Central Nebraska Public Power and Irrigation District; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 12925-12926 [2023-04194]
Download as PDF
Federal Register / Vol. 88, No. 40 / Wednesday, March 1, 2023 / Notices
Department; (2) will this information be
processed and used in a timely manner;
(3) is the estimate of burden accurate;
(4) how might the Department enhance
the quality, utility, and clarity of the
information to be collected; and (5) how
might the Department minimize the
burden of this collection on the
respondents, including through the use
of information technology. Please note
that written comments received in
response to this notice will be
considered public records.
Title of Collection: Loan
Rehabilitation: Reasonable and
Affordable Payments.
OMB Control Number: 1845–0120.
Type of Review: Extension without
change of a currently approved ICR.
Respondents/Affected Public:
Individuals or Households.
Total Estimated Number of Annual
Responses: 139,000.
Total Estimated Number of Annual
Burden Hours: 139,000.
Abstract: Borrowers who have
defaulted on their Direct Loan or FFEL
Program loans may remove those loans
from default through a process called
rehabilitation. Loan rehabilitation
requires the borrower to make 9
payments within 10 months. The
payment amount is set according to one
of two formulas. The second of the two
formulas uses the information that is
collected in this form. The form makes
it easier for borrowers to complete
through simplified language, and easier
for loan holders through a uniform,
common format.
Dated: February 23, 2023.
Kun Mullan,
PRA Coordinator, Strategic Collections and
Clearance Governance and Strategy Division,
Office of Chief Data Officer, Office of
Planning, Evaluation and Policy
Development.
[FR Doc. 2023–04149 Filed 2–28–23; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
ddrumheller on DSK120RN23PROD with NOTICES
[Project No. 1417–278]
Central Nebraska Public Power and
Irrigation District; Notice of Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Revised Land
and Shoreline Management Plan.
VerDate Sep<11>2014
18:10 Feb 28, 2023
Jkt 259001
b. Project No: 1417–278.
c. Date Filed: December 29, 2022.
d. Applicant: Central Nebraska Public
Power and Irrigation District.
e. Name of Project: Kingsley Dam
Hydroelectric Project.
f. Location: The project is located on
the North Platte and Platte Rivers in
Garden, Keith, Lincoln, Dawson, and
Gosper counties, in south-central
Nebraska.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mike Drain,
Central Nebraska Public Power and
Irrigation District, P.O. Box 740,
Holdrege, Nebraska 68949, (308) 995–
8601 or mdrain@cnppid.com.
i. FERC Contact: Jon Cofrancesco,
(202) 502–8951 or Jon.Cofrancesco@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
March 27, 2023.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy. Submissions sent via
the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
numbers P–1417–278.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: Pursuant to
License Article 421, Central Nebraska
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
12925
Public Power and Irrigation District
(Central) filed, for Commission
approval, a revised Land and Shoreline
Management Plan (LSMP) for the
Kingsley Dam Project. The revised
LSMP is a comprehensive plan to
manage the multiple resources and uses
of the project’s shoreline in a manner
that is consistent with license
requirements and project purposes, and
protect environmental resources. The
revised LSMP supersedes and updates
the project’s current LSMP approved by
the Commission in 2014 and was
prepared in consultation with resource
agencies and with input from interested
stakeholders.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE, Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, ‘‘MOTION TO
INTERVENE’’,
‘‘RECOMMENDATIONS’’, or ‘‘TERMS
AND CONDITIONS’’ as applicable; (2)
set forth in the heading the name of the
applicant and the project number of the
E:\FR\FM\01MRN1.SGM
01MRN1
12926
Federal Register / Vol. 88, No. 40 / Wednesday, March 1, 2023 / Notices
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: February 23, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–04194 Filed 2–28–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
ddrumheller on DSK120RN23PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC23–57–000.
Applicants: System Energy Resources,
Inc.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of System Energy
Resources, Inc.
Filed Date: 2/21/23.
Accession Number: 20230221–5395.
Comment Date: 5 p.m. ET 3/14/23.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG23–84–000.
Applicants: McFarland Solar A, LLC.
Description: McFarland Solar A, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 2/23/23.
Accession Number: 20230223–5030.
Comment Date: 5 p.m. ET 3/16/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1982–016;
ER10–1253–015; ER10–1246–017;
ER10–1252–017; ER20–2671–004;
ER23–138–001; ER23–139–001.
Applicants: Pleasant Hill Solar, LLC,
Watlington Solar, LLC, Water Strider
Solar, LLC, Consolidated Edison
Solutions, Inc., Consolidated Edison
Energy, Inc., Orange and Rockland
Utilities, Inc., Consolidated Edison
Company of New York, Inc.
Description: Amendment to December
15, 2022, Triennial Market Power
VerDate Sep<11>2014
18:10 Feb 28, 2023
Jkt 259001
Analysis for Northeast Region of
Consolidated Edison Company of New
York, Inc.
Filed Date: 2/17/23.
Accession Number: 20230217–5239.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER10–1776–004;
ER16–1250–014; ER22–2173–001;
ER10–2824–004; ER10–2825–005;
ER22–2174–001; ER21–2272–002;
ER10–2957–005; ER10–2995–005;
ER10–2996–004; ER10–2999–004;
ER10–3000–004; ER10–3029–004;
ER21–2748–002; ER21–2847–002;
ER19–2360–003; ER10–3009–006;
ER10–3013–005.
Applicants: Star Point Wind Project
LLC, Pebble Springs Wind LLC,
Montague Wind Power Facility, LLC,
Montague Solar, LLC, Lund Hill Solar,
LLC, Bracewell LLP, Leaning Juniper
Wind Power II LLC, Klondike Wind
Power III LLC, Klondike Wind Power II
LLC, Klondike Wind Power LLC,
Klamath Energy LLC, Juniper Canyon
Wind Power LLC, Hay Canyon Wind
LLC, Golden Hills Wind Farm, LLC,
Daybreak Solar, LLC, Big Horn II Wind
Project LLC, Big Horn Wind Project
LLC, Bakeoven Solar, LLC, Avangrid
Renewables, LLC.
Description: Supplement to November
8, 2022, Notice of Change in Status of
Leaning Juniper Wind Power II LLC.
Filed Date: 2/21/23.
Accession Number: 20230221–5393.
Comment Date: 5 p.m. ET 3/14/23.
Docket Numbers: ER22–2933–002.
Applicants: Nevada Power Company.
Description: Compliance filing:
Compliance Filing Docket ER22–2933 to
be effective 12/1/2022.
Filed Date: 2/23/23.
Accession Number: 20230223–5109.
Comment Date: 5 p.m. ET 3/16/23.
Docket Numbers: ER23–1154–000.
Applicants: Arkansas Electric
Cooperative Corporation.
Description: Request for One-Time
Limited Waiver of Arkansas Electric
Cooperative Corporation, et al.
Filed Date: 2/21/23.
Accession Number: 20230221–5378.
Comment Date: 5 p.m. ET 3/3/23.
Docket Numbers: ER23–1164–000.
Applicants: System Energy Resources,
Inc.
Description: Compliance filing: SERI
UPSA Compliance (EL18–152 and
ER23–816) to be effective 1/1/2023.
Filed Date: 2/22/23.
Accession Number: 20230222–5182.
Comment Date: 5 p.m. ET 3/15/23.
Docket Numbers: ER23–1165–000.
Applicants: Database returns error.
There is a problem with archive data
and system. Contact Administrator.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
Description: Baseline eTariff Filing:
McFarland Solar A, LLC MBR Tariff to
be effective 4/1/2023.
Filed Date: 2/23/23.
Accession Number: 20230223–5001.
Comment Date: 5 p.m. ET 3/16/23.
Docket Numbers: ER23–1166–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3596
Tenaska Clear Creek Wind Facilities
Constr. Agr Cancel to be effective 8/13/
2021.
Filed Date: 2/23/23.
Accession Number: 20230223–5034.
Comment Date: 5 p.m. ET 3/16/23.
Docket Numbers: ER23–1167–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original NSA, SA No. 6804; Queue No.
AC2–090 to be effective 1/24/2023.
Filed Date: 2/23/23.
Accession Number: 20230223–5061.
Comment Date: 5 p.m. ET 3/16/23.
Docket Numbers: ER23–1168–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing:
NYISO 205 Filing: Amended
Development Agreement between
NYISO, NYTransco SA 2510 to be
effective 1/19/2023.
Filed Date: 2/23/23.
Accession Number: 20230223–5064.
Comment Date: 5 p.m. ET 3/16/23.
Docket Numbers: ER23–1169–000.
Applicants: Basin Electric Power
Cooperative.
Description: Initial rate filing: Basin
Electric, Baseline Submission of Service
Agreement No. 118 with NPPD to be
effective 7/10/2020.
Filed Date: 2/23/23.
Accession Number: 20230223–5068.
Comment Date: 5 p.m. ET 3/16/23.
Docket Numbers: ER23–1170–000.
Applicants: Basin Electric Power
Cooperative.
Description: § 205(d) Rate Filing:
Basin Electric, Submission of Amended
Service Agreement No. 118 with NPPD
to be effective 1/31/2023.
Filed Date: 2/23/23.
Accession Number: 20230223–5077.
Comment Date: 5 p.m. ET 3/16/23.
Docket Numbers: ER23–1171–000.
Applicants: MD Solar 2, LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 3/1/2023.
Filed Date: 2/23/23.
Accession Number: 20230223–5082.
Comment Date: 5 p.m. ET 3/16/23
Docket Numbers: ER23–1172–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
E:\FR\FM\01MRN1.SGM
01MRN1
Agencies
[Federal Register Volume 88, Number 40 (Wednesday, March 1, 2023)]
[Notices]
[Pages 12925-12926]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-04194]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1417-278]
Central Nebraska Public Power and Irrigation District; Notice of
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Revised Land and Shoreline Management Plan.
b. Project No: 1417-278.
c. Date Filed: December 29, 2022.
d. Applicant: Central Nebraska Public Power and Irrigation
District.
e. Name of Project: Kingsley Dam Hydroelectric Project.
f. Location: The project is located on the North Platte and Platte
Rivers in Garden, Keith, Lincoln, Dawson, and Gosper counties, in
south-central Nebraska.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mike Drain, Central Nebraska Public Power and
Irrigation District, P.O. Box 740, Holdrege, Nebraska 68949, (308) 995-
8601 or [email protected].
i. FERC Contact: Jon Cofrancesco, (202) 502-8951 or
[email protected].
j. Deadline for filing comments, motions to intervene, and
protests: March 27, 2023.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include docket numbers P-1417-278.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: Pursuant to License Article 421, Central
Nebraska Public Power and Irrigation District (Central) filed, for
Commission approval, a revised Land and Shoreline Management Plan
(LSMP) for the Kingsley Dam Project. The revised LSMP is a
comprehensive plan to manage the multiple resources and uses of the
project's shoreline in a manner that is consistent with license
requirements and project purposes, and protect environmental resources.
The revised LSMP supersedes and updates the project's current LSMP
approved by the Commission in 2014 and was prepared in consultation
with resource agencies and with input from interested stakeholders.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE, Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's website at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', ``MOTION TO
INTERVENE'', ``RECOMMENDATIONS'', or ``TERMS AND CONDITIONS'' as
applicable; (2) set forth in the heading the name of the applicant and
the project number of the
[[Page 12926]]
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person commenting, protesting or
intervening; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. All comments, motions to intervene, or
protests must set forth their evidentiary basis. Any filing made by an
intervenor must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 385.2010.
Dated: February 23, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-04194 Filed 2-28-23; 8:45 am]