Sites Project Authority; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 15706-15707 [2023-05162]
Download as PDF
15706
Federal Register / Vol. 88, No. 49 / Tuesday, March 14, 2023 / Notices
text format (txt), a thumb drive, an MP3
file, braille, large print, audiotape, or
compact disc, or other accessible format.
Electronic Access to This Document:
The official version of this document is
the document published in the Federal
Register. You may access the official
edition of the Federal Register and the
Code of Federal Regulations at
www.govinfo.gov. At this site you can
view this document, as well as all other
documents of this Department
published in the Federal Register, in
text or Portable Document Format
(PDF). To use PDF, you must have
Adobe Acrobat Reader, which is
available free at the site.
You may also access documents of the
Department published in the Federal
Register by using the article search
feature at www.federalregister.gov.
Specifically, through the advanced
search feature at this site, you can limit
your search to documents published by
the Department.
2023 regarding the scheduled Public
Meeting focusing on list maintenance.
The notice contained an incorrect
address.
FOR FURTHER INFORMATION CONTACT:
Kristen Muthig, Telephone: (202) 897–
9285, Email: kmuthig@eac.gov.
SUPPLEMENTARY INFORMATON:
James F. Lane,
Senior Advisor to the Secretary, Delegated
the Duties of the Assistant Secretary Office
of Elementary and Secondary Education.
[FR Doc. 2023–05267 Filed 3–10–23; 11:15 am]
[FR Doc. 2023–05118 Filed 3–13–23; 8:45 am]
DEPARTMENT OF ENERGY
Correction
In the Federal Register of February
28, 2023 in FR Doc. 2023–04198, on
page 12669 in the second column,
correct the ADDRESSES caption to read:
ADDRESSES: Virtual via Zoom.
The roundtable discussion is open to
the public and will be livestreamed on
the U.S. Election Assistance
Commission YouTube Channel: https://
www.youtube.com/channel/
UCpN6i0g2rlF4ITWhwvBwwZw.
Amanda Joiner,
Acting General Counsel, U.S. Election
Assistance Commission.
BILLING CODE P
BILLING CODE 4000–01–P
Federal Energy Regulatory
Commission
ELECTION ASSISTANCE COMMISSION
Sunshine Act Meetings
U.S. Election Assistance
Commission.
ACTION: Notice; correction.
SUMMARY: The U.S. Election Assistance
Commission published a document in
the Federal Register on February 28,
AGENCY:
to construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA). The
proposed Funks Energy Recovery
Project would have an installed capacity
of 34,500 kilowatts (kW), and would be
located along a pipeline within the
water supply system near Maxwell,
Colusa County, California.
Applicant Contact: Jerry Brown,
Executive Director, Sites Project
Authority, PO Box 517, Maxwell, CA
95955, 925–260–7417, jbrown@
sitesproject.org.
FERC Contact: Christopher Chaney,
202–502–6778, christopher.chaney@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The project would
consist of: (1) two turbine generator
buildings, one housing a 20,000-kW unit
and the other housing a 14,500-kW unit,
(2) intake and discharge pipes, and (3)
appurtenant facilities. The proposed
project would have an estimated annual
generation of approximately 37,000
megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all the criteria shown in
the table below.
[Docket No. CD23–5–000]
Sites Project Authority; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On February 22, 2023, the Sites
Project Authority, filed a notice of intent
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A) ........................................
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 40 megawatts ................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i) .....................................
ddrumheller on DSK120RN23PROD with NOTICES1
FPA 30(a)(3)(C)(ii) ....................................
FPA 30(a)(3)(C)(iii) ...................................
Preliminary Determination: The
proposed Funks Energy Recovery
Project will not alter the primary
purpose of the conduit, which is for
irrigation, municipal water supply, and
other uses. Therefore, based upon the
above criteria, Commission staff
preliminarily determines that the
VerDate Sep<11>2014
21:09 Mar 13, 2023
Jkt 259001
operation of the project described above
satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
Y
Y
Y
criteria is 30 days from the issuance
date of this notice. Deadline for filing
motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
E:\FR\FM\14MRN1.SGM
14MRN1
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 49 / Tuesday, March 14, 2023 / Notices
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may send a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 385.2010.
Locations of Notice of Intent: The
Commission provides all interested
persons an opportunity to view and/or
print the contents of this document via
the internet through the Commission’s
website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (i.e., CD23–5) in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
1 18
CFR 385.2001–2005 (2021).
VerDate Sep<11>2014
21:09 Mar 13, 2023
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
Copies of the notice of intent can be
obtained directly from the applicant.
For assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
Dated: March 8, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–05162 Filed 3–13–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6470–008]
Winooski Hydroelectric Company;
Notice of Waiver Period for Water
Quality Certification Application
On March 6, 2023, Winooski
Hydroelectric Company submitted to
the Federal Energy Regulatory
Commission (Commission) evidence of
the date on which the certifying agency
received the certification request for a
Clean Water Act section 401(a)(1) water
quality certification filed with the
Vermont Department of Environmental
Conservation, in conjunction with the
above-captioned project. Pursuant to 40
CFR 121.6 and section [4.34(b)(5),
5.23(b), 153.4, or 157.22] of the
Commission’s regulations,1 we hereby
notify the Vermont Department of
Environmental Conservation of the
following:
Date of Receipt of the Certification
Request: March 6, 2023.
Reasonable Period of Time To Act on
the Certification Request: One year
(March 6, 2024).
If the Vermont Department of
Environmental Conservation fails or
refuses to act on the water quality
certification request on or before the
above date, then the agency certifying
authority is deemed waived pursuant to
section 401(a)(1) of the Clean Water Act,
33 U.S.C. 1341(a)(1).
Dated: March 8, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–05163 Filed 3–13–23; 8:45 am]
BILLING CODE 6717–01–P
1
Jkt 259001
PO 00000
18 CFR [4.34(b)(5)/5.23(b)/153.4/157.22].
Frm 00069
Fmt 4703
Sfmt 4703
15707
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC23–60–000.
Applicants: NTUA Generation-Utah,
LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of NTUA GenerationUtah, LLC.
Filed Date: 3/7/23.
Accession Number: 20230307–5183.
Comment Date: 5 p.m. ET 3/28/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER23–68–004.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Amendment to ISA, SA No. 1949;
Queue No. NQ16 (amend) to be effective
12/12/2022.
Filed Date: 3/8/23.
Accession Number: 20230308–5007.
Comment Date: 5 p.m. ET 3/29/23.
Docket Numbers: ER23–651–001.
Applicants: Southwest Power Pool,
Inc
Description: Tariff Amendment: 4010
Plum Nellie Wind Farm & ITCGP FSADeficiency Response to be effective 2/
14/2023.
Filed Date: 3/8/23.
Accession Number: 20230308–5034.
Comment Date: 5 p.m. ET 3/29/23.
Docket Numbers: ER23–672–001.
Applicants: Southwest Power Pool,
Inc
Description: Tariff Amendment:
4039SO Ponderosa Wind II & SPS FSADeficiency Response to be effective 5/8/
2023.
Filed Date: 3/8/23.
Accession Number: 20230308–5002.
Comment Date: 5 p.m. ET 3/29/23.
Docket Numbers: ER23–1261–000.
Applicants: Dynegy Marketing and
Trade, LLC.
Description: Dynegy Marketing and
Trade, LLC Request Additional Cost
Recovery Pursuant to Section III.A.15 of
Appendix A to Market Rule 1 of the ISO
New England Tariff.
Filed Date: 3/6/23.
Accession Number: 20230306–5206.
Comment Date: 5 p.m. ET 3/27/23.
Docket Numbers: ER23–1262–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
E:\FR\FM\14MRN1.SGM
14MRN1
Agencies
[Federal Register Volume 88, Number 49 (Tuesday, March 14, 2023)]
[Notices]
[Pages 15706-15707]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-05162]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD23-5-000]
Sites Project Authority; Notice of Preliminary Determination of a
Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On February 22, 2023, the Sites Project Authority, filed a notice
of intent to construct a qualifying conduit hydropower facility,
pursuant to section 30 of the Federal Power Act (FPA). The proposed
Funks Energy Recovery Project would have an installed capacity of
34,500 kilowatts (kW), and would be located along a pipeline within the
water supply system near Maxwell, Colusa County, California.
Applicant Contact: Jerry Brown, Executive Director, Sites Project
Authority, PO Box 517, Maxwell, CA 95955, 925-260-7417,
[email protected].
FERC Contact: Christopher Chaney, 202-502-6778,
[email protected].
Qualifying Conduit Hydropower Facility Description: The project
would consist of: (1) two turbine generator buildings, one housing a
20,000-kW unit and the other housing a 14,500-kW unit, (2) intake and
discharge pipes, and (3) appurtenant facilities. The proposed project
would have an estimated annual generation of approximately 37,000
megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Statutory provision Description Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A)................ The conduit the Y
facility uses is a
tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial
consumption and not
primarily for the
generation of
electricity.
FPA 30(a)(3)(C)(i)............. The facility is Y
constructed,
operated, or
maintained for the
generation of
electric power and
uses for such
generation only the
hydroelectric
potential of a non-
federally owned
conduit.
FPA 30(a)(3)(C)(ii)............ The facility has an Y
installed capacity
that does not exceed
40 megawatts.
FPA 30(a)(3)(C)(iii)........... On or before August 9, Y
2013, the facility is
not licensed, or
exempted from the
licensing
requirements of Part
I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: The proposed Funks Energy Recovery
Project will not alter the primary purpose of the conduit, which is for
irrigation, municipal water supply, and other uses. Therefore, based
upon the above criteria, Commission staff preliminarily determines that
the operation of the project described above satisfies the requirements
for a qualifying conduit hydropower facility, which is not required to
be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 30
days from the issuance date of this notice. Deadline for filing motions
to intervene is 30 days from the issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and
[[Page 15707]]
385.214. Any motions to intervene must be received on or before the
specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2021).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, you may send a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, MD 20852. A copy of all other filings in reference
to this application must be accompanied by proof of service on all
persons listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 385.2010.
Locations of Notice of Intent: The Commission provides all
interested persons an opportunity to view and/or print the contents of
this document via the internet through the Commission's website at
https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number
(i.e., CD23-5) in the docket number field to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. Copies of the notice of
intent can be obtained directly from the applicant. For assistance,
call toll-free 1-866-208-3676 or email [email protected]. For
TTY, call (202) 502-8659.
Dated: March 8, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-05162 Filed 3-13-23; 8:45 am]
BILLING CODE 6717-01-P