National Fuel Gas Supply Corporation; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 13819-13820 [2023-04451]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 88, No. 43 / Monday, March 6, 2023 / Notices Filed Date: 2/28/23. Accession Number: 20230228–5200. Comment Date: 5 p.m. ET 3/21/23. Docket Numbers: ER23–962–001. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Amendment of Amended ISA, SA No. 6116; Queue No. AE1–129 in Docket No. ER23–962 to be effective 3/28/2023. Filed Date: 2/28/23. Accession Number: 20230228–5215. Comment Date: 5 p.m. ET 3/21/23. Docket Numbers: ER23–1189–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA and ICSA, Service Agreement Nos. 6810 and 6811; Queue No. AE1–179 to be effective 1/30/2023. Filed Date: 2/28/23. Accession Number: 20230228–5044. Comment Date: 5 p.m. ET 3/21/23. Docket Numbers: ER23–1190–000. Applicants: Ohio Power Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Ohio Power Company submits tariff filing per 35.13(a)(2)(iii: AEP and METC submit Amended and Restated Interconnection Agreement, SA No. 4251 to be effective 12/21/2019. Filed Date: 2/28/23. Accession Number: 20230228–5068. Comment Date: 5 p.m. ET 3/21/23. Docket Numbers: ER23–1191–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: CCSF Warnerville Substation WPA (TO SA 284) to be effective 1/26/2023. Filed Date: 2/28/23. Accession Number: 20230228–5184. Comment Date: 5 p.m. ET 3/21/23. Docket Numbers: ER23–1192–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Rate Schedule No. 316, Interconnection Agreement with AEPCO at Saguaro to be effective 4/30/2023. Filed Date: 2/28/23. Accession Number: 20230228–5223. Comment Date: 5 p.m. ET 3/21/23. Docket Numbers: ER23–1194–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Service Agreement No. 409, HV Sunrise LLC LGIA to be effective 1/30/2023. Filed Date: 2/28/23. Accession Number: 20230228–5235. Comment Date: 5 p.m. ET 3/21/23. Docket Numbers: ER23–1195–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2023–02–28_DIR vis-a`-vis Ramp VerDate Sep<11>2014 19:26 Mar 03, 2023 Jkt 259001 Capability Products Filing to be effective 6/1/2023. Filed Date: 2/28/23. Accession Number: 20230228–5254. Comment Date: 5 p.m. ET 3/21/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 28, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–04536 Filed 3–3–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 13819 inventory. National Fuel states that the Lawtons Well 7459 Project will have no impact on the Lawtons Storage Field’s certificated physical parameters. The estimated cost of the project is approximately $2.91 million, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TTY, (202) 502–8659. Any questions concerning this application should be directed to Alice A. Curtiss, Deputy General Counsel for National Fuel Gas Supply Corporation, 6363 Main Street, Williamsville, New York 14221; by phone at (716) 857– 7075, or by email to curtissa@ natfuel.com. [Docket No. CP23–72–000] Public Participation National Fuel Gas Supply Corporation; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on April 28, 2023. How to file protests, motions to intervene, and comments is explained below. Take notice that on February 17, 2023, National Fuel Gas Supply Corporation (National Fuel) 6363 Main Street, Williamsville, New York 14221, filed a prior notice request pursuant to Sections 157.205, 157.208, and 157.213 of the Commission’s regulations under the Natural Gas Act and the blanket certificate issued by the Commission in Docket No. CP83–4–000,1 requesting authorization to construct and operate its Lawtons Well 7459 Project that consists of one new injection/ withdrawal storage well, related pipeline and appurtenances at its Lawtons Storage Field in Erie County, New York. The new well is proposed to improve the deliverability of the field, to allow more efficient withdrawal of Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,2 any person 3 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the 2 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 3 Persons 1 National Fuel Gas Supply Corporation, 21 FERC ¶ 62,298 (1982). PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 E:\FR\FM\06MRN1.SGM 06MRN1 13820 Federal Register / Vol. 88, No. 43 / Monday, March 6, 2023 / Notices lotter on DSK11XQN23PROD with NOTICES1 allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,4 and must be submitted by the protest deadline, which is April 28, 2023. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 5 and the regulations under the NGA 6 by the intervention deadline for the project, which is April 28, 2023. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) 4 18 CFR 157.205(e). CFR 385.214. 6 18 CFR 157.10. 5 18 VerDate Sep<11>2014 19:26 Mar 03, 2023 Jkt 259001 of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before April 28, 2023. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the project docket number CP23–72–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing.’’ The Commission’s eFiling staff are available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. (2) You can file a paper copy of your submission. Your submission must reference the project docket number CP23–72–000. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 To send via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852 Protests and motions to intervene must be served on the applicant either by mail or email (with a link to the document) at: Alice A. Curtiss, Deputy General Counsel for National Fuel Gas Supply Corporation, 6363 Main Street, Williamsville, New York 14221; or by email to curtissa@natfuel.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Dated: February 27, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–04451 Filed 3–3–23; 8:45 am] BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC22–17–000] Commission Information Collection Activities (FERC–549); Comment Request; Extension Federal Energy Regulatory Commission, Department of Energy. ACTION: Notice of information collection and request for comments. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC– 549 (NGPA Section 311 Transactions, NGA Blanket Certificate Transactions, and Market-Based Rates for Storage) which will be submitted to the Office of Management and Budget (OMB) for a review of the information collection requirements. SUMMARY: Comments on the collection of information are due April 5, 2023. ADDRESSES: Send written comments on FERC–549 to OMB through www.reginfo.gov/public/do/PRAMain, Attention: Federal Energy Regulatory Commission Desk Officer. Please DATES: E:\FR\FM\06MRN1.SGM 06MRN1

Agencies

[Federal Register Volume 88, Number 43 (Monday, March 6, 2023)]
[Notices]
[Pages 13819-13820]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-04451]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-72-000]


National Fuel Gas Supply Corporation; Notice of Request Under 
Blanket Authorization and Establishing Intervention and Protest 
Deadline

    Take notice that on February 17, 2023, National Fuel Gas Supply 
Corporation (National Fuel) 6363 Main Street, Williamsville, New York 
14221, filed a prior notice request pursuant to Sections 157.205, 
157.208, and 157.213 of the Commission's regulations under the Natural 
Gas Act and the blanket certificate issued by the Commission in Docket 
No. CP83-4-000,\1\ requesting authorization to construct and operate 
its Lawtons Well 7459 Project that consists of one new injection/
withdrawal storage well, related pipeline and appurtenances at its 
Lawtons Storage Field in Erie County, New York. The new well is 
proposed to improve the deliverability of the field, to allow more 
efficient withdrawal of inventory. National Fuel states that the 
Lawtons Well 7459 Project will have no impact on the Lawtons Storage 
Field's certificated physical parameters. The estimated cost of the 
project is approximately $2.91 million, all as more fully set forth in 
the request which is on file with the Commission and open to public 
inspection.
---------------------------------------------------------------------------

    \1\ National Fuel Gas Supply Corporation, 21 FERC ] 62,298 
(1982).
---------------------------------------------------------------------------

    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (www.ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TTY, (202) 502-8659.
    Any questions concerning this application should be directed to 
Alice A. Curtiss, Deputy General Counsel for National Fuel Gas Supply 
Corporation, 6363 Main Street, Williamsville, New York 14221; by phone 
at (716) 857-7075, or by email to [email protected].

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on April 28, 2023. 
How to file protests, motions to intervene, and comments is explained 
below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\2\ any person \3\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the

[[Page 13820]]

allowed time for filing a protest, the proposed activity shall be 
deemed to be authorized effective the day after the time allowed for 
protest. If a protest is filed and not withdrawn within 30 days after 
the time allowed for filing a protest, the instant request for 
authorization will be considered by the Commission.
---------------------------------------------------------------------------

    \2\ 18 CFR 157.205.
    \3\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\4\ and must be submitted by 
the protest deadline, which is April 28, 2023. A protest may also serve 
as a motion to intervene so long as the protestor states it also seeks 
to be an intervenor.
---------------------------------------------------------------------------

    \4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \5\ and the regulations under the NGA \6\ by the 
intervention deadline for the project, which is April 28, 2023. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \5\ 18 CFR 385.214.
    \6\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before April 28, 2023. The filing of a comment alone will not 
serve to make the filer a party to the proceeding. To become a party, 
you must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the project docket number 
CP23-72-000 in your submission.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select ``General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing.'' The Commission's eFiling 
staff are available to assist you at (202) 502-8258 or 
[email protected]
    (2) You can file a paper copy of your submission. Your submission 
must reference the project docket number CP23-72-000.

To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426
To send via any other courier, use the following address: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852

    Protests and motions to intervene must be served on the applicant 
either by mail or email (with a link to the document) at: Alice A. 
Curtiss, Deputy General Counsel for National Fuel Gas Supply 
Corporation, 6363 Main Street, Williamsville, New York 14221; or by 
email to [email protected].
    Any subsequent submissions by an intervenor must be served on the 
applicant and all other parties to the proceeding. Contact information 
for parties can be downloaded from the service list at the eService 
link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.

    Dated: February 27, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-04451 Filed 3-3-23; 8:45 am]
BILLING CODE P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.