ANR Pipeline Company; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 15012-15014 [2023-04994]
Download as PDF
15012
Federal Register / Vol. 88, No. 47 / Friday, March 10, 2023 / Notices
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: March 6, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–04996 Filed 3–9–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–34–000]
lotter on DSK11XQN23PROD with NOTICES1
Southern Natural Gas Company, LLC;
Notice of Request for Extension of
Time
Take notice that on February 28, 2023,
Southern Natural Gas Company, L.L.C
(SNG) requested that the Federal Energy
Regulatory Commission (Commission)
grant an extension of time, until April
4, 2023, to complete its North System
2022 Project. SNG received a prior
notice authorization for the North
System 2022 Project on March 5, 2022
which authorized: (1) the construction
of approximately 2.2 miles of 8-inchdiameter pipeline (Cordova Connector
Line) in Walker County, Alabama; (2)
the modification of existing facilities
along the SNG system in Walker,
Morgan, Calhoun, Jefferson, and
Tuscaloosa counties, Alabama; and (3)
the re-wheeling the existing Compressor
Unit #1 at SNG’s Providence
Compressor Station in Tuscaloosa
County, Alabama. The commission’s
prior notice regulations require SNG to
complete the construction of the North
System 2022 Project and make it
available for service within one year
from issuance, or by March 4, 2023.1
In SNG’s request for an extension of
time, SNG stated that as the
construction of the Project was nearing
completion, SNG determined that for
operational safety a Remote Terminal
Unit needed to be relocated to provide
a 25-foot hazardous area radius with
additional equipment at its Cordova
Start site. Due to this scope addition and
rainy condition SNG requests an
extension of time in which to complete
the Project from the one-year date of
March 4, 2023, to the new projected
completion date of April 4, 2023.
This notice establishes a 15-calendar
day intervention and comment period
deadline. Any person wishing to
comment on SNG’s request for an
1 18
CFR 157.207(c).
VerDate Sep<11>2014
17:45 Mar 09, 2023
Jkt 259001
extension of time may do so. No reply
comments or answers will be
considered. If you wish to obtain legal
status by becoming a party to the
proceedings for this request, you
should, on or before the comment date
stated below, file a motion to intervene
in accordance with the requirements of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).2
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
those extension requests that are
contested,3 the Commission will aim to
issue an order acting on the request
within 45 days.4 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.5 The Commission will not
consider arguments that re-litigate the
issuance of the Certificate Order,
including whether the Commission
properly found the project to be in the
public convenience and necessity and
whether the Commission’s
environmental analysis for the
certificate complied with the National
Environmental Policy Act.6 At the time
a pipeline requests an extension of time,
orders on certificates of public
convenience and necessity are final and
the Commission will not re-litigate their
issuance.7 The OEP Director, or his or
her designee, will act on those extension
requests that are uncontested.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
2 Only motions to intervene from entities that
were party to the underlying proceeding will be
accepted. Algonquin Gas Transmission, LLC, 170
FERC ¶ 61,144, at P 39 (2020).
3 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2020).
4 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
5 Id. P 40.
6 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
7 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning COVID–19,
issued by the President on March 13,
2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original copy of the
protest or intervention by U.S. mail to
Kimberly D. Bose, Secretary Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Submissions by any other courier in
docketed proceedings should be
delivered to, Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern
Time on March 21, 2023.
Dated: March 6, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–04998 Filed 3–9–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–76–000]
ANR Pipeline Company; Notice of
Request Under Blanket Authorization
and Establishing Intervention and
Protest Deadline
Take notice that on February 22, 2023,
ANR Pipeline Company (ANR), 700
Louisiana Street, Suite 1300, Houston,
Texas 77002–2700, filed in the abovereferenced docket, a prior notice request
pursuant to sections 157.205 and
157.216(b) of the Federal Energy
Regulatory Commission’s (Commission)
regulations under the Natural Gas Act
(NGA), and ANR’s blanket certificate
issued in Docket No. CP82–480–000,1
for authorization to abandon one
injection/withdrawal well and
appurtenant facilities located at the
Goodwell Storage Field in Newaygo
County, Michigan, all as more fully set
forth in the application which is on file
with the Commission and open for
public inspection.
1 See Michigan Wisconsin Pipe Line Company, 20
FERC ¶ 62,595 (1982).
E:\FR\FM\10MRN1.SGM
10MRN1
Federal Register / Vol. 88, No. 47 / Friday, March 10, 2023 / Notices
lotter on DSK11XQN23PROD with NOTICES1
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TTY, (202)
502–8659.
Any questions concerning this
application should be directed to David
A. Alonzo, Manager, Project
Authorizations, ANR Pipeline
Company, 700 Louisiana Street, Suite
1300, Houston, Texas 77002–2700, at
(832) 320–5477 or david_alonzo@
tcenergy.com.
Pursuant to Section 157.9 of the
Commission’s Rules of Practice and
Procedure,2 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
2 18
CFR (Code of Federal Regulations) § 157.9.
VerDate Sep<11>2014
17:45 Mar 09, 2023
Jkt 259001
intervene, and comments is 5:00 p.m.
Eastern Time on May 05, 2023. How to
file protests, motions to intervene, and
comments is explained below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,3 any person 4 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,5 and must be submitted by
the protest deadline, which is May 05,
2023. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 6 and the regulations under
the NGA 7 by the intervention deadline
for the project, which is May 05, 2023.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
3 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
4 18 cfr 157.205(e).
6 18 CFR 385.214.
7 18 CFR 157.10.
4 Persons
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
15013
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before May 05,
2023. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–76–000 in your submission:
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 8
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–76–
000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory
8 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
E:\FR\FM\10MRN1.SGM
10MRN1
15014
Federal Register / Vol. 88, No. 47 / Friday, March 10, 2023 / Notices
Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: David A. Alonzo,
Manager, Project Authorizations, ANR
Pipeline Company, 700 Louisiana
Street, Suite 1300, Houston, TX 77002–
2700 or david_alonzo@tcenergy.com.
Any subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: March 6, 2023.
Kimberly D. Bose,
Secretary.
lotter on DSK11XQN23PROD with NOTICES1
[FR Doc. 2023–04994 Filed 3–9–23; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:45 Mar 09, 2023
Jkt 259001
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2023–0147; FRL–10772–01–
OCSPP]
Metamitron; Receipt of Application for
Emergency Exemption, Solicitation of
Public Comment
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA has received specific
exemption requests from the Colorado
and Nebraska Departments of
Agriculture to use the pesticide
metamitron (CAS No. 41394–05–2) to
treat up to 35,000 acres of sugarbeets to
control the weed, Palmer amaranth. The
applicants propose the use of a new
chemical which has not been registered
by EPA. EPA is soliciting public
comment before making the decision
whether or not to grant the exemptions.
DATES: Comments must be received on
or before March 27, 2023.
ADDRESSES: Submit your comments,
identified by docket identification (ID)
number EPA–HQ–OPP–2023–0147,
through the Federal eRulemaking Portal
at https://www.regulations.gov. Follow
the online instructions for submitting
comments. Do not submit electronically
any information you consider to be
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute. Additional
instructions on commenting and visiting
the docket, along with more information
about dockets generally, is available at
https://www.epa.gov/dockets.
FOR FURTHER INFORMATION CONTACT:
Daniel Rosenblatt, Acting Director,
Registration Division (7505T), Office of
Pesticide Programs, Environmental
Protection Agency, 1200 Pennsylvania
Ave. NW, Washington, DC 20460–0001;
main telephone number: (202) 506–
2875; email address: RDFRNotices@
epa.gov.
SUMMARY:
SUPPLEMENTARY INFORMATION:
I. General Information
A. Does this action apply to me?
You may be potentially affected by
this action if you are an agricultural
producer, food manufacturer, or
pesticide manufacturer. The following
list of North American Industrial
Classification System (NAICS) codes is
not intended to be exhaustive, but rather
provides a guide to help readers
determine whether this document
applies to them. Potentially affected
entities may include:
• Crop production (NAICS code 111).
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
• Animal production (NAICS code
112).
• Food manufacturing (NAICS code
311).
• Pesticide manufacturing (NAICS
code 32532).
B. What should I consider as I prepare
my comments for EPA?
1. Submitting CBI. Do not submit this
information to EPA through https://
www.regulations.gov or email. Clearly
mark the part or all of the information
that you claim to be CBI. For CBI
information in a disk or CD–ROM that
you mail to EPA, mark the outside of the
disk or CD–ROM as CBI and then
identify electronically within the disk or
CD–ROM the specific information that
is claimed as CBI. In addition to one
complete version of the comment that
includes information claimed as CBI, a
copy of the comment that does not
contain the information claimed as CBI
must be submitted for inclusion in the
public docket. Information so marked
will not be disclosed except in
accordance with procedures set forth in
40 CFR part 2.
2. Tips for preparing your comments.
When preparing and submitting your
comments, see the commenting tips at
https://www.epa.gov/dockets/
commenting-epa-dockets.
3. Environmental justice. EPA seeks to
achieve environmental justice, the fair
treatment and meaningful involvement
of any group, including minority and/or
low-income populations, in the
development, implementation, and
enforcement of environmental laws,
regulations, and policies. To help
address potential environmental justice
issues, the Agency seeks information on
any groups or segments of the
population who, as a result of their
location, cultural practices, or other
factors, may have atypical or
disproportionately high and adverse
human health impacts or environmental
effects from exposure to the pesticide
discussed in this document, compared
to the general population.
II. What action is the Agency taking?
Under section 18 of the Federal
Insecticide, Fungicide, and Rodenticide
Act (FIFRA) (7 U.S.C. 136p), at the
discretion of the EPA Administrator, a
Federal or State agency may be
exempted from any provision of FIFRA
if the EPA Administrator determines
that emergency conditions exist which
require the exemption. The Colorado
and Nebraska Departments of
Agriculture have requested the EPA
Administrator to issue specific
exemptions for the use of metamitron on
sugarbeets to control Palmer amaranth.
E:\FR\FM\10MRN1.SGM
10MRN1
Agencies
[Federal Register Volume 88, Number 47 (Friday, March 10, 2023)]
[Notices]
[Pages 15012-15014]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-04994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-76-000]
ANR Pipeline Company; Notice of Request Under Blanket
Authorization and Establishing Intervention and Protest Deadline
Take notice that on February 22, 2023, ANR Pipeline Company (ANR),
700 Louisiana Street, Suite 1300, Houston, Texas 77002-2700, filed in
the above-referenced docket, a prior notice request pursuant to
sections 157.205 and 157.216(b) of the Federal Energy Regulatory
Commission's (Commission) regulations under the Natural Gas Act (NGA),
and ANR's blanket certificate issued in Docket No. CP82-480-000,\1\ for
authorization to abandon one injection/withdrawal well and appurtenant
facilities located at the Goodwell Storage Field in Newaygo County,
Michigan, all as more fully set forth in the application which is on
file with the Commission and open for public inspection.
---------------------------------------------------------------------------
\1\ See Michigan Wisconsin Pipe Line Company, 20 FERC
62,595 (1982).
---------------------------------------------------------------------------
[[Page 15013]]
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov) using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TTY,
(202) 502-8659.
Any questions concerning this application should be directed to
David A. Alonzo, Manager, Project Authorizations, ANR Pipeline Company,
700 Louisiana Street, Suite 1300, Houston, Texas 77002-2700, at (832)
320-5477 or [email protected].
Pursuant to Section 157.9 of the Commission's Rules of Practice and
Procedure,\2\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\2\ 18 CFR (Code of Federal Regulations) Sec. 157.9.
---------------------------------------------------------------------------
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on May 05, 2023. How
to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\3\ any person \4\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205.
\4\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\5\ and must be submitted by
the protest deadline, which is May 05, 2023. A protest may also serve
as a motion to intervene so long as the protestor states it also seeks
to be an intervenor.
---------------------------------------------------------------------------
\4\ 18 cfr 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \6\ and the regulations under the NGA \7\ by the
intervention deadline for the project, which is May 05, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\6\ 18 CFR 385.214.
\7\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before May 05, 2023. The filing of a comment alone will not serve
to make the filer a party to the proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP23-76-000 in your submission:
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \8\
---------------------------------------------------------------------------
\8\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
number CP23-76-000.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
[[Page 15014]]
Commission, 888 First Street NE, Washington, DC 20426
To mail via any other courier, use the following address: Kimberly D.
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected]
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at: David A.
Alonzo, Manager, Project Authorizations, ANR Pipeline Company, 700
Louisiana Street, Suite 1300, Houston, TX 77002-2700 or
[email protected]. Any subsequent submissions by an intervenor
must be served on the applicant and all other parties to the
proceeding. Contact information for parties can be downloaded from the
service list at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: March 6, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-04994 Filed 3-9-23; 8:45 am]
BILLING CODE 6717-01-P