ANR Pipeline Company; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 14154-14155 [2023-04557]

Download as PDF 14154 Federal Register / Vol. 88, No. 44 / Tuesday, March 7, 2023 / Notices 12. State of the petrochemical sector 13. Any other business: Date of next SOM/SEQ meetings: 13– 15 June 2023 Close of meeting. As provided in section 252(c)(1)(A)(ii) of the Energy Policy and Conservation Act (42 U.S.C. 6272(c)(1)(A)(ii)), the meetings of the IAB are open to representatives of members of the IAB and their counsel; representatives of members of the IEA’s Standing Group on Emergency Questions and the IEA’s Standing Group on the Oil Markets; representatives of the Departments of Energy, Justice, and State, the Federal Trade Commission, the General Accounting Office, Committees of Congress, the IEA, and the European Commission; and invitees of the IAB, the SEQ, the SOM, or the IEA. Signing Authority: This document of the Department of Energy was signed on March 2, 2023, by Thomas Reilly, Assistant General Counsel for International and National Security Programs, pursuant to delegated authority from the Secretary of Energy. That document with the original signature and date is maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register. Signed in Washington, DC, March 2, 2023. Treena V. Garrett, Federal Register Liaison Officer, U.S. Department of Energy. [FR Doc. 2023–04653 Filed 3–6–23; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission ddrumheller on DSK120RN23PROD with NOTICES1 [Docket No. CP23–75–000] ANR Pipeline Company; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that February 22, 2023, ANR Pipeline Company. (ANR) filed a prior notice request for authorization, in accordance with section 7 of the Natural Gas Act, and Part 157 Sections 157.205 and 157.216 of the Federal Energy Regulatory Commission’s (Commission) VerDate Sep<11>2014 19:49 Mar 06, 2023 Jkt 259001 regulations under the Natural Gas Act and ANR’s blanket certificate issued in Docket No. CP82–480–000 for authorization to abandon two injection/ withdrawal wells and appurtenances, located in its Loreed Storage Field in Osceola County, Michigan, all as more fully set forth in the application which is on file with the Commission and open for public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application should be directed to David Alonzo, Manager, Project Authorizations, 7000 Louisiana Street, Suite 1300, Houston, Texas 77002–2700 at 832–320–5477; or email at David.Alonzo@tcenergy.com. Pursuant to Section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. 1 18 PO 00000 CFR (Code of Federal Regulations) 157.9. Frm 00041 Fmt 4703 Sfmt 4703 Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on April 29, 2023. How to file protests, motions to intervene, and comments is explained below. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,2 any person 3 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,4 and must be submitted by the protest deadline, which is April 29, 2023. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 5 and the regulations under the NGA 6 by the intervention deadline for the project, which is April 29, 2023. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding 2 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 4 18 CFR 157.205(e). 5 18 CFR 385.214. 6 18 CFR 157.10. 3 Persons E:\FR\FM\07MRN1.SGM 07MRN1 Federal Register / Vol. 88, No. 44 / Tuesday, March 7, 2023 / Notices the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ how-guides. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before April 29, 2023. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. ddrumheller on DSK120RN23PROD with NOTICES1 How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP23–75–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing’’; or 7 7 Additionally, you may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for VerDate Sep<11>2014 19:49 Mar 06, 2023 Jkt 259001 (2) You can file a paper copy of your submission by mailing it to the address below. Your submission must reference the Project docket number CP23–75– 000. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 To send via any other courier, use the following address:, Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852 The Commission encourages electronic filing of submissions (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FERCOnlineSupport@ferc.gov. Protests and motions to intervene must be served to the applicant by mail to: David Alonzo, Manager, Project Authorizations, 7000 Louisiana Street, Suite 1300, Houston, Texas 77002–2700 or by email (with a link to the document) at david.alonzo@ tcenergy.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to https://www.ferc.gov/ferconline/overview. Dated: February 28, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–04557 Filed 3–6–23; 8:45 am] BILLING CODE 6717–01–P interested persons to submit brief, text-only comments on a project. PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 14155 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14552–003] St. Anthony Hydro, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 14552–003. c. Date Filed: January 3, 2023. d. Submitted by: St. Anthony Hydro, LLC. e. Name of Project: St. Anthony Hydroelectric Project. f. Location: On the Henry’s Fork of the Snake River, in Fremont County, Idaho. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Peter Josten, GeoSense, LLC, 2742 Saint Charles Ave., Idaho Falls, ID 83404; (208) 339–3542; email—peter.gsense@ gmail.com. i. FERC Contact: John Matkowski at (202) 502–8576; or email at john.matkowski@ferc.gov. j. St. Anthony Hydro, LLC (St. Anthony Hydro) filed its request to use the Traditional Licensing Process on January 3, 2023. St. Anthony Hydro provided public notice of its request on January 6, 2023. In a letter dated February 27, 2023, the Director of the Division of Hydropower Licensing approved St. Anthony Hydro’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the Idaho State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. St. Anthony Hydro filed a PreApplication Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 E:\FR\FM\07MRN1.SGM 07MRN1

Agencies

[Federal Register Volume 88, Number 44 (Tuesday, March 7, 2023)]
[Notices]
[Pages 14154-14155]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-04557]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-75-000]


ANR Pipeline Company; Notice of Request Under Blanket 
Authorization and Establishing Intervention and Protest Deadline

    Take notice that February 22, 2023, ANR Pipeline Company. (ANR) 
filed a prior notice request for authorization, in accordance with 
section 7 of the Natural Gas Act, and Part 157 Sections 157.205 and 
157.216 of the Federal Energy Regulatory Commission's (Commission) 
regulations under the Natural Gas Act and ANR's blanket certificate 
issued in Docket No. CP82-480-000 for authorization to abandon two 
injection/withdrawal wells and appurtenances, located in its Loreed 
Storage Field in Osceola County, Michigan, all as more fully set forth 
in the application which is on file with the Commission and open for 
public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions concerning this application should be directed to 
David Alonzo, Manager, Project Authorizations, 7000 Louisiana Street, 
Suite 1300, Houston, Texas 77002-2700 at 832-320-5477; or email at 
[email protected].
    Pursuant to Section 157.9 of the Commission's Rules of Practice and 
Procedure,\1\ within 90 days of this Notice the Commission staff will 
either: complete its environmental review and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or environmental 
assessment (EA) for this proposal. The filing of an EA in the 
Commission's public record for this proceeding or the issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
federal and state agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
---------------------------------------------------------------------------

    \1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on April 29, 2023. 
How to file protests, motions to intervene, and comments is explained 
below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\2\ any person \3\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \2\ 18 CFR 157.205.
    \3\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\4\ and must be submitted by 
the protest deadline, which is April 29, 2023. A protest may also serve 
as a motion to intervene so long as the protestor states it also seeks 
to be an intervenor.
---------------------------------------------------------------------------

    \4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \5\ and the regulations under the NGA \6\ by the 
intervention deadline for the project, which is April 29, 2023. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding

[[Page 14155]]

the proceeding, as well as your interest in the proceeding. For an 
individual, this could include your status as a landowner, ratepayer, 
resident of an impacted community, or recreationist. You do not need to 
have property directly impacted by the project in order to intervene. 
For more information about motions to intervene, refer to the FERC 
website at https://www.ferc.gov/how-guides.
---------------------------------------------------------------------------

    \5\ 18 CFR 385.214.
    \6\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before April 29, 2023. The filing of a comment alone will not 
serve to make the filer a party to the proceeding. To become a party, 
you must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP23-75-000 in your submission.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing''; or \7\
---------------------------------------------------------------------------

    \7\ Additionally, you may file your comments electronically by 
using the eComment feature, which is located on the Commission's 
website at www.ferc.gov under the link to Documents and Filings. 
Using eComment is an easy method for interested persons to submit 
brief, text-only comments on a project.
---------------------------------------------------------------------------

    (2) You can file a paper copy of your submission by mailing it to 
the address below. Your submission must reference the Project docket 
number CP23-75-000.

To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426
To send via any other courier, use the following address:, Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852

    The Commission encourages electronic filing of submissions (option 
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
    Protests and motions to intervene must be served to the applicant 
by mail to: David Alonzo, Manager, Project Authorizations, 7000 
Louisiana Street, Suite 1300, Houston, Texas 77002-2700 or by email 
(with a link to the document) at [email protected]
    Any subsequent submissions by an intervenor must be served on the 
applicant and all other parties to the proceeding. Contact information 
for parties can be downloaded from the service list at the eService 
link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to https://www.ferc.gov/ferc-online/overview.

    Dated: February 28, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-04557 Filed 3-6-23; 8:45 am]
BILLING CODE 6717-01-P