Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; Northern States Power Company-Minnesota; Monticello Nuclear Generating Plant, Unit 1, 15103-15105 [2023-04963]
Download as PDF
15103
Federal Register / Vol. 88, No. 47 / Friday, March 10, 2023 / Notices
BURDEN ESTIMATE FOR THE FY 2023 AND FY 2025 SURVEYS—Continued
Year
Average
response time
hours
Total burden
(hours)
2025 .............................................................................................................................................
600
19
11,400
Total Burden .........................................................................................................................
1,200
........................
22,800
Dated: March 6, 2023.
Suzanne H. Plimpton,
Reports Clearance Officer, National Science
Foundation.
[FR Doc. 2023–04881 Filed 3–9–23; 8:45 am]
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
Sunshine Act Meetings
Weeks of March 13, 20,
27, April 3, 10, 17, 2023. The schedule
for Commission meetings is subject to
change on short notice. The NRC
Commission Meeting Schedule can be
found on the internet at: https://
www.nrc.gov/public-involve/publicmeetings/schedule.html.
PLACE: The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.,
braille, large print), please notify Anne
Silk, NRC Disability Program Specialist,
at 301–287–0745, by videophone at
240–428–3217, or by email at
Anne.Silk@nrc.gov. Determinations on
requests for reasonable accommodation
will be made on a case-by-case basis.
STATUS: Public and closed.
Members of the public may request to
receive the information in these notices
electronically. If you would like to be
added to the distribution, please contact
the Nuclear Regulatory Commission,
Office of the Secretary, Washington, DC
20555, at 301–415–1969, or by email at
Wendy.Moore@nrc.gov or Tyesha.Bush@
nrc.gov.
MATTERS TO BE CONSIDERED:
TIME AND DATE:
Week of March 13, 2023
Friday, March 17, 2023
10 a.m. Affirmation Session (Public
Meeting) (Tentative). Susquehanna
Nuclear, LLC (Susquehanna Steam
Electric Station, Units 1 and 2)—
Ruling on Eric Epstein’s Petition to
Intervene and Request for Hearing
VerDate Sep<11>2014
17:45 Mar 09, 2023
(Tentative). (Contact: Wesley Held:
301–287–3591)
Additional Information: The public is
invited to attend the Commission’s
meeting live; via teleconference. Details
for joining the teleconference in listen
only mode can be found at https://
www.nrc.gov/pmns/mtg.
There are no meetings scheduled for
the week of March 13, 2023.
Week of March 20, 2023—Tentative
There are no meetings scheduled for
the week of March 20, 2023.
[NRC–2023–0001]
lotter on DSK11XQN23PROD with NOTICES1
Respondents
Jkt 259001
Week of March 27, 2023—Tentative
Tuesday, March 28, 2023
10 a.m. Briefing on the Annual Threat
Environment (Closed Ex. 1)
Thursday, March 30, 2023
9 a.m. Briefing on Nuclear Regulatory
Research Program (Public Meeting).
(Contact: Nicholas Difrancesco:
301–415–1115)
Additional Information: The meeting
will be held in the Commissioners’
Conference Room, 11555 Rockville Pike,
Rockville, Maryland. The public is
invited to attend the Commission’s
meeting in person or watch live via
webcast at the Web address—https://
video.nrc.gov/.
Week of April 3, 2023—Tentative
There are no meetings scheduled for
the week of April 3, 2023.
Week of April 10, 2023—Tentative
There are no meetings scheduled for
the week of April 10, 2023.
Week of April 17, 2023—Tentative
Thursday, April 20, 2023
9 a.m. Strategic Programmatic
Overview of the Fuel Facilities and
the Spent Fuel Storage and
Transportation Business Lines
(Public Meeting). (Contact: Kellee
Jamerson: 301–415–7408)
Additional Information: The meeting
will be held in the Commissioners’
Conference Room, 11555 Rockville Pike,
Rockville, Maryland. The public is
invited to attend the Commission’s
meeting in person or watch live via
webcast at the Web address—https://
video.nrc.gov/.
PO 00000
Frm 00134
Fmt 4703
Sfmt 4703
CONTACT PERSON FOR MORE INFORMATION:
For more information or to verify the
status of meetings, contact Wesley Held
at 301–287–3591 or via email at
Wesley.Held@nrc.gov.
The NRC is holding the meetings
under the authority of the Government
in the Sunshine Act, 5 U.S.C. 552b.
Dated: March 8, 2023.
For the Nuclear Regulatory Commission.
Wesley W. Held,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2023–05104 Filed 3–8–23; 4:15 pm]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–263; NRC–2023–0031]
Notice of Intent To Conduct Scoping
Process and Prepare Environmental
Impact Statement; Northern States
Power Company—Minnesota;
Monticello Nuclear Generating Plant,
Unit 1
Nuclear Regulatory
Commission.
ACTION: Intent to conduct scoping
process and prepare environmental
impact statement; public scoping
meeting and request for comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) will conduct a
scoping process to gather information
necessary to prepare an environmental
impact statement (EIS) to evaluate the
environmental impacts for the
subsequent license renewal (SLR) of the
Renewed Facility Operating License No.
DPR–22 for Monticello Nuclear
Generating Plant, Unit 1 (Monticello).
The NRC is seeking public comment on
this action and has scheduled a public
scoping meeting that will take place in
person in Monticello, Minnesota on
March 22, 2023, followed by a public
scoping webinar meeting at a later date.
DATES: The NRC will hold an in-person
public scoping meeting on March 22,
2023, from 6 to 8 p.m. local time. A
public scoping webinar will be held at
a later date following the in-person
public scoping meeting. Submit
comments on the scope of the EIS by
April 10, 2023. Comments received after
SUMMARY:
E:\FR\FM\10MRN1.SGM
10MRN1
15104
Federal Register / Vol. 88, No. 47 / Friday, March 10, 2023 / Notices
this date will be considered if it is
practical to do so, but the NRC is able
to ensure consideration only for
comments received on or before this
date. See section IV, ‘‘Public Scoping
Meeting,’’ of this notice for additional
information.
You may submit comments
by any of the following methods;
however, the NRC encourages electronic
comment submission through the
Federal rulemaking website:
• Federal rulemaking website: Go to
https://regulations.gov and search for
Docket ID NRC–2023–0031. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• Email comments to:
MonticelloEnvironmental@nrc.gov.
• Mail comments to: Office of
Administration, Mail Stop: TWFN–7–
A60M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, ATTN: Program Management,
Announcements and Editing Staff.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Jessica Umana, Office of Nuclear
Material Safety and Safeguards, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–5207, email: Jessica.Umana@
nrc.gov.
ADDRESSES:
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and
Submitting Comments
lotter on DSK11XQN23PROD with NOTICES1
A. Obtaining Information
Please refer to Docket ID NRC–2023–
0031 when contacting the NRC about
the availability of information for this
action. You may obtain publicly
available information related to this
action by any of the following methods:
• Federal Rulemaking website: Go to
https://regulations.gov and search for
Docket ID NRC–2023–0031.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
VerDate Sep<11>2014
17:45 Mar 09, 2023
Jkt 259001
reference staff at 1–800–397–4209, 301–
415–4737, or by email to
PDR.Resource@nrc.gov. The ADAMS
accession number for each document
referenced in this document (if it is
available in ADAMS) is provided the
first time that it is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents,
by appointment, at the NRC’s PDR,
Room P1 B35, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852. To make an
appointment to visit the PDR, please
send an email to PDR.Resource@nrc.gov
or call 1–800–397–4209 or 301–415–
4737, between 8 a.m. and 4 p.m. eastern
time (ET), Monday through Friday,
except Federal holidays.
• Public Library: A copy of the SLR
application for the Monticello,
including the environmental report
(ER), is available for public review at the
following public library location:
Monticello Great River Regional Library,
200 W 6th St., Monticello, MN 55362.
B. Submitting Comments
The NRC encourages electronic
comment submission through the
Federal rulemaking website (https://
www.regulations.gov). Please include
Docket ID NRC–2023–0031 in the
subject line of your comment
submission in order to ensure that the
NRC is able to make your comment
submission available to the public in
this docket.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment into ADAMS.
II. Discussion
By letter dated January 9, 2023
(ADAMS Accession No. ML23009A353),
Northern States Power Company, a
Minnesota corporation, submitted to the
NRC an application for subsequent
PO 00000
Frm 00135
Fmt 4703
Sfmt 4703
license renewal of Renewed Facility
Operating License No. DPR–22, Unit 1,
for an additional 20 years of operation.
This submission initiated the NRC’s
proposed action of determining whether
to grant the SLR application. The
Monticello unit is a boiling water
reactor designed by General Electric and
is located in central Minnesota on the
banks of the Mississippi River in
Sherburne and Wright counties,
approximately 38 miles northwest of
Minneapolis, MN. The current renewed
facility operating license for Unit 1
expires at midnight on September 8,
2030. The SLR application was
submitted pursuant to part 54 of title 10
of the Code of Federal Regulations (10
CFR), ‘‘Requirements for Renewal of
Operating Licenses for Nuclear Power
Plants,’’ and seeks to extend the
renewed facility operating license for
Unit 1 to midnight on September 8,
2050. A notice of receipt and
availability of the application was
published in the Federal Register on
January 31, 2023 (88 FR 6327).
III. Request for Comment
This notice informs the public of the
NRC’s intention to conduct
environmental scoping and prepare an
EIS related to the SLR application for
Monticello, and to provide the public an
opportunity to participate in the
environmental scoping process, as
defined in 10 CFR 51.29, ‘‘Scopingenvironmental impact statement and
supplement to environmental impact
statement.’’
The regulations in 36 CFR 800.8,
‘‘Coordination with the National
Environmental Policy Act,’’ allow
agencies to use their National
Environmental Policy Act of 1969 (42
U.S.C. 4321, et seq.) (NEPA) process to
fulfill the requirements of Section 106 of
the National Historic Preservation Act of
1966 (54 U.S.C. 300101, et seq.) (NHPA).
Therefore, pursuant to 36 CFR
800.8(c), the NRC intends to use its
process and documentation required for
the preparation of the EIS on the
proposed action to comply with Section
106 of the NHPA in lieu of the
procedures set forth at 36 CFR 800.3
through 800.6.
In accordance with 10 CFR 51.53(c)
and 10 CFR 54.23, Monticello submitted
an ER as part of the SLR application.
The ER was prepared pursuant to 10
CFR part 51, ‘‘Environmental Protection
Regulations for Domestic Licensing and
Related Regulatory Functions,’’ and is
available in ADAMS under Accession
No. ML23009A356. The ER will also be
available for viewing at https://
www.nrc.gov/reactors/operating/
licensing/renewal/subsequent-license-
E:\FR\FM\10MRN1.SGM
10MRN1
Federal Register / Vol. 88, No. 47 / Friday, March 10, 2023 / Notices
lotter on DSK11XQN23PROD with NOTICES1
renewal.html. In addition, the SLR
application, including the ER, is
available for public review at the
Monticello Great River Regional Library,
200 W 6th St, Monticello, MN 55362.
The NRC intends to gather the
information necessary to prepare a
plant-specific supplement to NUREG–
1437, ‘‘Generic Environmental Impact
Statement for License Renewal of
Nuclear Plants’’ (ADAMS Package
Accession No. ML13107A023) (GEIS),
related to the SLR application for
Monticello. The NRC is required by 10
CFR 51.95 to prepare a plant-specific
supplement to the GEIS in connection
with the renewal of an operating
license. This notice is being published
in accordance with NEPA and the NRC’s
regulations at 10 CFR part 51.
The supplement to the GEIS will
evaluate the environmental impacts of
subsequent license renewal for
Monticello and reasonable alternatives
thereto. Possible alternatives to the
proposed action include the no action
alternative and reasonable alternative
energy sources.
As part of its environmental review,
the NRC will first conduct a scoping
process for the plant-specific
supplement to the GEIS and, as soon as
practicable thereafter, will prepare a
draft supplement to the GEIS for public
comment. Participation in this scoping
process by members of the public and
local, State, Tribal, and Federal
government agencies is encouraged. The
scoping process for the supplement to
the GEIS will be used to accomplish the
following:
a. Define the proposed action that is
to be the subject of the supplement to
the GEIS;
b. Determine the scope of the
supplement to the GEIS and identify the
significant issues to be analyzed in
depth;
c. Identify and eliminate from
detailed study those issues that are
peripheral or are not significant or that
have been covered by prior
environmental review;
d. Identify any environmental
assessments and other ElSs that are
being or will be prepared that are
related to, but are not part of, the scope
of the supplement to the GEIS under
consideration;
e. Identify other environmental
review and consultation requirements
related to the proposed action;
f. Indicate the relationship between
the timing of the preparation of the
environmental analyses and the NRC’s
tentative planning and decision-making
schedule;
g. Identify any cooperating agencies
and, as appropriate, allocate
assignments for preparation and
schedules for completing the
supplement to the GEIS to the NRC and
any cooperating agencies; and
h. Describe how the supplement to
the GEIS will be prepared, including
any contractor assistance to be used.
The NRC invites the following entities
to participate in scoping:
a. The applicant, Northern States
Power Company;
Meeting
Date
Public EIS Scoping ..............
Wednesday, 03/22/2023 ...
Persons interested in attending this
meeting should monitor the NRC’s
Public Meeting Schedule website at
https://www.nrc.gov/pmns/mtg for
additional information and the agenda
for the meeting. Please contact Ms.
Jessica Umana no later than March 16,
2023, if accommodations or special
equipment is needed to attend or to
provide comments, so that the NRC staff
can determine whether the request can
be accommodated.
The public scoping meeting will
include: (1) an overview by the NRC
staff of the environmental and safety
review processes, the proposed scope of
the supplement to the GEIS, and the
proposed review schedule; and (2) the
opportunity for interested government
agencies, organizations, and individuals
to submit comments or suggestions on
VerDate Sep<11>2014
17:45 Mar 09, 2023
Jkt 259001
b. Any Federal agency that has
jurisdiction by law or special expertise
with respect to any environmental
impact involved or that is authorized to
develop and enforce relevant
environmental standards;
c. Affected State and local
government agencies, including those
authorized to develop and enforce
relevant environmental standards;
d. Any affected Indian Tribe;
e. Any person who requests or has
requested an opportunity to participate
in the scoping process; and
f. Any person who has petitioned or
intends to petition for leave to intervene
under 10 CFR 2.309.
IV. Public Scoping Meeting
In accordance with 10 CFR 51.26(b),
the scoping process for an EIS may
include a public scoping meeting to
help identify significant issues related
to the proposed action and to determine
the scope of issues to be addressed in
the EIS.
The NRC is announcing that it will
hold an in-person public scoping
meeting for the Monticello SLR
supplement to the GEIS; a virtual public
scoping meeting is to follow at a later
date. A court reporter will transcribe all
comments received during the public
scoping meeting. To be considered,
comments must be provided either at a
transcribed public meeting or in writing,
as discussed in the ADDRESSES section of
this notice. The in-person public
scoping meeting information is as
follows.
Time
Location
6 p.m.–8 p.m., as necessary.
Monticello Community Center, 505 Walnut St., Monticello, MN 55362.
environmental issues or the proposed
scope of the Monticello SLR supplement
to the GEIS.
Participation in the scoping process
for the Monticello SLR supplement to
the GEIS does not entitle participants to
become parties to the proceeding to
which the supplement to the GEIS
relates. Matters related to participation
in any hearing are outside the scope of
matters to be discussed at this public
meeting.
Dated: March 7, 2023.
For the Nuclear Regulatory Commission.
Theodore B. Smith,
Chief, Environmental Review License Renewal
Branch, Division of Rulemaking,
Environment, and Financial Support, Office
of Nuclear Material Safety and Safeguards.
[FR Doc. 2023–04963 Filed 3–9–23; 8:45 am]
BILLING CODE 7590–01–P
PO 00000
Frm 00136
Fmt 4703
Sfmt 4703
15105
OFFICE OF PERSONNEL
MANAGEMENT
Submission for Review:
Representative Payee Application/
Information Necessary for a
Competency Determination
Office of Personnel
Management.
AGENCY:
30-Day notice and request for
comments.
ACTION:
In accordance with the
Paperwork Reduction of 1995,
Retirement Services, Office of Personnel
Management (OPM) is offering the
general public and other federal
agencies the opportunity to comment on
a revised information collection request
(ICR), RI 20–7 [Representative Payee
SUMMARY:
E:\FR\FM\10MRN1.SGM
10MRN1
Agencies
[Federal Register Volume 88, Number 47 (Friday, March 10, 2023)]
[Notices]
[Pages 15103-15105]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-04963]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-263; NRC-2023-0031]
Notice of Intent To Conduct Scoping Process and Prepare
Environmental Impact Statement; Northern States Power Company--
Minnesota; Monticello Nuclear Generating Plant, Unit 1
AGENCY: Nuclear Regulatory Commission.
ACTION: Intent to conduct scoping process and prepare environmental
impact statement; public scoping meeting and request for comment.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) will conduct a
scoping process to gather information necessary to prepare an
environmental impact statement (EIS) to evaluate the environmental
impacts for the subsequent license renewal (SLR) of the Renewed
Facility Operating License No. DPR-22 for Monticello Nuclear Generating
Plant, Unit 1 (Monticello). The NRC is seeking public comment on this
action and has scheduled a public scoping meeting that will take place
in person in Monticello, Minnesota on March 22, 2023, followed by a
public scoping webinar meeting at a later date.
DATES: The NRC will hold an in-person public scoping meeting on March
22, 2023, from 6 to 8 p.m. local time. A public scoping webinar will be
held at a later date following the in-person public scoping meeting.
Submit comments on the scope of the EIS by April 10, 2023. Comments
received after
[[Page 15104]]
this date will be considered if it is practical to do so, but the NRC
is able to ensure consideration only for comments received on or before
this date. See section IV, ``Public Scoping Meeting,'' of this notice
for additional information.
ADDRESSES: You may submit comments by any of the following methods;
however, the NRC encourages electronic comment submission through the
Federal rulemaking website:
Federal rulemaking website: Go to https://regulations.gov
and search for Docket ID NRC-2023-0031. Address questions about Docket
IDs in Regulations.gov to Stacy Schumann; telephone: 301-415-0624;
email: [email protected]. For technical questions, contact the
individual listed in the For Further Information Contact section of
this document.
Email comments to: [email protected].
Mail comments to: Office of Administration, Mail Stop:
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Jessica Umana, Office of Nuclear
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001; telephone: 301-415-5207, email:
[email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2023-0031 when contacting the NRC
about the availability of information for this action. You may obtain
publicly available information related to this action by any of the
following methods:
Federal Rulemaking website: Go to https://regulations.gov
and search for Docket ID NRC-2023-0031.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced in this document (if it is available in ADAMS) is
provided the first time that it is referenced.
NRC's PDR: You may examine and purchase copies of public
documents, by appointment, at the NRC's PDR, Room P1 B35, One White
Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make
an appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Federal holidays.
Public Library: A copy of the SLR application for the
Monticello, including the environmental report (ER), is available for
public review at the following public library location: Monticello
Great River Regional Library, 200 W 6th St., Monticello, MN 55362.
B. Submitting Comments
The NRC encourages electronic comment submission through the
Federal rulemaking website (https://www.regulations.gov). Please
include Docket ID NRC-2023-0031 in the subject line of your comment
submission in order to ensure that the NRC is able to make your comment
submission available to the public in this docket.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at
https://www.regulations.gov as well as enter the comment submissions
into ADAMS. The NRC does not routinely edit comment submissions to
remove identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Discussion
By letter dated January 9, 2023 (ADAMS Accession No. ML23009A353),
Northern States Power Company, a Minnesota corporation, submitted to
the NRC an application for subsequent license renewal of Renewed
Facility Operating License No. DPR-22, Unit 1, for an additional 20
years of operation. This submission initiated the NRC's proposed action
of determining whether to grant the SLR application. The Monticello
unit is a boiling water reactor designed by General Electric and is
located in central Minnesota on the banks of the Mississippi River in
Sherburne and Wright counties, approximately 38 miles northwest of
Minneapolis, MN. The current renewed facility operating license for
Unit 1 expires at midnight on September 8, 2030. The SLR application
was submitted pursuant to part 54 of title 10 of the Code of Federal
Regulations (10 CFR), ``Requirements for Renewal of Operating Licenses
for Nuclear Power Plants,'' and seeks to extend the renewed facility
operating license for Unit 1 to midnight on September 8, 2050. A notice
of receipt and availability of the application was published in the
Federal Register on January 31, 2023 (88 FR 6327).
III. Request for Comment
This notice informs the public of the NRC's intention to conduct
environmental scoping and prepare an EIS related to the SLR application
for Monticello, and to provide the public an opportunity to participate
in the environmental scoping process, as defined in 10 CFR 51.29,
``Scoping-environmental impact statement and supplement to
environmental impact statement.''
The regulations in 36 CFR 800.8, ``Coordination with the National
Environmental Policy Act,'' allow agencies to use their National
Environmental Policy Act of 1969 (42 U.S.C. 4321, et seq.) (NEPA)
process to fulfill the requirements of Section 106 of the National
Historic Preservation Act of 1966 (54 U.S.C. 300101, et seq.) (NHPA).
Therefore, pursuant to 36 CFR 800.8(c), the NRC intends to use its
process and documentation required for the preparation of the EIS on
the proposed action to comply with Section 106 of the NHPA in lieu of
the procedures set forth at 36 CFR 800.3 through 800.6.
In accordance with 10 CFR 51.53(c) and 10 CFR 54.23, Monticello
submitted an ER as part of the SLR application. The ER was prepared
pursuant to 10 CFR part 51, ``Environmental Protection Regulations for
Domestic Licensing and Related Regulatory Functions,'' and is available
in ADAMS under Accession No. ML23009A356. The ER will also be available
for viewing at https://www.nrc.gov/reactors/operating/licensing/
renewal/subsequent-license-
[[Page 15105]]
renewal.html. In addition, the SLR application, including the ER, is
available for public review at the Monticello Great River Regional
Library, 200 W 6th St, Monticello, MN 55362.
The NRC intends to gather the information necessary to prepare a
plant-specific supplement to NUREG-1437, ``Generic Environmental Impact
Statement for License Renewal of Nuclear Plants'' (ADAMS Package
Accession No. ML13107A023) (GEIS), related to the SLR application for
Monticello. The NRC is required by 10 CFR 51.95 to prepare a plant-
specific supplement to the GEIS in connection with the renewal of an
operating license. This notice is being published in accordance with
NEPA and the NRC's regulations at 10 CFR part 51.
The supplement to the GEIS will evaluate the environmental impacts
of subsequent license renewal for Monticello and reasonable
alternatives thereto. Possible alternatives to the proposed action
include the no action alternative and reasonable alternative energy
sources.
As part of its environmental review, the NRC will first conduct a
scoping process for the plant-specific supplement to the GEIS and, as
soon as practicable thereafter, will prepare a draft supplement to the
GEIS for public comment. Participation in this scoping process by
members of the public and local, State, Tribal, and Federal government
agencies is encouraged. The scoping process for the supplement to the
GEIS will be used to accomplish the following:
a. Define the proposed action that is to be the subject of the
supplement to the GEIS;
b. Determine the scope of the supplement to the GEIS and identify
the significant issues to be analyzed in depth;
c. Identify and eliminate from detailed study those issues that are
peripheral or are not significant or that have been covered by prior
environmental review;
d. Identify any environmental assessments and other ElSs that are
being or will be prepared that are related to, but are not part of, the
scope of the supplement to the GEIS under consideration;
e. Identify other environmental review and consultation
requirements related to the proposed action;
f. Indicate the relationship between the timing of the preparation
of the environmental analyses and the NRC's tentative planning and
decision-making schedule;
g. Identify any cooperating agencies and, as appropriate, allocate
assignments for preparation and schedules for completing the supplement
to the GEIS to the NRC and any cooperating agencies; and
h. Describe how the supplement to the GEIS will be prepared,
including any contractor assistance to be used.
The NRC invites the following entities to participate in scoping:
a. The applicant, Northern States Power Company;
b. Any Federal agency that has jurisdiction by law or special
expertise with respect to any environmental impact involved or that is
authorized to develop and enforce relevant environmental standards;
c. Affected State and local government agencies, including those
authorized to develop and enforce relevant environmental standards;
d. Any affected Indian Tribe;
e. Any person who requests or has requested an opportunity to
participate in the scoping process; and
f. Any person who has petitioned or intends to petition for leave
to intervene under 10 CFR 2.309.
IV. Public Scoping Meeting
In accordance with 10 CFR 51.26(b), the scoping process for an EIS
may include a public scoping meeting to help identify significant
issues related to the proposed action and to determine the scope of
issues to be addressed in the EIS.
The NRC is announcing that it will hold an in-person public scoping
meeting for the Monticello SLR supplement to the GEIS; a virtual public
scoping meeting is to follow at a later date. A court reporter will
transcribe all comments received during the public scoping meeting. To
be considered, comments must be provided either at a transcribed public
meeting or in writing, as discussed in the ADDRESSES section of this
notice. The in-person public scoping meeting information is as follows.
----------------------------------------------------------------------------------------------------------------
Meeting Date Time Location
----------------------------------------------------------------------------------------------------------------
Public EIS Scoping................. Wednesday, 03/22/2023. 6 p.m.-8 p.m., as Monticello Community
necessary. Center, 505 Walnut St.,
Monticello, MN 55362.
----------------------------------------------------------------------------------------------------------------
Persons interested in attending this meeting should monitor the
NRC's Public Meeting Schedule website at https://www.nrc.gov/pmns/mtg
for additional information and the agenda for the meeting. Please
contact Ms. Jessica Umana no later than March 16, 2023, if
accommodations or special equipment is needed to attend or to provide
comments, so that the NRC staff can determine whether the request can
be accommodated.
The public scoping meeting will include: (1) an overview by the NRC
staff of the environmental and safety review processes, the proposed
scope of the supplement to the GEIS, and the proposed review schedule;
and (2) the opportunity for interested government agencies,
organizations, and individuals to submit comments or suggestions on
environmental issues or the proposed scope of the Monticello SLR
supplement to the GEIS.
Participation in the scoping process for the Monticello SLR
supplement to the GEIS does not entitle participants to become parties
to the proceeding to which the supplement to the GEIS relates. Matters
related to participation in any hearing are outside the scope of
matters to be discussed at this public meeting.
Dated: March 7, 2023.
For the Nuclear Regulatory Commission.
Theodore B. Smith,
Chief, Environmental Review License Renewal Branch, Division of
Rulemaking, Environment, and Financial Support, Office of Nuclear
Material Safety and Safeguards.
[FR Doc. 2023-04963 Filed 3-9-23; 8:45 am]