Projects Approved for Consumptive Uses of Water, 16075-16076 [2023-05244]
Download as PDF
Federal Register / Vol. 88, No. 50 / Wednesday, March 15, 2023 / Notices
the Line.1 The verified notice indicates
that MHRA controls BC&S and that
BC&S does not object to the proposed
transaction by which it would be
replaced by ONR as operator on the
Line.
ONR certifies that the agreement
governing the proposed transaction does
not have an interchange commitment.
ONR further certifies that its projected
annual revenues will not exceed $5
million and will not result in ONR’s
becoming a Class I or Class II rail
carrier. Under 49 CFR 1150.32(b), a
change in operator requires that notice
be given to shippers. ONR states that
there are currently no customers on the
Line, and accordingly, no shippers to
notify of the transaction.
The earliest this transaction may be
consummated is March 29, 2023. ONR
states that it expects to consummate its
acquisition of, and commence common
carrier operations over, the Line on or
after that date.
If the verified notice contains false or
misleading information, the exemption
is void ab initio. Petitions to revoke the
exemption under 49 U.S.C. 10502(d)
may be filed at any time. The filing of
a petition to revoke will not
automatically stay the effectiveness of
the exemption. Petitions for stay must
be filed no later than March 22, 2023 (at
least seven days before the exemption
becomes effective).
All pleadings, referring to Docket No.
FD 36674, must be filed with the
Surface Transportation Board either via
e-filing on the Board’s website or in
writing addressed to 395 E Street SW,
Washington, DC 20423–0001. In
addition, a copy of each pleading must
be served on ONR’s representative,
Bradon J. Smith, Fletcher & Sippel LLC,
29 North Wacker Drive, Suite 800,
Chicago, IL 60606.
According to ONR, this action is
categorically excluded from
environmental review under 49 CFR
1105.6(c) and from historic preservation
reporting requirements under 49 CFR
1105.8(b).
Board decisions and notices are
available at www.stb.gov.
lotter on DSK11XQN23PROD with NOTICES1
Decided: March 9, 2023.
1 ONR
notes that Midland Railroad LLC secured
permissive authority to acquire the line and operate
it in place of BC&S in Midland Railroad—
Acquisition & Change in Operator Exemption—
Midland Historical Railway Ass’n, FD 36640 (STB
served Sept. 15, 2022), but did not undertake the
authorized transaction and has sought permission
from the Board to withdraw its notice of exemption
in that docket.
VerDate Sep<11>2014
18:48 Mar 14, 2023
Jkt 259001
By the Board, Scott M. Zimmerman, Acting
Director, Office of Proceedings.
Tammy Lowery,
Clearance Clerk.
[FR Doc. 2023–05223 Filed 3–14–23; 8:45 am]
BILLING CODE 4915–01–P
SURFACE TRANSPORTATION BOARD
[Docket No. FD 36675]
Chicago Rock Island & Pacific Railroad
LLC—Continuance in Control
Exemption—Ottawa Northern Railroad
LLC
Chicago Rock Island & Pacific
Railroad LLC (Rock Island), a Class III
rail carrier, has filed a verified notice of
exemption under 49 CFR 1180.2(d)(2) to
continue in control of Ottawa Northern
Railroad LLC (ONR), a noncarrier
controlled by Rock Island, upon ONR’s
becoming a Class III rail carrier.
According to the verified notice, the
proposed transaction will allow Rock
Island to continue to exercise common
control of ONR and Rock Island’s
existing subsidiary, Gulf & Ship Island
Railroad LLC (G&SI), a Class III rail
carrier that operates in the state of
Mississippi.1
This transaction is related to a
concurrently filed verified notice of
exemption in Ottawa Northern
Railroad—Acquisition & Change in
Operator Exemption—Midland
Historical Railway Ass’n., Docket No.
FD 36674, in which ONR seeks to
acquire and begin common carrier
operations over approximately 11.09
miles of rail line owned by the Midland
Historical Railway Association between
milepost 14.95 near Baldwin City, Kan.,
and milepost 26.04 at Ottawa, Kan.,
replacing Leavenworth, Lawrence &
Galveston Railroad d/b/a the Baldwin
City & Southern Railroad Company as
the common carrier service provider on
that line.
Rock Island represents that: (1) the
rail line to be operated by ONR does not
connect with Rock Island’s lines or any
of G&SI’s lines; (2) the control
transaction is not part of a series of
anticipated transactions that would
result in such a connection; and (3) the
transaction does not involve a Class I
rail carrier. The proposed transaction is
therefore exempt from the prior
1 Rock
Island notes that the notice of exemption
filed in Chicago, Rock Island & Pacific Railroad—
Continuance in Control Exemption—Gulf & Ship
Island Railroad, Docket No. FD 36520, mistakenly
lists ‘‘Mississippi Delta’’ as a Class III carrier under
Rock Island’s control. Rock Island explains that
‘‘Mississippi Delta’’ is a trade name for Rock
Island’s contract carriage north of Swan Lake, Miss.,
and not a railroad common carrier.
PO 00000
Frm 00124
Fmt 4703
Sfmt 4703
16075
approval requirements of 49 U.S.C.
11323 pursuant to 49 CFR 1180.2(d)(2).
The transaction may be consummated
on or after March 29, 2023, the effective
date of the exemption (30 days after the
verified notice was filed).
Under 49 U.S.C. 10502(g), the Board
may not use its exemption authority to
relieve a rail carrier of its statutory
obligation to protect the interests of its
employees. However, 49 U.S.C. 11326(c)
does not provide for labor protection for
transactions under 49 U.S.C. 11324 and
11325 that involve only Class III rail
carriers. Because this transaction
involves Class III rail carriers only, the
Board, under the statute, may not
impose labor protective conditions for
this transaction.
If the verified notice contains false or
misleading information, the exemption
is void ab initio. Petitions to revoke the
exemption under 49 U.S.C. 10502(d)
may be filed at any time. The filing of
a petition to revoke will not
automatically stay the effectiveness of
the exemption. Petitions for stay must
be filed no later than March 22, 2023 (at
least seven days before the exemption
becomes effective).
All pleadings, referring to Docket No.
FD 36675, must be filed with the
Surface Transportation Board either via
e-filing on the Board’s website or in
writing addressed to 395 E Street SW,
Washington, DC 20423–0001. In
addition, one copy of each pleading
must be served on Rock Island’s
representative, Bradon J. Smith, Fletcher
& Sippel LLC, 29 North Wacker Drive,
Suite 800, Chicago, IL 60606–3208.
According to Rock Island, this action
is categorically excluded from
environmental review under 49 CFR
1105.6(c) and from historic reporting
requirements under 49 CFR 1105.8(b).
Board decisions and notices are
available at www.stb.gov.
Decided: March 9, 2023.
By the Board, Scott M. Zimmerman, Acting
Director, Office of Proceedings.
Tammy Lowery,
Clearance Clerk.
[FR Doc. 2023–05245 Filed 3–14–23; 8:45 am]
BILLING CODE 4915–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Projects Approved for Consumptive
Uses of Water
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
This notice lists Approvals by
Rule for projects by the Susquehanna
SUMMARY:
E:\FR\FM\15MRN1.SGM
15MRN1
16076
Federal Register / Vol. 88, No. 50 / Wednesday, March 15, 2023 / Notices
River Basin Commission during the
period set forth in DATES.
DATES: February 1–28, 2023.
ADDRESSES: Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423, ext. 1312; fax: (717)
238–2436; email: joyler@srbc.net.
Regular mail inquiries may be sent to
the above address.
SUPPLEMENTARY INFORMATION: This
notice lists the projects, described
below, receiving approval for the
consumptive use of water pursuant to
the Commission’s approval by rule
process set forth in 18 CFR 806.22 (e)
and (f) for the time period specified
above.
lotter on DSK11XQN23PROD with NOTICES1
Water Source Approval—Issued Under
18 CFR 806.22(f):
1. BKV Operating, LLC; Pad ID: Bonnice 2;
ABR–201011023.R2; Jessup Township,
Susquehanna County, Pa.; Consumptive Use
of Up to 5.0000 mgd; Approval Date:
February 9, 2023.
2. Blackhill Energy LLC; Pad ID: NICHOLS
1H Pad; ABR–201008090.R2; Smithfield
Township, Bradford County, Pa.;
Consumptive Use of Up to 4.9900 mgd;
Approval Date: February 9, 2023.
3. Chesapeake Appalachia, L.L.C.; Pad ID:
Dunny; ABR–201011066.R2; Windham
Township, Wyoming County, Pa.;
Consumptive Use of Up to 7.5000 mgd;
Approval Date: February 9, 2023.
4. Chesapeake Appalachia, L.L.C.; Pad ID:
Lytwyn; ABR–201011028.R2; Smithfield
Township, Bradford County, Pa.;
Consumptive Use of Up to 7.5000 mgd;
Approval Date: February 9, 2023.
5. Coterra Energy Inc.; Pad ID: EmpetD P1;
ABR–201211007.R2; Harford Township,
Susquehanna County, Pa.; Consumptive Use
of Up to 5.0000 mgd; Approval Date:
February 9, 2023.
6. Coterra Energy Inc.; Pad ID: McLeanD
P1; ABR–201211009.R2; Lathrop Township,
Susquehanna County, Pa.; Consumptive Use
of Up to 5.0000 mgd; Approval Date:
February 9, 2023.
7. Coterra Energy Inc.; Pad ID: WoodE P1;
ABR–201211008.R2; Dimock Township,
Susquehanna County, Pa.; Consumptive Use
of Up to 5.0000 mgd; Approval Date:
February 9, 2023.
8. EOG Resources, Inc.; Pad ID:
RIGHTMIRE 2H Pad; ABR–201008083.R2;
Ridgebury Township, Bradford County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: February 9, 2023.
9. EXCO Resources (PA), LLC; Pad ID: COP
Tract 727 (Pad 3); ABR–201211011.R2;
Gallagher Township, Clinton County, Pa.;
Consumptive Use of Up to 8.0000 mgd;
Approval Date: February 9, 2023.
10. Repsol Oil & Gas USA, LLC; Pad ID:
ABELL LIVING TRUST (05 082); ABR–
201011052.R2; Warren Township, Bradford
County, Pa.; Consumptive Use of Up to
VerDate Sep<11>2014
18:48 Mar 14, 2023
Jkt 259001
6.0000 mgd; Approval Date: February 9,
2023.
11. SWN Production Company, LLC; Pad
ID: MULLOY PAD; ABR–201209008.R2;
Jackson Township, Susquehanna County, Pa.;
Consumptive Use of Up to 4.9990 mgd;
Approval Date: February 9, 2023.
12. SWN Production Company, LLC; Pad
ID: TI–01 Mase Monte; ABR–201711002.R1;
Liberty Township, Tioga County, Pa.;
Consumptive Use of Up to 4.9990 mgd;
Approval Date: February 9, 2023.
13. Blackhill Energy LLC; Pad ID:
KINGSLEY 4H; ABR–201008079.R2;
Springfield Township, Bradford County, Pa.;
Consumptive Use of Up to 4.9900 mgd;
Approval Date: February 14, 2023.
14. Repsol Oil & Gas USA, LLC; Pad ID:
HUTCHINSON (05 165) R; ABR–
201011064.R2; Warren Township, Bradford
County, Pa.; Consumptive Use of Up to
6.0000 mgd; Approval Date: February 16,
2023.
15. Coterra Energy Inc.; Pad ID: HordisC
P1; ABR–201211016.R2; Lathrop Township,
Susquehanna County, Pa.; Consumptive Use
of Up to 5.0000 mgd; Approval Date:
February 20, 2023.
16. Seneca Resources Company, LLC; Pad
ID: Neal 815; ABR–201011058.R2; Chatham
Township, Tioga County, Pa.; Consumptive
Use of Up to 4.0000 mgd; Approval Date:
February 20, 2023.
17. Seneca Resources Company, LLC; Pad
ID: Propheta 288; ABR–201011078.R2;
Charleston Township, Tioga County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: February 20, 2023.
18. Seneca Resources Company, LLC; Pad
ID: Sevem 474; ABR–201011071.R2;
Charleston Township, Tioga County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: February 20, 2023.
19. SWN Production Company, LLC; Pad
ID: HARRIS PAD; ABR–201211015.R2;
Harford Township, Susquehanna County,
Pa.; Consumptive Use of Up to 4.9990 mgd;
Approval Date: February 20, 2023.
20. SWN Production Company, LLC; Pad
ID: LOKE PAD; ABR–201211014.R2; New
Milford Township, Susquehanna County, Pa.;
Consumptive Use of Up to 4.9990 mgd;
Approval Date: February 20, 2023.
21. Chesapeake Appalachia, L.L.C.; Pad ID:
Allen Drilling Pad; ABR–201009002.R2.1;
Asylum Township, Bradford County, Pa.;
Consumptive Use of Up to 7.5000 mgd;
Approval Date: February 20, 2023.
22. Chesapeake Appalachia, L.L.C.; Pad ID:
Kerrick Drilling Pad; ABR–201103040.R2.1;
Asylum Township, Bradford County, Pa.;
Consumptive Use of Up to 7.5000 mgd;
Approval Date: February 20, 2023.
23. Chesapeake Appalachia, L.L.C.; Pad ID:
Bishop Drilling Pad; ABR–201212014.R2;
Auburn Township, Susquehanna County,
Pa.; Consumptive Use of Up to 7.5000 mgd;
Approval Date: February 26, 2023.
24. Chesapeake Appalachia, L.L.C.; Pad ID:
Harvey Drilling Pad; ABR–201212015.R2;
Lemon Township, Wyoming County, Pa.;
Consumptive Use of Up to 7.5000 mgd;
Approval Date: February 26, 2023.
25. Chesapeake Appalachia, L.L.C.; Pad ID:
SGL 12 N WEST DRILLING PAD; ABR–
201801001.R1; Leroy Township, Bradford
PO 00000
Frm 00125
Fmt 4703
Sfmt 4703
County, Pa.; Consumptive Use of Up to
7.5000 mgd; Approval Date: February 26,
2023.
26. Coterra Energy Inc.; Pad ID: KielarD P1;
ABR–201112002.R2; Lathrop Township,
Susquehanna County, Pa.; Consumptive Use
of Up to 5.0000 mgd; Approval Date:
February 26, 2023.
27. SWN Production Company, LLC; Pad
ID: SHELDON EAST PAD; ABR–
201211013.R2; Thompson Township,
Susquehanna County, Pa.; Consumptive Use
of Up to 4.9990 mgd; Approval Date:
February 26, 2023.
28. Chesapeake Appalachia, L.L.C.; Pad ID:
Cochran Drilling Pad; ABR–201301003.R2;
West Burlington Township, Bradford County,
Pa.; Consumptive Use of Up to 7.5000 mgd;
Approval Date: February 28, 2023.
29. Coterra Energy Inc.; Pad ID: TeddickM
P3; ABR–201212006.R2; Brooklyn Township,
Susquehanna County, Pa.; Consumptive Use
of Up to 5.0000 mgd; Approval Date:
February 28, 2023.
30. Seneca Resources Company, LLC; Pad
ID: I G Coveney Revocable LVG Trust 282;
ABR–201012032.R2; Richmond Township,
Tioga County, Pa.; Consumptive Use of Up to
4.0000 mgd; Approval Date: February 28,
2023.
31. SWN Production Company, LLC; Pad
ID: PLATUS PAD; ABR–201212004.R2; New
Milford Township, Susquehanna County, Pa.;
Consumptive Use of Up to 4.9990 mgd;
Approval Date: February 28, 2023.
32. SWN Production Company, LLC; Pad
ID: RACINE PAD; ABR–201212003.R2; New
Milford Township, Susquehanna County, Pa.;
Consumptive Use of Up to 4.9990 mgd;
Approval Date: February 28, 2023.
Authority: Public Law 91–575, 84
Stat. 1509 et seq., 18 CFR parts 806 and
808.
Dated: March 9, 2023.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2023–05244 Filed 3–14–23; 8:45 am]
BILLING CODE 7040–01–P
DEPARTMENT OF TRANSPORTATION
Federal Transit Administration
[Docket No. FTA–2022–0029]
Proposed Asset Disposition Guidance
and Request for Comments
Federal Transit Administration
(FTA), Department of Transportation
(DOT).
ACTION: Notice of availability of
proposed guidance relating to an asset
disposition option for FTA recipients
under the National Defense
Authorization Act (NDAA) for fiscal
year 2022.
AGENCY:
The Federal Transit
Administration (FTA) has placed in the
docket, and on its website, proposed
SUMMARY:
E:\FR\FM\15MRN1.SGM
15MRN1
Agencies
[Federal Register Volume 88, Number 50 (Wednesday, March 15, 2023)]
[Notices]
[Pages 16075-16076]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-05244]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Projects Approved for Consumptive Uses of Water
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice lists Approvals by Rule for projects by the
Susquehanna
[[Page 16076]]
River Basin Commission during the period set forth in DATES.
DATES: February 1-28, 2023.
ADDRESSES: Susquehanna River Basin Commission, 4423 North Front Street,
Harrisburg, PA 17110-1788.
FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone: (717) 238-0423, ext. 1312; fax:
(717) 238-2436; email: [email protected]. Regular mail inquiries may be
sent to the above address.
SUPPLEMENTARY INFORMATION: This notice lists the projects, described
below, receiving approval for the consumptive use of water pursuant to
the Commission's approval by rule process set forth in 18 CFR 806.22
(e) and (f) for the time period specified above.
Water Source Approval--Issued Under 18 CFR 806.22(f):
1. BKV Operating, LLC; Pad ID: Bonnice 2; ABR-201011023.R2;
Jessup Township, Susquehanna County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: February 9, 2023.
2. Blackhill Energy LLC; Pad ID: NICHOLS 1H Pad; ABR-
201008090.R2; Smithfield Township, Bradford County, Pa.; Consumptive
Use of Up to 4.9900 mgd; Approval Date: February 9, 2023.
3. Chesapeake Appalachia, L.L.C.; Pad ID: Dunny; ABR-
201011066.R2; Windham Township, Wyoming County, Pa.; Consumptive Use
of Up to 7.5000 mgd; Approval Date: February 9, 2023.
4. Chesapeake Appalachia, L.L.C.; Pad ID: Lytwyn; ABR-
201011028.R2; Smithfield Township, Bradford County, Pa.; Consumptive
Use of Up to 7.5000 mgd; Approval Date: February 9, 2023.
5. Coterra Energy Inc.; Pad ID: EmpetD P1; ABR-201211007.R2;
Harford Township, Susquehanna County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: February 9, 2023.
6. Coterra Energy Inc.; Pad ID: McLeanD P1; ABR-201211009.R2;
Lathrop Township, Susquehanna County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: February 9, 2023.
7. Coterra Energy Inc.; Pad ID: WoodE P1; ABR-201211008.R2;
Dimock Township, Susquehanna County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: February 9, 2023.
8. EOG Resources, Inc.; Pad ID: RIGHTMIRE 2H Pad; ABR-
201008083.R2; Ridgebury Township, Bradford County, Pa.; Consumptive
Use of Up to 4.0000 mgd; Approval Date: February 9, 2023.
9. EXCO Resources (PA), LLC; Pad ID: COP Tract 727 (Pad 3); ABR-
201211011.R2; Gallagher Township, Clinton County, Pa.; Consumptive
Use of Up to 8.0000 mgd; Approval Date: February 9, 2023.
10. Repsol Oil & Gas USA, LLC; Pad ID: ABELL LIVING TRUST (05
082); ABR-201011052.R2; Warren Township, Bradford County, Pa.;
Consumptive Use of Up to 6.0000 mgd; Approval Date: February 9,
2023.
11. SWN Production Company, LLC; Pad ID: MULLOY PAD; ABR-
201209008.R2; Jackson Township, Susquehanna County, Pa.; Consumptive
Use of Up to 4.9990 mgd; Approval Date: February 9, 2023.
12. SWN Production Company, LLC; Pad ID: TI-01 Mase Monte; ABR-
201711002.R1; Liberty Township, Tioga County, Pa.; Consumptive Use
of Up to 4.9990 mgd; Approval Date: February 9, 2023.
13. Blackhill Energy LLC; Pad ID: KINGSLEY 4H; ABR-201008079.R2;
Springfield Township, Bradford County, Pa.; Consumptive Use of Up to
4.9900 mgd; Approval Date: February 14, 2023.
14. Repsol Oil & Gas USA, LLC; Pad ID: HUTCHINSON (05 165) R;
ABR-201011064.R2; Warren Township, Bradford County, Pa.; Consumptive
Use of Up to 6.0000 mgd; Approval Date: February 16, 2023.
15. Coterra Energy Inc.; Pad ID: HordisC P1; ABR-201211016.R2;
Lathrop Township, Susquehanna County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: February 20, 2023.
16. Seneca Resources Company, LLC; Pad ID: Neal 815; ABR-
201011058.R2; Chatham Township, Tioga County, Pa.; Consumptive Use
of Up to 4.0000 mgd; Approval Date: February 20, 2023.
17. Seneca Resources Company, LLC; Pad ID: Propheta 288; ABR-
201011078.R2; Charleston Township, Tioga County, Pa.; Consumptive
Use of Up to 4.0000 mgd; Approval Date: February 20, 2023.
18. Seneca Resources Company, LLC; Pad ID: Sevem 474; ABR-
201011071.R2; Charleston Township, Tioga County, Pa.; Consumptive
Use of Up to 4.0000 mgd; Approval Date: February 20, 2023.
19. SWN Production Company, LLC; Pad ID: HARRIS PAD; ABR-
201211015.R2; Harford Township, Susquehanna County, Pa.; Consumptive
Use of Up to 4.9990 mgd; Approval Date: February 20, 2023.
20. SWN Production Company, LLC; Pad ID: LOKE PAD; ABR-
201211014.R2; New Milford Township, Susquehanna County, Pa.;
Consumptive Use of Up to 4.9990 mgd; Approval Date: February 20,
2023.
21. Chesapeake Appalachia, L.L.C.; Pad ID: Allen Drilling Pad;
ABR-201009002.R2.1; Asylum Township, Bradford County, Pa.;
Consumptive Use of Up to 7.5000 mgd; Approval Date: February 20,
2023.
22. Chesapeake Appalachia, L.L.C.; Pad ID: Kerrick Drilling Pad;
ABR-201103040.R2.1; Asylum Township, Bradford County, Pa.;
Consumptive Use of Up to 7.5000 mgd; Approval Date: February 20,
2023.
23. Chesapeake Appalachia, L.L.C.; Pad ID: Bishop Drilling Pad;
ABR-201212014.R2; Auburn Township, Susquehanna County, Pa.;
Consumptive Use of Up to 7.5000 mgd; Approval Date: February 26,
2023.
24. Chesapeake Appalachia, L.L.C.; Pad ID: Harvey Drilling Pad;
ABR-201212015.R2; Lemon Township, Wyoming County, Pa.; Consumptive
Use of Up to 7.5000 mgd; Approval Date: February 26, 2023.
25. Chesapeake Appalachia, L.L.C.; Pad ID: SGL 12 N WEST
DRILLING PAD; ABR-201801001.R1; Leroy Township, Bradford County,
Pa.; Consumptive Use of Up to 7.5000 mgd; Approval Date: February
26, 2023.
26. Coterra Energy Inc.; Pad ID: KielarD P1; ABR-201112002.R2;
Lathrop Township, Susquehanna County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: February 26, 2023.
27. SWN Production Company, LLC; Pad ID: SHELDON EAST PAD; ABR-
201211013.R2; Thompson Township, Susquehanna County, Pa.;
Consumptive Use of Up to 4.9990 mgd; Approval Date: February 26,
2023.
28. Chesapeake Appalachia, L.L.C.; Pad ID: Cochran Drilling Pad;
ABR-201301003.R2; West Burlington Township, Bradford County, Pa.;
Consumptive Use of Up to 7.5000 mgd; Approval Date: February 28,
2023.
29. Coterra Energy Inc.; Pad ID: TeddickM P3; ABR-201212006.R2;
Brooklyn Township, Susquehanna County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: February 28, 2023.
30. Seneca Resources Company, LLC; Pad ID: I G Coveney Revocable
LVG Trust 282; ABR-201012032.R2; Richmond Township, Tioga County,
Pa.; Consumptive Use of Up to 4.0000 mgd; Approval Date: February
28, 2023.
31. SWN Production Company, LLC; Pad ID: PLATUS PAD; ABR-
201212004.R2; New Milford Township, Susquehanna County, Pa.;
Consumptive Use of Up to 4.9990 mgd; Approval Date: February 28,
2023.
32. SWN Production Company, LLC; Pad ID: RACINE PAD; ABR-
201212003.R2; New Milford Township, Susquehanna County, Pa.;
Consumptive Use of Up to 4.9990 mgd; Approval Date: February 28,
2023.
Authority: Public Law 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806 and 808.
Dated: March 9, 2023.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2023-05244 Filed 3-14-23; 8:45 am]
BILLING CODE 7040-01-P