Download as PDF Federal Register / Vol. 88, No. 39 / Tuesday, February 28, 2023 / Notices document via the internet through the Commission’s Home Page https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFile’’ link at https://www.ferc.gov. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Dated: February 22, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–04113 Filed 2–27–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission ddrumheller on DSK120RN23PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER21–2635–001. Applicants: Hecate Energy Johanna Facility LLC. Description: Notice of Change in Status of Hecate Energy Johanna Facility LLC. Filed Date: 2/17/23. Accession Number: 20230217–5236. Comment Date: 5 p.m. ET 3/10/23. Docket Numbers: ER22–1205–002. Applicants: Evergy Kansas Central, Inc. Description: Compliance Filing to December 21, 2022 Order of Evergy Kansas Central, Inc. Filed Date: 2/17/23. Accession Number: 20230217–5237. Comment Date: 5 p.m. ET 3/10/23. Docket Numbers: ER23–510–001. VerDate Sep<11>2014 18:37 Feb 27, 2023 Jkt 259001 Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2023–02–21_SA 3740 Deficiency Response for J1421 1st Rev GIA (J1421) to be effective 1/30/2023. Filed Date: 2/21/23. Accession Number: 20230221–5304. Comment Date: 5 p.m. ET 3/14/23. Docket Numbers: ER23–1141–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 6799; Queue No. AD1–013 to be effective 1/20/2023. Filed Date: 2/21/23. Accession Number: 20230221–5103. Comment Date: 5 p.m. ET 3/14/23. Docket Numbers: ER23–1142–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 6802; Queue No. AE2–214 to be effective 1/20/2023. Filed Date: 2/21/23. Accession Number: 20230221–5136. Comment Date: 5 p.m. ET 3/14/23. Docket Numbers: ER23–1143–000. Applicants: Narragansett Electric Company. Description: The Narragansett Electric Company submits Notice of Cancellation of the Interconnection Agreement with Northeast Energy Associates Bellingham Facility. Filed Date: 2/14/23. Accession Number: 20230214–5206. Comment Date: 5 p.m. ET 3/7/23. Docket Numbers: ER23–1144–000. Applicants: Southwestern Public Service Company. Description: § 205(d) Rate Filing: LP&L Settlement Filing to be effective 4/ 23/2023. Filed Date: 2/21/23. Accession Number: 20230221–5189. Comment Date: 5 p.m. ET 3/14/23. Docket Numbers: ER23–1145–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, SA No. 6307 and ICSA, SA No. 6308; Queue No. AD2– 093 to be effective 4/24/2023. Filed Date: 2/21/23. Accession Number: 20230221–5219. Comment Date: 5 p.m. ET 3/14/23. Docket Numbers: ER23–1146–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: Navajo Tribal Utility Authority—NITSA Rev 1 to be effective 2/15/2023. Filed Date: 2/21/23. Accession Number: 20230221–5234. Comment Date: 5 p.m. ET 3/14/23. PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 12673 Docket Numbers: ER23–1147–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2023–02–21_SA 3371 SIGE-Crescent City Solar 1st Rev GIA (J856) to be effective 2/10/2023. Filed Date: 2/21/23. Accession Number: 20230221–5253. Comment Date: 5 p.m. ET 3/14/23. Docket Numbers: ER23–1148–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA/CSA, Service Agreement Nos. 6683/6684; Queue No. AD2–096 to be effective 1/20/2023. Filed Date: 2/21/23. Accession Number: 20230221–5259. Comment Date: 5 p.m. ET 3/14/23. Docket Numbers: ER23–1149–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original NSA, SA No. 6796; Queue No. AA1–034 to be effective 1/19/2023. Filed Date: 2/21/23. Accession Number: 20230221–5261. Comment Date: 5 p.m. ET 3/14/23. Docket Numbers: ER23–1150–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA/CSA, Service Agreement Nos. 6681/6682; Queue No. AD2–092 to be effective 12/31/9998. Filed Date: 2/21/23. Accession Number: 20230221–5264. Comment Date: 5 p.m. ET 3/14/23. Docket Numbers: ER23–1151–000. Applicants: New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: NYISO 205 filing of revisions re: responsibilities for NUFs to be effective 4/23/2023. Filed Date: 2/21/23. Accession Number: 20230221–5278. Comment Date: 5 p.m. ET 3/14/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings E:\FR\FM\28FEN1.SGM 28FEN1 12674 Federal Register / Vol. 88, No. 39 / Tuesday, February 28, 2023 / Notices can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 21, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–04023 Filed 2–27–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–59–000] ddrumheller on DSK120RN23PROD with NOTICES Colorado Interstate Gas Company, L.L.C.; Wyoming Interstate Company, L.L.C.; Notice of Application and Establishing Intervention Deadline Take notice that on February 15, 2023, Colorado Interstate Gas Company, L.L.C. (CIG) and Wyoming Interstate Company, L.L.C. (WIC), Post Office Box 1087, Colorado Springs, Colorado 80944, filed a joint application in Docket No. CP23– 59–000, pursuant to section 7(c) of the Natural Gas Act (NGA), to reduce the maximum allowable operating pressure (MAOP) of its Powder River Lateral, and to the extent necessary, to partially abandon the Powder River Lateral (Lateral) to accommodate the decrease in the Lateral’s capabilities to provide transportation as a result of the decrease in the MAOP. Concurrently, CIG and WIC are jointly requesting, pursuant to section 7(b) of the NGA, the termination of the CIG/WIC Capacity Lease Agreement currently in effect which provides capacity on Line No. 72A to WIC and capacity through the Laramie Jumper Compressor unit to CIG, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call VerDate Sep<11>2014 18:37 Feb 27, 2023 Jkt 259001 toll-free, (886) 208–3676 or TTY, (202) 502–8659. Any questions regarding this prior notice request should be directed to Francisco Tarin, Director, Regulatory, Colorado Interstate Gas Company, L.L.C. and Wyoming Interstate Company, L.L.C, P.O. Box 1087, Colorado Springs, Colorado 80944; by telephone at (719) 667–7517; or by email at CIGregulatoryaffairs@ kindermorgan.com, or David Cain, Assistant General Counsel, Colorado Interstate Gas Company, L.L.C. and Wyoming Interstate Company, L.L.C., P.O. Box 1087, Colorado Springs, Colorado 80944; by telephone at (713) 520–4534; or by email at David_Cain@ kindermorgan.com. Pursuant to Section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on March 15, 2023. How to file protests, motions to intervene, and comments is explained below. CFR (Code of Federal Regulations) 157.9. Frm 00028 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 4 18 CFR 157.205(e). 5 18 CFR 385.214. 6 18 CFR 157.10. 3 Persons Pursuant to section 157.205 of the Commission’s regulations under the PO 00000 Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 5 and the regulations under the NGA 6 by the intervention deadline for the project, which is March 15, 2023. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the 2 18 Protests 1 18 NGA,2 any person 3 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,4 and must be submitted by the protest deadline, which is March 15, 2023. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Fmt 4703 Sfmt 4703 E:\FR\FM\28FEN1.SGM 28FEN1

Agencies

[Federal Register Volume 88, Number 39 (Tuesday, February 28, 2023)]
[Notices]
[Pages 12673-12674]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-04023]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER21-2635-001.
    Applicants: Hecate Energy Johanna Facility LLC.
    Description: Notice of Change in Status of Hecate Energy Johanna 
Facility LLC.
    Filed Date: 2/17/23.
    Accession Number: 20230217-5236.
    Comment Date: 5 p.m. ET 3/10/23.

    Docket Numbers: ER22-1205-002.
    Applicants: Evergy Kansas Central, Inc.
    Description: Compliance Filing to December 21, 2022 Order of Evergy 
Kansas Central, Inc.
    Filed Date: 2/17/23.
    Accession Number: 20230217-5237.
    Comment Date: 5 p.m. ET 3/10/23.

    Docket Numbers: ER23-510-001.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Tariff Amendment: 2023-02-21_SA 3740 Deficiency 
Response for J1421 1st Rev GIA (J1421) to be effective 1/30/2023.
    Filed Date: 2/21/23.
    Accession Number: 20230221-5304.
    Comment Date: 5 p.m. ET 3/14/23.

    Docket Numbers: ER23-1141-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, Service 
Agreement No. 6799; Queue No. AD1-013 to be effective 1/20/2023.
    Filed Date: 2/21/23.
    Accession Number: 20230221-5103.
    Comment Date: 5 p.m. ET 3/14/23.

    Docket Numbers: ER23-1142-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, Service 
Agreement No. 6802; Queue No. AE2-214 to be effective 1/20/2023.
    Filed Date: 2/21/23.
    Accession Number: 20230221-5136.
    Comment Date: 5 p.m. ET 3/14/23.

    Docket Numbers: ER23-1143-000.
    Applicants: Narragansett Electric Company.
    Description: The Narragansett Electric Company submits Notice of 
Cancellation of the Interconnection Agreement with Northeast Energy 
Associates Bellingham Facility.
    Filed Date: 2/14/23.
    Accession Number: 20230214-5206.
    Comment Date: 5 p.m. ET 3/7/23.

    Docket Numbers: ER23-1144-000.
    Applicants: Southwestern Public Service Company.
    Description: Sec.  205(d) Rate Filing: LP&L Settlement Filing to be 
effective 4/23/2023.
    Filed Date: 2/21/23.
    Accession Number: 20230221-5189.
    Comment Date: 5 p.m. ET 3/14/23.

    Docket Numbers: ER23-1145-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to ISA, SA No. 
6307 and ICSA, SA No. 6308; Queue No. AD2-093 to be effective 4/24/
2023.
    Filed Date: 2/21/23.
    Accession Number: 20230221-5219.
    Comment Date: 5 p.m. ET 3/14/23.

    Docket Numbers: ER23-1146-000.
    Applicants: PacifiCorp.
    Description: Sec.  205(d) Rate Filing: Navajo Tribal Utility 
Authority--NITSA Rev 1 to be effective 2/15/2023.
    Filed Date: 2/21/23.
    Accession Number: 20230221-5234.
    Comment Date: 5 p.m. ET 3/14/23.

    Docket Numbers: ER23-1147-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2023-02-21_SA 3371 SIGE-
Crescent City Solar 1st Rev GIA (J856) to be effective 2/10/2023.
    Filed Date: 2/21/23.
    Accession Number: 20230221-5253.
    Comment Date: 5 p.m. ET 3/14/23.

    Docket Numbers: ER23-1148-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA/CSA, Service 
Agreement Nos. 6683/6684; Queue No. AD2-096 to be effective 1/20/2023.
    Filed Date: 2/21/23.
    Accession Number: 20230221-5259.
    Comment Date: 5 p.m. ET 3/14/23.

    Docket Numbers: ER23-1149-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original NSA, SA No. 6796; 
Queue No. AA1-034 to be effective 1/19/2023.
    Filed Date: 2/21/23.
    Accession Number: 20230221-5261.
    Comment Date: 5 p.m. ET 3/14/23.

    Docket Numbers: ER23-1150-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA/CSA, Service 
Agreement Nos. 6681/6682; Queue No. AD2-092 to be effective 12/31/9998.
    Filed Date: 2/21/23.
    Accession Number: 20230221-5264.
    Comment Date: 5 p.m. ET 3/14/23.

    Docket Numbers: ER23-1151-000.
    Applicants: New York Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: NYISO 205 filing of 
revisions re: responsibilities for NUFs to be effective 4/23/2023.
    Filed Date: 2/21/23.
    Accession Number: 20230221-5278.
    Comment Date: 5 p.m. ET 3/14/23.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings

[[Page 12674]]

can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: February 21, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-04023 Filed 2-27-23; 8:45 am]