St. Anthony Hydro, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 14155-14156 [2023-04559]
Download as PDF
Federal Register / Vol. 88, No. 44 / Tuesday, March 7, 2023 / Notices
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
how-guides.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before April 29,
2023. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
ddrumheller on DSK120RN23PROD with NOTICES1
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–75–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 7
7 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
VerDate Sep<11>2014
19:49 Mar 06, 2023
Jkt 259001
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–75–
000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To send via any other courier, use the
following address:, Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FERCOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served to the applicant by mail
to: David Alonzo, Manager, Project
Authorizations, 7000 Louisiana Street,
Suite 1300, Houston, Texas 77002–2700
or by email (with a link to the
document) at david.alonzo@
tcenergy.com.
Any subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to https://www.ferc.gov/ferconline/overview.
Dated: February 28, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–04557 Filed 3–6–23; 8:45 am]
BILLING CODE 6717–01–P
interested persons to submit brief, text-only
comments on a project.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
14155
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14552–003]
St. Anthony Hydro, LLC; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
and Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 14552–003.
c. Date Filed: January 3, 2023.
d. Submitted by: St. Anthony Hydro,
LLC.
e. Name of Project: St. Anthony
Hydroelectric Project.
f. Location: On the Henry’s Fork of the
Snake River, in Fremont County, Idaho.
No federal lands are occupied by the
project works or located within the
project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Peter
Josten, GeoSense, LLC, 2742 Saint
Charles Ave., Idaho Falls, ID 83404;
(208) 339–3542; email—peter.gsense@
gmail.com.
i. FERC Contact: John Matkowski at
(202) 502–8576; or email at
john.matkowski@ferc.gov.
j. St. Anthony Hydro, LLC (St.
Anthony Hydro) filed its request to use
the Traditional Licensing Process on
January 3, 2023. St. Anthony Hydro
provided public notice of its request on
January 6, 2023. In a letter dated
February 27, 2023, the Director of the
Division of Hydropower Licensing
approved St. Anthony Hydro’s request
to use the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50 CFR
part 402; and NOAA Fisheries under
section 305(b) of the Magnuson-Stevens
Fishery Conservation and Management
Act and implementing regulations at 50
CFR 600.920. We are also initiating
consultation with the Idaho State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. St. Anthony Hydro filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
E:\FR\FM\07MRN1.SGM
07MRN1
14156
Federal Register / Vol. 88, No. 44 / Tuesday, March 7, 2023 / Notices
CFR 5.6 of the Commission’s
regulations.
m. A copy of the PAD may be viewed
on the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY).
n. The licensee states its unequivocal
intent to submit an application for a
subsequent license for Project No. P–
14552. Pursuant to 18 CFR 16.20 each
application for a subsequent license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by December 31, 2025.
o. Register online at https://
ferconline.ferc.gov/FERCOnline.aspx to
be notified via email of new filing and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
Dated: February 28, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–04559 Filed 3–6–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas & Oil
Pipeline Rate and Refund Report filings:
ddrumheller on DSK120RN23PROD with NOTICES1
Filings Instituting Proceedings
Docket Numbers: PR23–35–000.
Applicants: Enable Oklahoma
Intrastate Transmission, LLC.
Description: § 284.123(g) Rate Filing:
Enable Revised Fuel Percentages April
1, 2023–March 31, 2024 to be effective
4/1/2023.
Filed Date: 2/28/23.
Accession Number: 20230228–5226.
Comment Date: 5 p.m. ET 3/21/23.
284.123(g) Protest: 5 p.m. ET 5/1/23.
Docket Numbers: PR23–36–000.
Applicants: Enable Oklahoma
Intrastate Transmission, LLC.
Description: § 284.123(g) Rate Filing:
Enable Revised Fuel Percentages April
1, 2023-March 31, 2024 to be effective
4/1/2023.
Filed Date: 3/1/23.
Accession Number: 20230301–5002.
VerDate Sep<11>2014
19:49 Mar 06, 2023
Jkt 259001
Comment Date: 5 p.m. ET 3/22/23.
284.123(g) Protest: 5 p.m. ET 5/1/23.
Docket Numbers: PR23–37–000.
Applicants: Valley Crossing Pipeline,
LLC.
Description: § 284.123 Rate Filing:
VCP Address Change Filing to be
effective 3/1/2023.
Filed Date: 3/1/23.
Accession Number: 20230301–5049.
Comment Date: 5 p.m. ET 3/22/23.
Docket Numbers: RP23–494–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing: NonConforming Agreements Update (SRP
2023) to be effective 4/1/2023.
Filed Date: 2/28/23.
Accession Number: 20230228–5214.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–495–000.
Applicants: LA Storage, LLC.
Description: § 4(d) Rate Filing: LA
Storage 2023 Annual Adjustment of
Fuel Retainage Percenta to be effective
4/1/2023.
Filed Date: 2/28/23.
Accession Number: 20230228–5219.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–496–000.
Applicants: High Island Offshore
System, L.L.C.
Description: 2022 Annual Fuel
Tracker filing of High Island Offshore
System, LLC under RP23–496.
Filed Date: 2/28/23.
Accession Number: 20230228–5233.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–497–000.
Applicants: Midcontinent Express
Pipeline LLC.
Description: § 4(d) Rate Filing: MEP
Cashout Filing Feb 2023 to be effective
4/1/2023.
Filed Date: 2/28/23.
Accession Number: 20230228–5234.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–498–000.
Applicants: Columbia Gulf
Transmission, LLC.
Description: § 4(d) Rate Filing: TRA
2023 to be effective 4/1/2023.
Filed Date: 2/28/23.
Accession Number: 20230228–5264.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–499–000.
Applicants: Golden Pass Pipeline
LLC.
Description: § 4(d) Rate Filing: GPPL
Retainage Report for 2023 to be effective
4/1/2023.
Filed Date: 2/28/23.
Accession Number: 20230228–5276.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–500–000.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
Description: § 4(d) Rate Filing:
Volume No. 2—Citadel Energy
Marketing, LLC SP378772 to be effective
3/1/2023.
Filed Date: 2/28/23.
Accession Number: 20230228–5279.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–501–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: EPCA
2023 to be effective 4/1/2023.
Filed Date: 2/28/23.
Accession Number: 20230228–5302.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–502–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: TCRA
2023 to be effective 4/1/2023.
Filed Date: 2/28/23.
Accession Number: 20230228–5303.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–503–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: RAM
2023 to be effective 4/1/2023.
Filed Date: 2/28/23.
Accession Number: 20230228–5308.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–504–000.
Applicants: TransCameron Pipeline,
LLC.
Description: Annual Report of
Operational Purchases and Sales of
TransCameron Pipeline, LLC.
Filed Date: 2/28/23.
Accession Number: 20230228–5349.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–505–000.
Applicants: WBI Energy
Transmission, Inc.
Description: § 4(d) Rate Filing: 2023
Negotiated and Non-Conforming SA
ONEOK FT–1833 to be effective 4/1/
2023.
Filed Date: 3/1/23.
Accession Number: 20230301–5006.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–506–000.
Applicants: WBI Energy
Transmission, Inc.
Description: § 4(d) Rate Filing: 2023
Annual Fuel & Electric Power
Reimbursement Adjustment to be
effective 4/1/2023.
Filed Date: 3/1/23.
Accession Number: 20230301–5008.
Comment Date: 5 p.m. ET 3/13/23.
Docket Numbers: RP23–507–000.
Applicants: WBI Energy
Transmission, Inc.
Description: § 4(d) Rate Filing: 2023
Fuel and Electric Power Reimbursement
Adjustment Provision to be effective 4/
1/2023.
E:\FR\FM\07MRN1.SGM
07MRN1
Agencies
[Federal Register Volume 88, Number 44 (Tuesday, March 7, 2023)]
[Notices]
[Pages 14155-14156]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-04559]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14552-003]
St. Anthony Hydro, LLC; Notice of Intent To File License
Application, Filing of Pre-Application Document, and Approving Use of
the Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 14552-003.
c. Date Filed: January 3, 2023.
d. Submitted by: St. Anthony Hydro, LLC.
e. Name of Project: St. Anthony Hydroelectric Project.
f. Location: On the Henry's Fork of the Snake River, in Fremont
County, Idaho. No federal lands are occupied by the project works or
located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Peter Josten, GeoSense, LLC, 2742
Saint Charles Ave., Idaho Falls, ID 83404; (208) 339-3542; email_
[email protected]
i. FERC Contact: John Matkowski at (202) 502-8576; or email at
[email protected].
j. St. Anthony Hydro, LLC (St. Anthony Hydro) filed its request to
use the Traditional Licensing Process on January 3, 2023. St. Anthony
Hydro provided public notice of its request on January 6, 2023. In a
letter dated February 27, 2023, the Director of the Division of
Hydropower Licensing approved St. Anthony Hydro's request to use the
Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7
of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the Idaho State Historic Preservation Officer, as
required by section 106, National Historic Preservation Act, and the
implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. St. Anthony Hydro filed a Pre-Application Document (PAD;
including a proposed process plan and schedule) with the Commission,
pursuant to 18
[[Page 14156]]
CFR 5.6 of the Commission's regulations.
m. A copy of the PAD may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY).
n. The licensee states its unequivocal intent to submit an
application for a subsequent license for Project No. P-14552. Pursuant
to 18 CFR 16.20 each application for a subsequent license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by December 31,
2025.
o. Register online at https://ferconline.ferc.gov/FERCOnline.aspx
to be notified via email of new filing and issuances related to this or
other pending projects. For assistance, contact FERC Online Support.
Dated: February 28, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-04559 Filed 3-6-23; 8:45 am]
BILLING CODE 6717-01-P