Combined Notice of Filings #1, 13113-13114 [2023-04313]
Download as PDF
Federal Register / Vol. 88, No. 41 / Thursday, March 2, 2023 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER23–1165–000]
ddrumheller on DSK120RN23PROD with NOTICES1
McFarland Solar A, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of
McFarland Solar A, LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is March 16,
2023.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
VerDate Sep<11>2014
18:21 Mar 01, 2023
Jkt 259001
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: February 24, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–04309 Filed 3–1–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG23–85–000.
Applicants: Sweetland Wind Farm,
LLC.
Description: Sweetland Wind Farm,
LLC submits Notice of Self-Certification
of Exempt Wholesale Generator Status.
Filed Date: 2/24/23.
Accession Number: 20230224–5145.
Comment Date: 5 p.m. ET 3/17/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER23–495–002.
Applicants: AES CE Solutions, LLC.
Description: Tariff Amendment: AES
CE Solutions, LLC MBR Tariff to be
effective 11/24/2022.
Filed Date: 2/24/23.
Accession Number: 20230224–5122.
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23–757–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Amendment of Amended ISA, SA No.
5422, Queue No. AC1–158 in Docket
No. ER23–757 to be effective 3/1/2023.
Filed Date: 2/24/23.
Accession Number: 20230224–5013.
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23–1173–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2023–02–24_Schedules 24 and 24A Cost
Recovery to be effective 4/26/2023.
Filed Date: 2/24/23.
Accession Number: 20230224–5002.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
13113
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23–1174–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2023–02–24_SA 1756 METC-Consumers
Energy 16th Rev GIA (G479B) to be
effective 2/1/2023.
Filed Date: 2/24/23.
Accession Number: 20230224–5003.
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23–1175–000.
Applicants: Dominion Energy South
Carolina, Inc.
Description: Tariff Amendment:
Jasper Provisional LGIA Notice of
Cancellation to be effective 2/7/2023.
Filed Date: 2/24/23.
Accession Number: 20230224–5018.
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23–1176–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised ISA, Service Agreement No.
6248; QUeue No. AE2–206/AF1–078 to
be effective 1/18/2023.
Filed Date: 2/24/23.
Accession Number: 20230224–5077.
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23–1177–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 217, Exhibit B.PAD–LIB to
be effective 4/28/2023.
Filed Date: 2/24/23.
Accession Number: 20230224–5082.
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23–1178–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: Tariff Amendment:
Alabama Power Company submits tariff
filing per 35.15: SE Solar II (Fayette
Solar) LGIA Termination Filing to be
effective 2/3/2023.
Filed Date: 2/24/23.
Accession Number: 20230224–5093.
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23–1179–000.
Applicants: HIKO Energy, LLC.
Description: Notice of Cancellation of
Market Based Rate Tariff of HIKO
Energy, LLC.
Filed Date: 2/24/23.
Accession Number: 20230224–5156.
Comment Date: 5 p.m. ET 3/17/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
E:\FR\FM\02MRN1.SGM
02MRN1
13114
Federal Register / Vol. 88, No. 41 / Thursday, March 2, 2023 / Notices
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 24, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–04313 Filed 3–1–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–461–000]
ddrumheller on DSK120RN23PROD with NOTICES1
Transcontinental Gas Pipe Line
Company, LLC; Notice of Availability
of the Final Environmental Impact
Statement for the Proposed Southside
Reliability Enhancement Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a final
environmental impact statement (EIS)
for the Southside Reliability
Enhancement Project (Project), proposed
by Transcontinental Gas Pipe Line
Company, LLC (Transco) in the abovereferenced docket. Transco requests
authorization to construct and operate
one new compressor station and modify
two existing compressor stations and
three existing meter stations in North
Carolina and Virginia. The Project
would provide an incremental 423,400
dekatherms per day (Dth/d) of yearround firm transportation capacity from
Transco’s Compressor Station 165 and
Pine Needle Storage Facility along the
mainline and South Virginia Lateral
pipeline systems to delivery points in
North Carolina.
The final EIS assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed Project, with the
mitigation measures recommended in
the EIS, would result in some adverse
environmental impacts; however,
impacts would be reduced to less-than-
VerDate Sep<11>2014
18:21 Mar 01, 2023
Jkt 259001
significant levels. Regarding climate
change impacts, the Project’s
construction and operation emissions
would increase the atmospheric
concentration of greenhouse gases
(GHG), in combination with past,
present, and future emissions from all
other sources. Climate change impacts
are not characterized in the EIS as
significant or insignificant because the
Commission is conducting a generic
proceeding to determine whether and
how the Commission will conduct
significance determinations going
forward.1 The EIS also concludes that
no system or other alternative site
would meet the Project objective while
providing a significant environmental
advantage over the Project as proposed.
The final EIS addresses the potential
environmental effects of the
construction and operation of the
following Project facilities:
• installation of a new compressor
station (Compressor Station 168) which
includes one new 33,000 horsepower
electric motor-driven compressor unit,
and installation of new mainline valves
on South Virginia Lateral A-Line and BLine at the new Compressor Station 168
in Mecklenburg County, Virginia;
• addition of one 16,000 horsepower
electric motor-driven compressor unit at
existing Compressor Station 166 in
Pittsylvania County, Virginia;
• installation of piping modifications
to allow for flow reversal at existing
Compressor Station 155 in Davidson
County, North Carolina;
• replacement of one meter run to
increase delivery volumes at the
existing Ahoskie Meter Station in
Hertford County, North Carolina;
• installation of new facilities to
increase delivery volumes at the
existing Pleasant Hill Meter Station in
Northampton County, North Carolina;
and
• upgrade meter and controls and
debottleneck piping at the existing
Iredell Meter Station in Iredell County,
North Carolina.
The Commission mailed a copy of the
Notice of Availability of the final EIS to
Federal, State, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
Project area. The final EIS is only
available in electronic format. It may be
viewed and downloaded from the
FERC’s website (www.ferc.gov), on the
1 Consideration of Greenhouse Gas Emissions in
Natural Gas Infrastructure Project Reviews, 178
FERC ¶ 61,108 (2022); 178 FERC ¶ 61,197 (2022).
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
natural gas environmental documents
page (https://www.ferc.gov/industriesdata/natural-gas/environment/
environmental-documents). In addition,
the final EIS may be accessed by using
the eLibrary link on the FERC’s website.
Click on the eLibrary link (https://
elibrary.ferc.gov/eLibrary/search), select
‘‘General Search’’, and enter the docket
number in the ‘‘Docket Number’’ field
(i.e., CP22–461). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659.
The final EIS is not a decision
document. It presents Commission
staff’s independent analysis of the
environmental issues for the
Commission to consider when
addressing the merits of all issues in
this proceeding.
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Dated: February 24, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–04310 Filed 3–1–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No 1121–135]
Pacific Gas and Electric Company;
Notice of Waiver Period for Water
Quality Certification Application
On February 2, 2023, Pacific Gas and
Electric Company submitted to the
Federal Energy Regulatory Commission
(Commission) a copy of its application
for a Clean Water Act section 401(a)(1)
water quality certification filed with the
E:\FR\FM\02MRN1.SGM
02MRN1
Agencies
[Federal Register Volume 88, Number 41 (Thursday, March 2, 2023)]
[Notices]
[Pages 13113-13114]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-04313]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG23-85-000.
Applicants: Sweetland Wind Farm, LLC.
Description: Sweetland Wind Farm, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 2/24/23.
Accession Number: 20230224-5145.
Comment Date: 5 p.m. ET 3/17/23.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER23-495-002.
Applicants: AES CE Solutions, LLC.
Description: Tariff Amendment: AES CE Solutions, LLC MBR Tariff to
be effective 11/24/2022.
Filed Date: 2/24/23.
Accession Number: 20230224-5122.
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23-757-001.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Amendment of Amended ISA, SA No.
5422, Queue No. AC1-158 in Docket No. ER23-757 to be effective 3/1/
2023.
Filed Date: 2/24/23.
Accession Number: 20230224-5013.
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23-1173-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2023-02-24_Schedules 24 and
24A Cost Recovery to be effective 4/26/2023.
Filed Date: 2/24/23.
Accession Number: 20230224-5002.
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23-1174-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2023-02-24_SA 1756 METC-
Consumers Energy 16th Rev GIA (G479B) to be effective 2/1/2023.
Filed Date: 2/24/23.
Accession Number: 20230224-5003.
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23-1175-000.
Applicants: Dominion Energy South Carolina, Inc.
Description: Tariff Amendment: Jasper Provisional LGIA Notice of
Cancellation to be effective 2/7/2023.
Filed Date: 2/24/23.
Accession Number: 20230224-5018.
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23-1176-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: First Revised ISA, Service
Agreement No. 6248; QUeue No. AE2-206/AF1-078 to be effective 1/18/
2023.
Filed Date: 2/24/23.
Accession Number: 20230224-5077.
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23-1177-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Rate Schedule No. 217,
Exhibit B.PAD-LIB to be effective 4/28/2023.
Filed Date: 2/24/23.
Accession Number: 20230224-5082.
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23-1178-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Tariff Amendment: Alabama Power Company submits tariff
filing per 35.15: SE Solar II (Fayette Solar) LGIA Termination Filing
to be effective 2/3/2023.
Filed Date: 2/24/23.
Accession Number: 20230224-5093.
Comment Date: 5 p.m. ET 3/17/23.
Docket Numbers: ER23-1179-000.
Applicants: HIKO Energy, LLC.
Description: Notice of Cancellation of Market Based Rate Tariff of
HIKO Energy, LLC.
Filed Date: 2/24/23.
Accession Number: 20230224-5156.
Comment Date: 5 p.m. ET 3/17/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211
[[Page 13114]]
and 214 of the Commission's Regulations (18 CFR 385.211 and 385.214) on
or before 5:00 p.m. Eastern time on the specified comment date.
Protests may be considered, but intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 24, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-04313 Filed 3-1-23; 8:45 am]
BILLING CODE 6717-01-P