Establishing Interregional Transfer Capability Transmission Planning and Cost Allocation Requirements; Notice Requesting Post-Workshop Comment, 13818 [2023-04534]
Download as PDF
13818
Federal Register / Vol. 88, No. 43 / Monday, March 6, 2023 / Notices
For more information about this
Notice, please contact:
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD23–3–000]
lotter on DSK11XQN23PROD with NOTICES1
Establishing Interregional Transfer
Capability Transmission Planning and
Cost Allocation Requirements; Notice
Requesting Post-Workshop Comment
On December 5 and 6, 2022, Federal
Energy Regulatory Commission
(Commission) staff convened a
workshop to discuss whether and how
the Commission could establish a
minimum requirement for Interregional
Transfer Capability for public utility
transmission providers in transmission
planning and cost allocation processes.
All interested persons are invited to
file post-workshop comments on issues
raised during the workshop that they
believe would benefit from further
discussion. In addition to addressing the
questions listed in the Supplemental
Notice,1 parties are also invited to
provide comments on the questions
listed below. Commenters need not
respond to all topics or questions asked.
Commenters may reference material
previously filed in this docket,
including the workshop transcript, but
are encouraged to avoid repetition or
replication of previous material. In
addition, commenters are encouraged,
when possible, to provide examples and
quantitative data in support of their
answers. Comments must be submitted
on or before 75 days from the date of
this notice and reply comments are due
120 days from the date of this notice.
Comments may be filed electronically
via the internet.2 Instructions are
available on the Commission’s website
https://www.ferc.gov/docs-filing/
efiling.asp. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, submissions
sent via the U.S. Postal Service must be
addressed to: Federal Energy Regulatory
Commission, Office of the Secretary,
888 First Street NE, Washington, DC
20426. Submissions sent via any other
carrier must be addressed to: Federal
Energy Regulatory Commission, Office
of the Secretary, 12225 Wilkins Avenue,
Rockville, MD 20852.
1 Supplemental Notice of Staff-Led Workshop,
Docket No. AD23–3–000 (Nov. 30, 2022); see also
Errata Notice, Docket No. AD23–3–000 (Dec. 2,
2022) (Supplemental Notices).
2 See 18 CFR 385.2001(a)(1)(iii) (2021).
VerDate Sep<11>2014
19:26 Mar 03, 2023
Jkt 259001
Jessica Cockrell (Technical Information),
Office of Energy Policy and
Innovation, (202) 502–8190,
Jessica.Cockrell@ferc.gov
Moon Athwal (Legal Information),
Office of the General Counsel, (202)
502–6272, Moon.Athwal@ferc.gov
Dated: February 28, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–04534 Filed 3–3–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4440–002]
Central Virginia Electric Cooperative,
Harris Bridge Hydro LLC; Notice of
Transfer of Exemption
1. On August 2, 2022, Central Virginia
Electric Cooperative, exemptee for the
400-kilowatt Harris Bridge
Hydroelectric Project No. 4440, filed a
letter notifying the Commission that the
project was transferred from Central
Virginia Electric Cooperative to Harris
Bridge Hydro LLC. The exemption from
licensing was originally issued on
March 15, 1982.1 The project is located
on the Rockfish River, Nelson County,
Virginia. The transfer of an exemption
does not require Commission approval.
2. Harris Bridge Hydro LLC is now the
exemptee of the Harris Bridge
Hydroelectric Project No. 4440. All
correspondence must be forwarded to
Mr. Frederic Reveiz, Managing Member,
Harris Bridge Hydro LLC, 5425
Wisconsin Avenue, Suite 600, Chevy
Chase, Maryland 20815, Phone: 202–
361–2092, Email: Frederic.Reveiz@
asilea.com.
Dated: February 27, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–04450 Filed 3–3–23; 8:45 am]
BILLING CODE 6717–01–P
1 Rockfish Corporation, 18 FERC ¶ 62,449 (1982).
On November 13, 2012, the project was transferred
to Central Virginia Electric Cooperative.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG23–86–000.
Applicants: Nestlewood Solar I LLC.
Description: Nestlewood Solar I LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 2/28/23.
Accession Number: 20230228–5220.
Comment Date: 5 p.m. ET 3/21/23.
Docket Numbers: EG23–87–000.
Applicants: North Central Valley
Energy Storage, LLC.
Description: North Central Valley
Energy Storage, LLC submits Notice of
Self-Certification of Exempt Wholesale
Generator Status.
Filed Date: 2/28/23.
Accession Number: 20230228–5229.
Comment Date: 5 p.m. ET 3/21/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER23–539–001.
Applicants: Morongo Transmission
LLC.
Description: Compliance filing:
Deficiency Response in Docket ER23–
539 to be effective 1/1/2023.
Filed Date: 2/27/23.
Accession Number: 20230227–5223.
Comment Date: 5 p.m. ET 3/20/23.
Docket Numbers: ER23–577–002.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Amendment of Amended ISA, SA No.
2360, Queue No. AD2–133/Q36 Docket
No. ER23–577 to be effective 2/6/2023.
Filed Date: 2/27/23.
Accession Number: 20230227–5187.
Comment Date: 5 p.m. ET 3/20/23.
Docket Numbers: ER23–882–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Amendment to Amended ISA and ICSA,
SA Nos. 5366 and 5367; Queue No.
AB2–161 to be effective 3/20/2023.
Filed Date: 2/28/23.
Accession Number: 20230228–5101.
Comment Date: 5 p.m. ET 3/21/23.
Docket Numbers: ER23–940–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Amendment of Amended WMPA, SA
No. 5294; Queue No. AC2–120 in
Docket No. ER23–940 to be effective 3/
27/2023.
E:\FR\FM\06MRN1.SGM
06MRN1
Agencies
[Federal Register Volume 88, Number 43 (Monday, March 6, 2023)]
[Notices]
[Page 13818]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-04534]
[[Page 13818]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD23-3-000]
Establishing Interregional Transfer Capability Transmission
Planning and Cost Allocation Requirements; Notice Requesting Post-
Workshop Comment
On December 5 and 6, 2022, Federal Energy Regulatory Commission
(Commission) staff convened a workshop to discuss whether and how the
Commission could establish a minimum requirement for Interregional
Transfer Capability for public utility transmission providers in
transmission planning and cost allocation processes.
All interested persons are invited to file post-workshop comments
on issues raised during the workshop that they believe would benefit
from further discussion. In addition to addressing the questions listed
in the Supplemental Notice,\1\ parties are also invited to provide
comments on the questions listed below. Commenters need not respond to
all topics or questions asked.
---------------------------------------------------------------------------
\1\ Supplemental Notice of Staff-Led Workshop, Docket No. AD23-
3-000 (Nov. 30, 2022); see also Errata Notice, Docket No. AD23-3-000
(Dec. 2, 2022) (Supplemental Notices).
---------------------------------------------------------------------------
Commenters may reference material previously filed in this docket,
including the workshop transcript, but are encouraged to avoid
repetition or replication of previous material. In addition, commenters
are encouraged, when possible, to provide examples and quantitative
data in support of their answers. Comments must be submitted on or
before 75 days from the date of this notice and reply comments are due
120 days from the date of this notice.
Comments may be filed electronically via the internet.\2\
Instructions are available on the Commission's website https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact
FERC Online Support at [email protected] or toll free at 1-
866-208-3676, or for TTY, (202) 502-8659. Although the Commission
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, submissions sent via the U.S. Postal Service must
be addressed to: Federal Energy Regulatory Commission, Office of the
Secretary, 888 First Street NE, Washington, DC 20426. Submissions sent
via any other carrier must be addressed to: Federal Energy Regulatory
Commission, Office of the Secretary, 12225 Wilkins Avenue, Rockville,
MD 20852.
---------------------------------------------------------------------------
\2\ See 18 CFR 385.2001(a)(1)(iii) (2021).
---------------------------------------------------------------------------
For more information about this Notice, please contact:
Jessica Cockrell (Technical Information), Office of Energy Policy and
Innovation, (202) 502-8190, [email protected]
Moon Athwal (Legal Information), Office of the General Counsel, (202)
502-6272, [email protected]
Dated: February 28, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-04534 Filed 3-3-23; 8:45 am]