Notice of Institution of Section 206 Proceeding and Refund Effective Date, 12672-12673 [2023-04113]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES
12672
Federal Register / Vol. 88, No. 39 / Tuesday, February 28, 2023 / Notices
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–2000–089. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
applicant proposes to amend their 2004
Shoreline Stabilization Plan (Original
Plan) such that, in part, Whitehouse Bay
(site 12) becomes the final stabilization
site. No further work will be performed
on the sites identified in the Original
Plan, and the licensee will have met its
obligations under the Shoreline
Stabilization Program section of Article
401. The licensee states that after the
approval of the Original Plan, agencies
found that erosion in areas not adjacent
to human occupation is natural, and so
denied authorization to perform
shoreline stabilization on some sites.
The licensee completed stabilization for
sites 10, 13–19, 21–26, 33, and 1D; and
cancelled stabilization for sites 11, 20,
27–32, 34–36, 2D, 3D, and 25D.
The licensee will fund the
continuation of the Adjoining
Landowner Stabilization Program
(ALSP) using the balance of $1.75
million, minus the costs of completing
stabilization of site 12. This money may
be expended on ALSP sites without
VerDate Sep<11>2014
18:37 Feb 27, 2023
Jkt 259001
restriction to timing. These funds will
cover design, permitting, construction,
and construction management costs of
ALSP sites that are implemented by the
licensee. There will be no restrictions
on ALSP projects in terms of estimated
cost or length or any other such
restriction. The licensee will continue to
perform ALSP work until the balance of
the $1.75 million is expended.
Thereafter, the licensee’s obligation to
fund the ALSP expires.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: February 21, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–04007 Filed 2–27–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Institution of Section 206
Proceeding and Refund Effective Date
Docket Nos.
Flemington Solar, LLC .............
Frenchtown I Solar, LLC ..........
Frenchtown II Solar, LLC .........
Frenchtown III Solar, LLC ........
Lakehurst Solar, LLC ...............
PA Solar Park, LLC ..................
Pilesgrove Solar, LLC ..............
PA Solar Park II, LLC ...............
EL23–32–000
EL23–33–000
EL23–34–000
EL23–35–000
EL23–36–000
EL23–37–000
EL23–38–000
EL23–39–000
On February 21, 2023, the
Commission issued an order in Docket
Nos. EL23–32–000, EL23–33–000,
EL23–34–000, EL23–35–000, EL23–36–
000, EL23–37–000, EL23–38–000, and
EL23–39–000, pursuant to section 206
of the Federal Power Act (FPA), 16
U.S.C. 824e, instituting an investigation
into whether Flemington Solar, LLC,
Frenchtown I Solar, LLC, Frenchtown II
Solar, LLC, Frenchtown III Solar, LLC,
Lakehurst Solar, LLC, PA Solar Park,
LLC, Pilesgrove Solar, LLC, and PA
Solar Park II, LLC’s Rate Schedules
remain just and reasonable. Flemington
Solar, LLC, 182 FERC ¶ 61,110 (2023).
The refund effective date in Docket
Nos. EL23–32–000, EL23–33–000,
EL23–34–000, EL23–35–000, EL23–36–
000, EL23–37–000, EL23–38–000, and
EL23–39–000, established pursuant to
section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket Nos. EL23–32–000,
EL23–33–000, EL23–34–000, EL23–35–
000, EL23–36–000, EL23–37–000, EL23–
38–000, and EL23–39–000 must file a
notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2021),
within 21 days of the date of issuance
of the order.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
E:\FR\FM\28FEN1.SGM
28FEN1
Federal Register / Vol. 88, No. 39 / Tuesday, February 28, 2023 / Notices
document via the internet through the
Commission’s Home Page https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
In lieu of electronic filing, you may
submit a paper copy. Submissions sent
via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Dated: February 22, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–04113 Filed 2–27–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
ddrumheller on DSK120RN23PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–2635–001.
Applicants: Hecate Energy Johanna
Facility LLC.
Description: Notice of Change in
Status of Hecate Energy Johanna Facility
LLC.
Filed Date: 2/17/23.
Accession Number: 20230217–5236.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER22–1205–002.
Applicants: Evergy Kansas Central,
Inc.
Description: Compliance Filing to
December 21, 2022 Order of Evergy
Kansas Central, Inc.
Filed Date: 2/17/23.
Accession Number: 20230217–5237.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–510–001.
VerDate Sep<11>2014
18:37 Feb 27, 2023
Jkt 259001
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2023–02–21_SA 3740 Deficiency
Response for J1421 1st Rev GIA (J1421)
to be effective 1/30/2023.
Filed Date: 2/21/23.
Accession Number: 20230221–5304.
Comment Date: 5 p.m. ET 3/14/23.
Docket Numbers: ER23–1141–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
6799; Queue No. AD1–013 to be
effective 1/20/2023.
Filed Date: 2/21/23.
Accession Number: 20230221–5103.
Comment Date: 5 p.m. ET 3/14/23.
Docket Numbers: ER23–1142–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
6802; Queue No. AE2–214 to be
effective 1/20/2023.
Filed Date: 2/21/23.
Accession Number: 20230221–5136.
Comment Date: 5 p.m. ET 3/14/23.
Docket Numbers: ER23–1143–000.
Applicants: Narragansett Electric
Company.
Description: The Narragansett Electric
Company submits Notice of
Cancellation of the Interconnection
Agreement with Northeast Energy
Associates Bellingham Facility.
Filed Date: 2/14/23.
Accession Number: 20230214–5206.
Comment Date: 5 p.m. ET 3/7/23.
Docket Numbers: ER23–1144–000.
Applicants: Southwestern Public
Service Company.
Description: § 205(d) Rate Filing:
LP&L Settlement Filing to be effective 4/
23/2023.
Filed Date: 2/21/23.
Accession Number: 20230221–5189.
Comment Date: 5 p.m. ET 3/14/23.
Docket Numbers: ER23–1145–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, SA No. 6307 and
ICSA, SA No. 6308; Queue No. AD2–
093 to be effective 4/24/2023.
Filed Date: 2/21/23.
Accession Number: 20230221–5219.
Comment Date: 5 p.m. ET 3/14/23.
Docket Numbers: ER23–1146–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
Navajo Tribal Utility Authority—NITSA
Rev 1 to be effective 2/15/2023.
Filed Date: 2/21/23.
Accession Number: 20230221–5234.
Comment Date: 5 p.m. ET 3/14/23.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
12673
Docket Numbers: ER23–1147–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2023–02–21_SA 3371 SIGE-Crescent
City Solar 1st Rev GIA (J856) to be
effective 2/10/2023.
Filed Date: 2/21/23.
Accession Number: 20230221–5253.
Comment Date: 5 p.m. ET 3/14/23.
Docket Numbers: ER23–1148–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA/CSA, Service Agreement
Nos. 6683/6684; Queue No. AD2–096 to
be effective 1/20/2023.
Filed Date: 2/21/23.
Accession Number: 20230221–5259.
Comment Date: 5 p.m. ET 3/14/23.
Docket Numbers: ER23–1149–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original NSA, SA No. 6796; Queue No.
AA1–034 to be effective 1/19/2023.
Filed Date: 2/21/23.
Accession Number: 20230221–5261.
Comment Date: 5 p.m. ET 3/14/23.
Docket Numbers: ER23–1150–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA/CSA, Service Agreement
Nos. 6681/6682; Queue No. AD2–092 to
be effective 12/31/9998.
Filed Date: 2/21/23.
Accession Number: 20230221–5264.
Comment Date: 5 p.m. ET 3/14/23.
Docket Numbers: ER23–1151–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing:
NYISO 205 filing of revisions re:
responsibilities for NUFs to be effective
4/23/2023.
Filed Date: 2/21/23.
Accession Number: 20230221–5278.
Comment Date: 5 p.m. ET 3/14/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
E:\FR\FM\28FEN1.SGM
28FEN1
Agencies
[Federal Register Volume 88, Number 39 (Tuesday, February 28, 2023)]
[Notices]
[Pages 12672-12673]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-04113]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Institution of Section 206 Proceeding and Refund
Effective Date
------------------------------------------------------------------------
Docket Nos.
------------------------------------------------------------------------
Flemington Solar, LLC.................. EL23-32-000
Frenchtown I Solar, LLC................ EL23-33-000
Frenchtown II Solar, LLC............... EL23-34-000
Frenchtown III Solar, LLC.............. EL23-35-000
Lakehurst Solar, LLC................... EL23-36-000
PA Solar Park, LLC..................... EL23-37-000
Pilesgrove Solar, LLC.................. EL23-38-000
PA Solar Park II, LLC.................. EL23-39-000
------------------------------------------------------------------------
On February 21, 2023, the Commission issued an order in Docket Nos.
EL23-32-000, EL23-33-000, EL23-34-000, EL23-35-000, EL23-36-000, EL23-
37-000, EL23-38-000, and EL23-39-000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C. 824e, instituting an investigation
into whether Flemington Solar, LLC, Frenchtown I Solar, LLC, Frenchtown
II Solar, LLC, Frenchtown III Solar, LLC, Lakehurst Solar, LLC, PA
Solar Park, LLC, Pilesgrove Solar, LLC, and PA Solar Park II, LLC's
Rate Schedules remain just and reasonable. Flemington Solar, LLC, 182
FERC ] 61,110 (2023).
The refund effective date in Docket Nos. EL23-32-000, EL23-33-000,
EL23-34-000, EL23-35-000, EL23-36-000, EL23-37-000, EL23-38-000, and
EL23-39-000, established pursuant to section 206(b) of the FPA, will be
the date of publication of this notice in the Federal Register.
Any interested person desiring to be heard in Docket Nos. EL23-32-
000, EL23-33-000, EL23-34-000, EL23-35-000, EL23-36-000, EL23-37-000,
EL23-38-000, and EL23-39-000 must file a notice of intervention or
motion to intervene, as appropriate, with the Federal Energy Regulatory
Commission, in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure, 18 CFR 385.214 (2021), within 21 days of the
date of issuance of the order.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this
[[Page 12673]]
document via the internet through the Commission's Home Page https://www.ferc.gov) using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. At this time, the Commission has suspended access to the
Commission's Public Reference Room, due to the proclamation declaring a
National Emergency concerning the Novel Coronavirus Disease (COVID-19),
issued by the President on March 13, 2020. For assistance, contact FERC
at [email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFile'' link at
https://www.ferc.gov. In lieu of electronic filing, you may submit a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
Dated: February 22, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-04113 Filed 2-27-23; 8:45 am]