Winooski Hydroelectric Company; Notice of Waiver Period for Water Quality Certification Application, 15707 [2023-05163]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 49 / Tuesday, March 14, 2023 / Notices
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may send a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 385.2010.
Locations of Notice of Intent: The
Commission provides all interested
persons an opportunity to view and/or
print the contents of this document via
the internet through the Commission’s
website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (i.e., CD23–5) in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
1 18
CFR 385.2001–2005 (2021).
VerDate Sep<11>2014
21:09 Mar 13, 2023
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
Copies of the notice of intent can be
obtained directly from the applicant.
For assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
Dated: March 8, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–05162 Filed 3–13–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6470–008]
Winooski Hydroelectric Company;
Notice of Waiver Period for Water
Quality Certification Application
On March 6, 2023, Winooski
Hydroelectric Company submitted to
the Federal Energy Regulatory
Commission (Commission) evidence of
the date on which the certifying agency
received the certification request for a
Clean Water Act section 401(a)(1) water
quality certification filed with the
Vermont Department of Environmental
Conservation, in conjunction with the
above-captioned project. Pursuant to 40
CFR 121.6 and section [4.34(b)(5),
5.23(b), 153.4, or 157.22] of the
Commission’s regulations,1 we hereby
notify the Vermont Department of
Environmental Conservation of the
following:
Date of Receipt of the Certification
Request: March 6, 2023.
Reasonable Period of Time To Act on
the Certification Request: One year
(March 6, 2024).
If the Vermont Department of
Environmental Conservation fails or
refuses to act on the water quality
certification request on or before the
above date, then the agency certifying
authority is deemed waived pursuant to
section 401(a)(1) of the Clean Water Act,
33 U.S.C. 1341(a)(1).
Dated: March 8, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–05163 Filed 3–13–23; 8:45 am]
BILLING CODE 6717–01–P
1
Jkt 259001
PO 00000
18 CFR [4.34(b)(5)/5.23(b)/153.4/157.22].
Frm 00069
Fmt 4703
Sfmt 4703
15707
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC23–60–000.
Applicants: NTUA Generation-Utah,
LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of NTUA GenerationUtah, LLC.
Filed Date: 3/7/23.
Accession Number: 20230307–5183.
Comment Date: 5 p.m. ET 3/28/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER23–68–004.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Amendment to ISA, SA No. 1949;
Queue No. NQ16 (amend) to be effective
12/12/2022.
Filed Date: 3/8/23.
Accession Number: 20230308–5007.
Comment Date: 5 p.m. ET 3/29/23.
Docket Numbers: ER23–651–001.
Applicants: Southwest Power Pool,
Inc
Description: Tariff Amendment: 4010
Plum Nellie Wind Farm & ITCGP FSADeficiency Response to be effective 2/
14/2023.
Filed Date: 3/8/23.
Accession Number: 20230308–5034.
Comment Date: 5 p.m. ET 3/29/23.
Docket Numbers: ER23–672–001.
Applicants: Southwest Power Pool,
Inc
Description: Tariff Amendment:
4039SO Ponderosa Wind II & SPS FSADeficiency Response to be effective 5/8/
2023.
Filed Date: 3/8/23.
Accession Number: 20230308–5002.
Comment Date: 5 p.m. ET 3/29/23.
Docket Numbers: ER23–1261–000.
Applicants: Dynegy Marketing and
Trade, LLC.
Description: Dynegy Marketing and
Trade, LLC Request Additional Cost
Recovery Pursuant to Section III.A.15 of
Appendix A to Market Rule 1 of the ISO
New England Tariff.
Filed Date: 3/6/23.
Accession Number: 20230306–5206.
Comment Date: 5 p.m. ET 3/27/23.
Docket Numbers: ER23–1262–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
E:\FR\FM\14MRN1.SGM
14MRN1
Agencies
[Federal Register Volume 88, Number 49 (Tuesday, March 14, 2023)]
[Notices]
[Page 15707]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-05163]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6470-008]
Winooski Hydroelectric Company; Notice of Waiver Period for Water
Quality Certification Application
On March 6, 2023, Winooski Hydroelectric Company submitted to the
Federal Energy Regulatory Commission (Commission) evidence of the date
on which the certifying agency received the certification request for a
Clean Water Act section 401(a)(1) water quality certification filed
with the Vermont Department of Environmental Conservation, in
conjunction with the above-captioned project. Pursuant to 40 CFR 121.6
and section [4.34(b)(5), 5.23(b), 153.4, or 157.22] of the Commission's
regulations,\1\ we hereby notify the Vermont Department of
Environmental Conservation of the following:
---------------------------------------------------------------------------
\1\ 18 CFR [4.34(b)(5)/5.23(b)/153.4/157.22].
---------------------------------------------------------------------------
Date of Receipt of the Certification Request: March 6, 2023.
Reasonable Period of Time To Act on the Certification Request: One
year (March 6, 2024).
If the Vermont Department of Environmental Conservation fails or
refuses to act on the water quality certification request on or before
the above date, then the agency certifying authority is deemed waived
pursuant to section 401(a)(1) of the Clean Water Act, 33 U.S.C.
1341(a)(1).
Dated: March 8, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-05163 Filed 3-13-23; 8:45 am]
BILLING CODE 6717-01-P