Duke Energy Carolinas, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 14361-14362 [2023-04676]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 88, No. 45 / Wednesday, March 8, 2023 / Notices
Applicants: Crossroads Pipeline
Company.
Description: § 4(d) Rate Filing: TRA
2023 to be effective 4/1/2023.
Filed Date: 3/1/23.
Accession Number: 20230301–5187.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–546–000.
Applicants: High Point Gas
Transmission, LLC.
Description: Compliance filing: High
Point Gas Annual LAUF Filing to be
effective N/A.
Filed Date: 3/1/23.
Accession Number: 20230301–5196.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–547–000.
Applicants: Transwestern Pipeline
Company, LLC.
Description: § 4(d) Rate Filing: Fuel
Filing 3–1–23 to be effective 4/1/2023.
Filed Date: 3/1/23.
Accession Number: 20230301–5212.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–548–000.
Applicants: Adelphia Gateway, LLC.
Description: Penalty Revenue
Crediting Report of Adelphia Gateway,
LLC.
Filed Date: 3/1/23.
Accession Number: 20230301–5219.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–549–000.
Applicants: Empire Pipeline, Inc.
Description: Compliance filing:
Refund Report Jan-Dec 2022 (Per
Settlement in RP18–940) to be effective
N/A.
Filed Date: 3/1/23.
Accession Number: 20230301–5254.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–550–000.
Applicants: UGI Mt. Bethel Pipeline
Company, LLC.
Description: Annual Retainage
Adjustment Mechanism Filing of UGI
Mt. Bethel Pipeline Company, LLC.
Filed Date: 3/1/23.
Accession Number: 20230301–5267.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–551–000.
Applicants: UGI Sunbury, LLC.
Description: Annual Retainage
Adjustment Filing of UGI Sunbury, LLC.
Filed Date: 3/1/23.
Accession Number: 20230301–5274.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–552–000.
Applicants: Adelphia Gateway, LLC.
Description: § 4(d) Rate Filing:
Adelphia Annual TUP & SBA filing
2023 to be effective 4/1/2023.
Filed Date: 3/1/23.
Accession Number: 20230301–5298.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–553–000.
Applicants: North Baja Pipeline, LLC.
VerDate Sep<11>2014
16:48 Mar 07, 2023
Jkt 259001
Description: § 4(d) Rate Filing:
Gazprom to SEFE Name Change—NR/
Non-Conf Amendment to be effective 3/
1/2023.
Filed Date: 3/2/23.
Accession Number: 20230302–5000.
Comment Date: 5 p.m. ET 3/14/23.
Docket Numbers: RP23–554–000.
Applicants: Talen Energy Marketing,
LLC, XTO Energy Inc.
Description: Joint Petition for
Temporary Waivers of Capacity Release
Regulations, et al. of Talen Energy
Marketing, LLC, et al.
Filed Date: 3/1/23.
Accession Number: 20230301–5317.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–555–000.
Applicants: Rover Pipeline LLC.
Description: § 4(d) Rate Filing:
Summary of Negotiated Rate Capacity
Release Agreements 3–2–23 to be
effective 3/1/2023.
Filed Date: 3/2/23.
Accession Number: 20230302–5032.
Comment Date: 5 p.m. ET 3/14/23.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 2, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–04748 Filed 3–7–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2232–855]
Duke Energy Carolinas, LLC; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
14361
with the Commission and is available
for public inspection.
a. Type of Application: Amendment
of license to construct stability berm at
the Mountain Island development.
b. Project No.: 2232–855.
c. Date Filed: December 22, 2022.
d. Applicant: Duke Energy Carolinas,
LLC.
e. Name of Project: Catawba-Wateree
Hydroelectric Project.
f. Location: The Mountain Island
development is located on the Catawba
River in Gaston, Lincoln, and
Mecklenburg counties, North Carolina.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Jeffrey G.
Lineberger, Director of Water Strategy
and Hydro Licensing, Duke Energy, Mail
Code EC–12Q, 526 South Church Street,
Charlotte, NC 28202, (704) 382–5942.
i. FERC Contact: Mr. Steven Sachs,
(202) 502–8666, Steven.Sachs@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file comments, motions to
intervene, and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. The first page of
any filing should include docket
number P–2232–855.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
E:\FR\FM\08MRN1.SGM
08MRN1
lotter on DSK11XQN23PROD with NOTICES1
14362
Federal Register / Vol. 88, No. 45 / Wednesday, March 8, 2023 / Notices
k. Description of Request: The
applicant requests an amendment of
license to construct a compacted
earthfill stability berm on the
downstream slope of the earthen
embankment dam at the south end of
the powerhouse at the Mountain Island
development. The berm would have
approximately the same crest elevation
and length as the existing earthen
embankment but would widen the dam
and extend the footprint of the dam
approximately 150 feet farther
downstream. The applicant would
obtain the material for the proposed
berm from a 17-acre onsite borrow area
to the southwest of the existing
embankment. The applicant also
proposes to close the upstream tailrace
fishing platform and associated parking
lot for the duration of the construction
activities and would reroute access to
the downstream fishing platform.
Construction would last approximately
3 years and is necessary to reduce the
risk of dam failure during a seismic
event.
l. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Motions to Intervene, or
Protests: Anyone may submit
comments, a motion to intervene, or a
protest in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
motions to intervene, or protests must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘MOTION TO
INTERVENE’’, or ‘‘PROTEST’’ as
applicable; (2) set forth in the heading
VerDate Sep<11>2014
16:48 Mar 07, 2023
Jkt 259001
the name of the applicant and the
project number(s) of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person intervening or
protesting; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis. A copy of all other filings in
reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: March 1, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–04676 Filed 3–7–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Staff Attendance at North
American Electric Reliability
Corporation Industry Webinar
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and/or
Commission staff may attend the
following meeting:
North American Electric Reliability
Corporation Project 2021–07 Extreme
Cold Weather Grid Operations,
Preparedness, and Coordination Virtual
Industry Webinar on:
March 14, 2023 (1:00 p.m.–2:30 p.m.
eastern time)
Further information regarding these
meetings may be found at: https://
www.nerc.com/Pages/Calendar.aspx.
The discussions at the meetings,
which are open to the public, may
address matters at issue in the following
Commission proceeding:
Docket No. RD23–1–000 Extreme Cold
Weather Reliability Standards EOP–
011–3 and EOP–012–1
For further information, please
contact Chanel Chasanov, 202–502–
8569, or chanel.chasanov@ferc.gov.
Dated: March 1, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–04677 Filed 3–7–23; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–10742–01–OW]
Clean Water Act; Contractor Access to
Confidential Business Information
Environmental Protection
Agency (EPA).
ACTION: Notice of intended transfer of
confidential business information to
contractor and its subcontractors.
AGENCY:
The Environmental Protection
Agency (EPA) intends to transfer
confidential business information (CBI)
collected from numerous industries
under a newly awarded contract,
effective November 1, 2022, to Eastern
Research Group (ERG) and its
subcontractors. Transfer of this
information is necessary for ERG to
assist the Office of Water in the
preparation of effluent guidelines and
standards and with its effluent
guidelines planning and review
activities. Much of the information
being transferred was or will be
collected under the authority of section
308 of the Clean Water Act (CWA).
Interested persons may submit
comments on this intended transfer of
information to the person listed in the
ADDRESSES section of this document.
DATES: Comments on the transfer of data
are due March 13, 2023.
ADDRESSES: Comments may be sent to
M. Ahmar Siddiqui, Document Control
Officer, Engineering and Analysis
Division (4303T), U.S. EPA, 1200
Pennsylvania Ave. NW, Washington, DC
20460, or via email at siddiqui.ahmar@
epa.gov.
FOR FURTHER INFORMATION CONTACT: M.
Ahmar Siddiqui, Document Control
Officer, at (202) 566–1044, or via email
at siddiqui.ahmar@epa.gov.
SUPPLEMENTARY INFORMATION: EPA has
transferred CBI to various contractors
and subcontractors over the history of
the effluent guidelines program under
40 CFR 2.302(h). EPA determined that
this transfer was necessary to enable the
contractors and subcontractors to
perform their work in supporting EPA
in planning, developing, and reviewing
effluent guidelines and standards for
certain industries.
Pursuant to 40 CFR 2.302(h)(2), EPA
is giving notice that, effective November
1, 2022, it has entered into a new
contract with ERG, contract number
68HERC23D0001, located in Chantilly,
Virginia. The purpose of this contract is
to secure technical and engineering
analysis support for EPA in its
development, review, implementation,
and defense of water-related initiatives
SUMMARY:
E:\FR\FM\08MRN1.SGM
08MRN1
Agencies
[Federal Register Volume 88, Number 45 (Wednesday, March 8, 2023)]
[Notices]
[Pages 14361-14362]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-04676]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2232-855]
Duke Energy Carolinas, LLC; Notice of Application Accepted for
Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Amendment of license to construct stability
berm at the Mountain Island development.
b. Project No.: 2232-855.
c. Date Filed: December 22, 2022.
d. Applicant: Duke Energy Carolinas, LLC.
e. Name of Project: Catawba-Wateree Hydroelectric Project.
f. Location: The Mountain Island development is located on the
Catawba River in Gaston, Lincoln, and Mecklenburg counties, North
Carolina.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Mr. Jeffrey G. Lineberger, Director of Water
Strategy and Hydro Licensing, Duke Energy, Mail Code EC-12Q, 526 South
Church Street, Charlotte, NC 28202, (704) 382-5942.
i. FERC Contact: Mr. Steven Sachs, (202) 502-8666,
[email protected].
j. Deadline for filing comments, motions to intervene, and protests
is 30 days from the issuance of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file comments,
motions to intervene, and protests using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, you may submit a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, MD 20852. The first page of any filing should
include docket number P-2232-855.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
[[Page 14362]]
k. Description of Request: The applicant requests an amendment of
license to construct a compacted earthfill stability berm on the
downstream slope of the earthen embankment dam at the south end of the
powerhouse at the Mountain Island development. The berm would have
approximately the same crest elevation and length as the existing
earthen embankment but would widen the dam and extend the footprint of
the dam approximately 150 feet farther downstream. The applicant would
obtain the material for the proposed berm from a 17-acre onsite borrow
area to the southwest of the existing embankment. The applicant also
proposes to close the upstream tailrace fishing platform and associated
parking lot for the duration of the construction activities and would
reroute access to the downstream fishing platform. Construction would
last approximately 3 years and is necessary to reduce the risk of dam
failure during a seismic event.
l. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at [email protected] or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Motions to Intervene, or Protests: Anyone may submit
comments, a motion to intervene, or a protest in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, motions to
intervene, or protests must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``MOTION TO
INTERVENE'', or ``PROTEST'' as applicable; (2) set forth in the heading
the name of the applicant and the project number(s) of the application
to which the filing responds; (3) furnish the name, address, and
telephone number of the person intervening or protesting; and (4)
otherwise comply with the requirements of 18 CFR 385.2001 through
385.2005. All comments, motions to intervene, or protests must set
forth their evidentiary basis. A copy of all other filings in reference
to this application must be accompanied by proof of service on all
persons listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 385.2010.
Dated: March 1, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-04676 Filed 3-7-23; 8:45 am]
BILLING CODE 6717-01-P