,
Regulatory Affairs and Transportation
Services, WBI Energy Transmission,
Inc., 1250 West Century Avenue,
Bismarck, North Dakota 58503, at (701)
530–1563 or lori.myerchin@
wbienergy.com.
Any subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
10 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
VerDate Sep<11>2014
19:23 Mar 20, 2023
Jkt 259001
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: March 14, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–05661 Filed 3–20–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER22–709–004.
Applicants: Missouri Joint Municipal
Electric Utility Commission, Southwest
Power Pool, Inc.
Description: Compliance filing:
Missouri Joint Municipal Electric Utility
Commission submits tariff filing per 35:
Settlement Compliance Filing of
MJMEUC in Response to February 16
Order to be effective 6/1/2022.
Filed Date: 3/15/23.
Accession Number: 20230315–5037.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23–1349–000.
Applicants: Northern States Power
Company, a Wisconsin corporation,
Northern States Power Company, a
Minnesota corporation.
Description: § 205(d) Rate Filing:
Northern States Power Company, a
Wisconsin corporation submits tariff
filing per 35.13(a)(2)(iii: 2023
Interchange Agreement Annual Filing to
be effective 1/1/2023.
Filed Date: 3/15/23.
Accession Number: 20230315–5024.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23–1350–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Services Company.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2023–03–15_SA 4006
Ameren Missouri-Hannibal Wholesale
Connection Agreement to be effective
5/15/2023.
Filed Date: 3/15/23.
Accession Number: 20230315–5029.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23–1351–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2023–03–15_SA 3482 ATC-Wisconsin
Electric Power 2nd Rev GIA (J878 J1316)
to be effective 3/8/2023.
Filed Date: 3/15/23.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
16969
Accession Number: 20230315–5034.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23–1357–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Amendment to Rate Schedule FERC No.
27 to be effective 5/15/2023.
Filed Date: 3/15/23.
Accession Number: 20230315–5047.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23–1358–000.
Applicants: AmeriPro Energy Corp.
Description: Baseline eTariff Filing:
Application for Market Based Rate
Authority to be effective 5/14/2023.
Filed Date: 3/15/23.
Accession Number: 20230315–5048.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23–1361–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Add Enhanced Language to
Attachment V (RR 523) to be effective
5/15/2023.
Filed Date: 3/15/23.
Accession Number: 20230315–5052.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23–1362–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: ISA,
SA No. 6821; Queue No. AF1–040 to be
effective 2/16/2023.
Filed Date: 3/15/23.
Accession Number: 20230315–5056.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23–1363–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
6822; Queue No. AF1–328 to be
effective 2/28/2023.
Filed Date: 3/15/23.
Accession Number: 20230315–5059.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23–1364–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Amendment to Rate Schedule FERC No.
26 to be effective 5/15/2023.
Filed Date: 3/15/23.
Accession Number: 20230315–5061.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23–1366–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Amendment to Rate Schedule FERC No.
21 to be effective 5/15/2023.
Filed Date: 3/15/23.
Accession Number: 20230315–5068.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23–1371–000.
E:\FR\FM\21MRN1.SGM
21MRN1
16970
Federal Register / Vol. 88, No. 54 / Tuesday, March 21, 2023 / Notices
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 6819; Queue No.
AC1–188 to be effective 2/15/2023.
Filed Date: 3/15/23.
Accession Number: 20230315–5092.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23–1372–000.
Applicants: Gaucho Solar LLC.
Description: Baseline eTariff Filing:
Reactive Power Tariff Application to be
effective 5/1/2023.
Filed Date: 3/15/23.
Accession Number: 20230315–5100.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23–1373–000.
Applicants: Hillcrest Solar I, LLC.
Description: § 205(d) Rate Filing:
Normal filing 2023 to be effective 3/16/
2023.
Filed Date: 3/15/23.
Accession Number: 20230315–5104.
Comment Date: 5 p.m. ET 4/5/23.
ddrumheller on DSK120RN23PROD with NOTICES1
Docket Numbers: ER23–1374–000.
Applicants: Massachusetts Electric
Company.
Description: § 205(d) Rate Filing: 2022
Rate Update Filing for Massachusetts
Electric Borderline Sales Agreement to
be effective 1/1/2022.
Filed Date: 3/15/23.
Accession Number: 20230315–5107.
Comment Date: 5 p.m. ET 4/5/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 15, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–05777 Filed 3–20–23; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
19:23 Mar 20, 2023
Jkt 259001
DEPARTMENT OF ENERGY
Western Area Power Administration
Notice of Final 2025 Olmsted Power
Marketing Plan
Western Area Power
Administration, DOE.
ACTION: Notice of final 2025 Olmsted
Power Marketing Plan.
AGENCY:
Western Area Power
Administration (WAPA), a Federal
Power Marketing Administration of the
Department of Energy (DOE), announces
its Final 2025 Olmsted Power Marketing
Plan (Marketing Plan) for the Colorado
River Storage Project (CRSP)
Management Center (MC). On
September 30, 2024, all of Olmsted
Power Plant Replacement Project
(Olmsted Project) energy sales contracts
(Contracts) will expire. This notice
responds to comments received on the
Proposed 2025 Olmsted Power
Marketing Plan (Proposed Plan)
published in the Federal Register June
1, 2022, and sets forth the Marketing
Plan. The Marketing Plan specifies the
terms and conditions under which
WAPA will market energy from the
Olmsted Project beginning October 1,
2024, through September 30, 2054. This
Marketing Plan supersedes the previous
Olmsted Project marketing plan. WAPA
will offer new Contracts for the sale of
energy to existing customers
(Customers) as more fully described in
the Marketing Plan. The Marketing Plan
also establishes one resource pool (2034
Resource Pool) of up to 3 percent of the
marketable resource under contract at
the time of reallocation to be available
for eligible new preference entities or
Customers. The 2034 Resource Pool will
be under Contract by October 1, 2034.
WAPA will publish the application
procedures for the 2034 Resource Pool
in a separate Federal Register notice.
DATES: The Marketing Plan will become
applicable April 20, 2023 in order to
make power allocations and complete
the other processes necessary to begin
providing services on October 1, 2024.
FOR FURTHER INFORMATION CONTACT: Mr.
Rodney G. Bailey, CRSP Manager, CRSP
MC, Western Area Power
Administration, 1800 South Rio Grande
Avenue, Montrose, CO 81401, by email
at Olmsted-Marketing@wapa.gov, by
telephone at 970–252–3000, or by fax at
970–240–6282. Information on
development of the Marketing Plan can
be found at https://www.wapa.gov/
regions/CRSP/PowerMarketing/Pages/
power-marketing.aspx.
SUPPLEMENTARY INFORMATION:
SUMMARY:
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Background
The Olmsted Project is located at the
mouth of Provo Canyon in northern
Utah and is part of the Central Utah
Project, a participating project of CRSP.
In 1987, the United States Department
of the Interior, Bureau of Reclamation
(Reclamation) secured ownership of the
Olmsted Flowline, located in northern
Utah, from PacifiCorp (formerly known
as Utah Power and Light), and the
associated water rights as an essential
part of the Central Utah Project. In a
related 1990 Settlement Agreement, the
Olmsted generation facilities were
acquired in condemnation proceedings
by the United States to better secure and
develop water rights for the Central
Utah Project. As part of the
condemnation proceedings, PacifiCorp
continued generating power at Olmsted
until September 22, 2015. Power
generation at the site ceased on that
date, and Reclamation assumed
responsibility for operating the Olmsted
Project.
A comprehensive evaluation of the
existing 100-year-old Olmsted facilities
determined it had greatly exceeded its
operational life, and a replacement
hydroelectric facility was necessary. On
February 4, 2015, an Implementation
Agreement (Agreement) for the Olmsted
Project was signed by the Central Utah
Water Conservancy District (District),
Reclamation, DOE, and WAPA
(Participants) to set forth the
responsibilities of the participants and
how the Olmsted Project would be
funded. During the second quarter of
calendar year 2016, pursuant to the
Agreement, the District began
constructing the 12-megawatt, $42
million replacement hydroelectric
facility and new power transmission
line to the nearby Provo Power system.
Olmsted Powerplant construction was
completed in July 2018 and started
commercial power production in
October 2018. The Olmsted Project is a
Federal facility operated and
maintained by the District in connection
with its Central Utah Project operations.
The Olmsted Project is a ‘‘run-of-theriver’’ plant producing power only
when water demands from downstream
users necessitate water deliveries.
The Marketing Plan, herein, describes
how CRSP Management Center will
market Federal energy from the Olmsted
Project beginning October 1, 2024,
through September 30, 2054. As part of
the Marketing Plan, WAPA will
establish one 2034 Resource Pool of 3
percent of the net marketable resource
(minus the District’s allocation) under
contract at the time of each reallocation
to be available for eligible new
E:\FR\FM\21MRN1.SGM
21MRN1
Agencies
[Federal Register Volume 88, Number 54 (Tuesday, March 21, 2023)]
[Notices]
[Pages 16969-16970]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-05777]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER22-709-004.
Applicants: Missouri Joint Municipal Electric Utility Commission,
Southwest Power Pool, Inc.
Description: Compliance filing: Missouri Joint Municipal Electric
Utility Commission submits tariff filing per 35: Settlement Compliance
Filing of MJMEUC in Response to February 16 Order to be effective 6/1/
2022.
Filed Date: 3/15/23.
Accession Number: 20230315-5037.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23-1349-000.
Applicants: Northern States Power Company, a Wisconsin corporation,
Northern States Power Company, a Minnesota corporation.
Description: Sec. 205(d) Rate Filing: Northern States Power
Company, a Wisconsin corporation submits tariff filing per
35.13(a)(2)(iii: 2023 Interchange Agreement Annual Filing to be
effective 1/1/2023.
Filed Date: 3/15/23.
Accession Number: 20230315-5024.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23-1350-000.
Applicants: Midcontinent Independent System Operator, Inc., Ameren
Services Company.
Description: Sec. 205(d) Rate Filing: Midcontinent Independent
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2023-
03-15_SA 4006 Ameren Missouri-Hannibal Wholesale Connection Agreement
to be effective 5/15/2023.
Filed Date: 3/15/23.
Accession Number: 20230315-5029.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23-1351-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2023-03-15_SA 3482 ATC-
Wisconsin Electric Power 2nd Rev GIA (J878 J1316) to be effective 3/8/
2023.
Filed Date: 3/15/23.
Accession Number: 20230315-5034.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23-1357-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Amendment to Rate Schedule
FERC No. 27 to be effective 5/15/2023.
Filed Date: 3/15/23.
Accession Number: 20230315-5047.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23-1358-000.
Applicants: AmeriPro Energy Corp.
Description: Baseline eTariff Filing: Application for Market Based
Rate Authority to be effective 5/14/2023.
Filed Date: 3/15/23.
Accession Number: 20230315-5048.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23-1361-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Revisions to Add Enhanced
Language to Attachment V (RR 523) to be effective 5/15/2023.
Filed Date: 3/15/23.
Accession Number: 20230315-5052.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23-1362-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: ISA, SA No. 6821; Queue No.
AF1-040 to be effective 2/16/2023.
Filed Date: 3/15/23.
Accession Number: 20230315-5056.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23-1363-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, Service
Agreement No. 6822; Queue No. AF1-328 to be effective 2/28/2023.
Filed Date: 3/15/23.
Accession Number: 20230315-5059.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23-1364-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Amendment to Rate Schedule
FERC No. 26 to be effective 5/15/2023.
Filed Date: 3/15/23.
Accession Number: 20230315-5061.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23-1366-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Amendment to Rate Schedule
FERC No. 21 to be effective 5/15/2023.
Filed Date: 3/15/23.
Accession Number: 20230315-5068.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23-1371-000.
[[Page 16970]]
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, SA No. 6819;
Queue No. AC1-188 to be effective 2/15/2023.
Filed Date: 3/15/23.
Accession Number: 20230315-5092.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23-1372-000.
Applicants: Gaucho Solar LLC.
Description: Baseline eTariff Filing: Reactive Power Tariff
Application to be effective 5/1/2023.
Filed Date: 3/15/23.
Accession Number: 20230315-5100.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23-1373-000.
Applicants: Hillcrest Solar I, LLC.
Description: Sec. 205(d) Rate Filing: Normal filing 2023 to be
effective 3/16/2023.
Filed Date: 3/15/23.
Accession Number: 20230315-5104.
Comment Date: 5 p.m. ET 4/5/23.
Docket Numbers: ER23-1374-000.
Applicants: Massachusetts Electric Company.
Description: Sec. 205(d) Rate Filing: 2022 Rate Update Filing for
Massachusetts Electric Borderline Sales Agreement to be effective 1/1/
2022.
Filed Date: 3/15/23.
Accession Number: 20230315-5107.
Comment Date: 5 p.m. ET 4/5/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 15, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-05777 Filed 3-20-23; 8:45 am]
BILLING CODE 6717-01-P