Combined Notice of Filings #1, 11907-11909 [2023-03872]
Download as PDF
Federal Register / Vol. 88, No. 37 / Friday, February 24, 2023 / Notices
Commission has suspended access to
the Commission’s Public Reference
Room due to the proclamation declaring
a National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll free, (886) 208–3676 or TTY (202)
502–8659.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must: (1) bear in all capital
letters the title ‘‘PROTEST,’’ ‘‘MOTION
TO INTERVENE,’’ ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions, or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed on the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. The applicant must file no later
than 60 days following the date of
issuance of this notice: (1) a copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification. Please note that the
certification request must comply with
40 CFR 121.5(b), including
documentation that a pre-filing meeting
request was submitted to the certifying
authority at least 30 days prior to
submitting the certification request.
Please also note that the certification
request must be sent to the certifying
authority and to the Commission
concurrently.
p. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
Milestone
Target date
Deadline for filing interventions, protests, comments, recommendations, preliminary terms and conditions, and preliminary
fishway prescriptions.
Deadline for filing reply comments ...................................................................................................................................................
q. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
Dated: February 17, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–03838 Filed 2–23–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
ddrumheller on DSK120RN23PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–2004–003.
Applicants: Public Service Electric
and Gas Company, PJM Interconnection,
L.L.C.
Description: Compliance filing: Public
Service Electric and Gas Company
submits tariff filing per 35: PSEG
submits Revisions to PJM Tariff, Att. H–
10 re: Order 864 to be effective 1/27/
2020.
VerDate Sep<11>2014
18:15 Feb 23, 2023
Jkt 259001
Filed Date: 2/17/23.
Accession Number: 20230217–5132.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER21–201–002.
Applicants: Atlantic City Electric
Company, PJM Interconnection, L.L.C.
Description: Compliance filing:
Atlantic City Electric Company submits
tariff filing per 35: ACE Supplemental
Compliance Filing in ER21–201 to be
effective N/A.
Filed Date: 2/17/23.
Accession Number: 20230217–5017.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER21–203–002.
Applicants: Baltimore Gas and
Electric Company, PJM Interconnection,
L.L.C.
Description: Compliance filing:
Baltimore Gas and Electric Company
submits tariff filing per 35: BGE
Supplemental Compliance Filing in
ER21–203 to be effective N/A.
Filed Date: 2/17/23.
Accession Number: 20230217–5020.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER21–204–002.
Applicants: Commonwealth Edison
Company, PJM Interconnection, L.L.C.
Description: Compliance filing:
Commonwealth Edison Company
PO 00000
Frm 00020
Fmt 4703
11907
Sfmt 4703
April 2023.
June 2023.
submits tariff filing per 35: ComEd
Supplemental Compliance Filing in
ER21–204 to be effective N/A.
Filed Date: 2/17/23.
Accession Number: 20230217–5021.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER21–205–002.
Applicants: Delmarva Power & Light
Company, PJM Interconnection, L.L.C.
Description: Compliance filing:
Delmarva Power & Light Company
submits tariff filing per 35: Delmarva
Power & Light Supplemental
Compliance Filing in ER21–205 to be
effective N/A.
Filed Date: 2/17/23.
Accession Number: 20230217–5063.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER21–206–002.
Applicants: Potomac Electric Power
Company, PJM Interconnection, L.L.C.
Description: Compliance filing:
Potomac Electric Power Company
submits tariff filing per 35: PEPCO
Supplemental Compliance Filing in
ER21–206 to be effective N/A.
Filed Date: 2/17/23.
Accession Number: 20230217–5065.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER21–209–002.
E:\FR\FM\24FEN1.SGM
24FEN1
ddrumheller on DSK120RN23PROD with NOTICES
11908
Federal Register / Vol. 88, No. 37 / Friday, February 24, 2023 / Notices
Applicants: PECO Energy Company,
PJM Interconnection, L.L.C.
Description: Compliance filing: PECO
Energy Company submits tariff filing
per 35: PECO Supplemental Compliance
Filing in ER21–209 to be effective N/A.
Filed Date: 2/17/23.
Accession Number: 20230217–5068.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–155–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment: 4028
Pixley Solar Energy & ITCGP FSADeficiency Response to be effective 12/
20/2022.
Filed Date: 2/17/23.
Accession Number: 20230217–5099.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–342–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
4029SO Panhandle Solar & SPS FSADeficiency Response to be effective 4/
19/2023.
Filed Date: 2/17/23.
Accession Number: 20230217–5104.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–673–001.
Applicants: BHE Glacier Wind 1, LLC.
Description: Tariff Amendment:
Amendment to MBR Tariff Revisions to
be effective 11/9/2022.
Filed Date: 2/17/23.
Accession Number: 20230217–5055.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–674–001.
Applicants: BHE Wind Watch, LLC.
Description: Tariff Amendment:
Amendment to MBR Tariff Revisions to
be effective 11/9/2022.
Filed Date: 2/17/23.
Accession Number: 20230217–5062.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER23–675–001.
Applicants: BHE Rim Rock Wind,
LLC.
Description: Tariff Amendment:
Amendment to MBR Tariff Revisions to
be effective 11/9/2022.
Filed Date: 2/17/23.
Accession Number: 20230217–5061.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–676–001.
Applicants: BHE Power Watch, LLC.
Description: Tariff Amendment:
Amendment to MBR Tariff Revisions to
be effective 11/9/2022.
Filed Date: 2/17/23.
Accession Number: 20230217–5060.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–677–001.
Applicants: BHE Glacier Wind 2, LLC.
Description: Tariff Amendment:
Amendment to MBR Tariff Revisions to
be effective 11/9/2022.
VerDate Sep<11>2014
18:15 Feb 23, 2023
Jkt 259001
Filed Date: 2/17/23.
Accession Number: 20230217–5059.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–791–000;
ER23–792–000.
Applicants: Consolidated Edison
Solutions, Inc., Consolidated Edison
Energy, Inc.
Description: Supplement to January 9,
2023 Consolidated Edison Energy, Inc.,
et al.
Filed Date: 2/10/23.
Accession Number: 20230210–5236.
Comment Date: 5 p.m. ET 2/21/23.
Docket Numbers: ER23–1131–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA SA No. 6785 and
Cancellation of IISA SA No. 6184;
Queue No. AE2–148 to be effective 1/
18/2023.
Filed Date: 2/17/23.
Accession Number: 20230217–5013.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–1132–000.
Applicants: Pacific Gas and Electric
Company.
Description: Notice of Termination of
Service Agreement No. 34 of Pacific Gas
and Electric Company.
Filed Date: 2/16/23.
Accession Number: 20230216–5239.
Comment Date: 5 p.m. ET 3/9/23.
Docket Numbers: ER23–1133–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Illinois Company.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2023–02–17_SA 3028
Ameren IL-Prairie Power-EIEC
Project#38 Papineau to be effective 4/
19/2023.
Filed Date: 2/17/23.
Accession Number: 20230217–5031.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–1134–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: 1st
Amend GIA & DSA, Goleta ES,
WDT1454–1454EXP + Terminate eTariff record to be effective 4/19/2023.
Filed Date: 2/17/23.
Accession Number: 20230217–5072.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–1135–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
Lehi—Interconnection Agrmt for POD’s
Rev 1 to be effective 4/19/2023.
Filed Date: 2/17/23.
Accession Number: 20230217–5073.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–1136–000.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Shy Place Solar
Park (Solar & Battery) LGIA Filing to be
effective 2/3/2023.
Filed Date: 2/17/23.
Accession Number: 20230217–5077.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–1137–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PacifiCorp Exchange Agreement—NOC
[Refile] to be effective 10/31/2022.
Filed Date: 2/17/23.
Accession Number: 20230217–5107.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–1138–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to the Review of Maintenance
Adders and Operating Costs to be
effective 4/19/2023.
Filed Date: 2/17/23.
Accession Number: 20230217–5108.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–1139–000.
Applicants: Macquarie Energy LLC.
Description: Compliance filing: refund
report Feb 2023 to be effective N/A.
Filed Date: 2/17/23.
Accession Number: 20230217–5154.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23–1140–000.
Applicants: Entergy Services, LLC,
Entergy Arkansas, LLC, Entergy
Mississippi, LLC.
Description: Request for Limited
Waiver, et al. of Entergy Services, LLC.
Filed Date: 2/17/23.
Accession Number: 20230217–5174.
Comment Date: 5 p.m. ET 3/10/23.
Take notice that the Commission
received the following PURPA
210(m)(3) filings:
Docket Numbers: QM23–3–000.
Applicants: Great River Energy.
Description: Application of Great
River Energy to Terminate its
Mandatory Purchase Obligation under
the Public Utility Regulatory Policies
Act of 1978.
Filed Date: 2/16/23.
Accession Number: 20230216–5206.
Comment Date: 5 p.m. ET 3/16/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
E:\FR\FM\24FEN1.SGM
24FEN1
Federal Register / Vol. 88, No. 37 / Friday, February 24, 2023 / Notices
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 17, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–03872 Filed 2–23–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–15–000]
ddrumheller on DSK120RN23PROD with NOTICES
Texas Eastern Transmission, LP;
Notice of Availability of the Final
Environmental Impact Statement for
the Proposed Venice Extension Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a final
environmental impact statement (EIS)
for the Venice Extension Project,
proposed by Texas Eastern
Transmission, LP (Texas Eastern) in the
above-referenced docket. Texas Eastern
requests authorization to provide firm
natural gas transportation service for up
to 1,260,000 dekatherms per day on its
existing Line 40 to an interconnection
with a pipeline lateral to be constructed,
owned, and operated by Venture Global
Gator Express, LLC, with ultimate
delivery to Venture Global Plaquemines
LNG, LLC Liquified Natural Gas (LNG)
Terminal, which is currently under
development in Plaquemines Parish,
Louisiana.
The final EIS assesses the potential
environmental effects of the
construction and operation of the
Venice Extension Project in accordance
with the requirements of the National
Environmental Policy Act. With the
exception of climate change impacts,
FERC staff concludes that approval of
the proposed project, with the
mitigation measures recommended in
the EIS, would not result in significant
environmental impacts. Climate change
impacts are not characterized in the EIS
as significant or less than significant
because the Commission is conducting
VerDate Sep<11>2014
18:15 Feb 23, 2023
Jkt 259001
a generic proceeding to determine
whether and how the Commission will
conduct climate change significance
determinations going forward.
The final EIS addresses the potential
environmental effects of: the (i)
construction and operation of an
approximately 3.0-mile-long, 36-inchdiameter pipeline segment on Texas
Eastern’s Line 40 in Pointe Coupee
Parish; (ii) abandonment in place of a
2.2-mile-long, 36-inch-diameter existing
pipeline segment on Line 40 in Pointe
Coupee Parish; (iii) construction of a
new proposed 31,900 horsepower (hp)
compressor station (New Roads
Compressor Station) and metering and
regulating (M&R) facilities in Pointe
Coupee Parish; (iv) abandonment in
place of an existing, inactive 19,800 hp
compressor unit at Texas Eastern’s
existing White Castle Compressor
Station in Iberville Parish, Louisiana,
and an existing, inactive 19,800 hp
compressor unit at its existing Larose
Compressor Station in Lafourche Parish,
Louisiana; (v) installation of one new
31,900 hp compressor unit and related
appurtenances at both White Castle and
Larose Compressor Stations; and (vi)
upgrades at its Gator Express M&R
facility on an open water platform in
Plaquemines Parish.
The Commission mailed a copy of the
Notice of Availability of the Final
Environmental Impact Statement for the
Venice Extension Project to federal,
state, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American Tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
project area. The final EIS is only
available in electronic format. It may be
viewed and downloaded from the
FERC’s website (www.ferc.gov), on the
natural gas environmental documents
page (https://www.ferc.gov/industriesdata/natural-gas/environmentaloverview/environmental-documents2022). In addition, the final EIS may be
accessed by using the eLibrary link on
the FERC’s website. Click on the
eLibrary link (https://elibrary.ferc.gov/
eLibrary/search), select ‘‘General
Search,’’ and enter the docket number in
the ‘‘Docket Number’’ field (i.e., CP22–
15). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
11909
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://
ferconline.ferc.gov/FERCOnline.aspx to
register for eSubscription.
Dated: February 17, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–03836 Filed 2–23–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–57–000]
Texas Eastern Transmission, LP;
Notice of Application and Establishing
Intervention Deadline
Take notice that on February 10, 2023,
Texas Eastern Transmission, LP (Texas
Eastern), 915 N. Eldridge Parkway, Suite
1100, Houston, Texas 77079, filed an
application under sections 7(b) of the
Natural Gas Act (NGA), and part 157 of
the Commission’s regulations requesting
authorization to abandon one
compressor unit and related
appurtenances located in Cameron
Parish, Louisiana. Specifically, Texas
Eastern proposes to (i) abandon by
removal the 27,500-horsepower
compressor unit at the Grand Chenier
Compressor Station, the related
aboveground appurtenances with the
exception of mainline valve 5, and
underground facilities located at or
above a depth of 2 feet below grade, and
(ii) abandon in place all piping and
buried structures located below a depth
of 2 feet below grade, all related to the
Grand Chenier Compressor Station
(Project). Texas Eastern states that the
Project will allow Texas Eastern to
eliminate the need for future operating
and maintenance expenditures on
facilities that are not needed to meet
firm service obligations or for
interruptible transportation service.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
E:\FR\FM\24FEN1.SGM
24FEN1
Agencies
[Federal Register Volume 88, Number 37 (Friday, February 24, 2023)]
[Notices]
[Pages 11907-11909]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-03872]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER20-2004-003.
Applicants: Public Service Electric and Gas Company, PJM
Interconnection, L.L.C.
Description: Compliance filing: Public Service Electric and Gas
Company submits tariff filing per 35: PSEG submits Revisions to PJM
Tariff, Att. H-10 re: Order 864 to be effective 1/27/2020.
Filed Date: 2/17/23.
Accession Number: 20230217-5132.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER21-201-002.
Applicants: Atlantic City Electric Company, PJM Interconnection,
L.L.C.
Description: Compliance filing: Atlantic City Electric Company
submits tariff filing per 35: ACE Supplemental Compliance Filing in
ER21-201 to be effective N/A.
Filed Date: 2/17/23.
Accession Number: 20230217-5017.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER21-203-002.
Applicants: Baltimore Gas and Electric Company, PJM
Interconnection, L.L.C.
Description: Compliance filing: Baltimore Gas and Electric Company
submits tariff filing per 35: BGE Supplemental Compliance Filing in
ER21-203 to be effective N/A.
Filed Date: 2/17/23.
Accession Number: 20230217-5020.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER21-204-002.
Applicants: Commonwealth Edison Company, PJM Interconnection,
L.L.C.
Description: Compliance filing: Commonwealth Edison Company submits
tariff filing per 35: ComEd Supplemental Compliance Filing in ER21-204
to be effective N/A.
Filed Date: 2/17/23.
Accession Number: 20230217-5021.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER21-205-002.
Applicants: Delmarva Power & Light Company, PJM Interconnection,
L.L.C.
Description: Compliance filing: Delmarva Power & Light Company
submits tariff filing per 35: Delmarva Power & Light Supplemental
Compliance Filing in ER21-205 to be effective N/A.
Filed Date: 2/17/23.
Accession Number: 20230217-5063.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER21-206-002.
Applicants: Potomac Electric Power Company, PJM Interconnection,
L.L.C.
Description: Compliance filing: Potomac Electric Power Company
submits tariff filing per 35: PEPCO Supplemental Compliance Filing in
ER21-206 to be effective N/A.
Filed Date: 2/17/23.
Accession Number: 20230217-5065.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER21-209-002.
[[Page 11908]]
Applicants: PECO Energy Company, PJM Interconnection, L.L.C.
Description: Compliance filing: PECO Energy Company submits tariff
filing per 35: PECO Supplemental Compliance Filing in ER21-209 to be
effective N/A.
Filed Date: 2/17/23.
Accession Number: 20230217-5068.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23-155-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: 4028 Pixley Solar Energy & ITCGP
FSA-Deficiency Response to be effective 12/20/2022.
Filed Date: 2/17/23.
Accession Number: 20230217-5099.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23-342-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: 4029SO Panhandle Solar & SPS FSA-
Deficiency Response to be effective 4/19/2023.
Filed Date: 2/17/23.
Accession Number: 20230217-5104.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23-673-001.
Applicants: BHE Glacier Wind 1, LLC.
Description: Tariff Amendment: Amendment to MBR Tariff Revisions to
be effective 11/9/2022.
Filed Date: 2/17/23.
Accession Number: 20230217-5055.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23-674-001.
Applicants: BHE Wind Watch, LLC.
Description: Tariff Amendment: Amendment to MBR Tariff Revisions to
be effective 11/9/2022.
Filed Date: 2/17/23.
Accession Number: 20230217-5062.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER23-675-001.
Applicants: BHE Rim Rock Wind, LLC.
Description: Tariff Amendment: Amendment to MBR Tariff Revisions to
be effective 11/9/2022.
Filed Date: 2/17/23.
Accession Number: 20230217-5061.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23-676-001.
Applicants: BHE Power Watch, LLC.
Description: Tariff Amendment: Amendment to MBR Tariff Revisions to
be effective 11/9/2022.
Filed Date: 2/17/23.
Accession Number: 20230217-5060.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23-677-001.
Applicants: BHE Glacier Wind 2, LLC.
Description: Tariff Amendment: Amendment to MBR Tariff Revisions to
be effective 11/9/2022.
Filed Date: 2/17/23.
Accession Number: 20230217-5059.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23-791-000; ER23-792-000.
Applicants: Consolidated Edison Solutions, Inc., Consolidated
Edison Energy, Inc.
Description: Supplement to January 9, 2023 Consolidated Edison
Energy, Inc., et al.
Filed Date: 2/10/23.
Accession Number: 20230210-5236.
Comment Date: 5 p.m. ET 2/21/23.
Docket Numbers: ER23-1131-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA SA No. 6785 and
Cancellation of IISA SA No. 6184; Queue No. AE2-148 to be effective 1/
18/2023.
Filed Date: 2/17/23.
Accession Number: 20230217-5013.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23-1132-000.
Applicants: Pacific Gas and Electric Company.
Description: Notice of Termination of Service Agreement No. 34 of
Pacific Gas and Electric Company.
Filed Date: 2/16/23.
Accession Number: 20230216-5239.
Comment Date: 5 p.m. ET 3/9/23.
Docket Numbers: ER23-1133-000.
Applicants: Midcontinent Independent System Operator, Inc., Ameren
Illinois Company.
Description: Sec. 205(d) Rate Filing: Midcontinent Independent
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2023-
02-17_SA 3028 Ameren IL-Prairie Power-EIEC Project#38 Papineau to be
effective 4/19/2023.
Filed Date: 2/17/23.
Accession Number: 20230217-5031.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23-1134-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: 1st Amend GIA & DSA, Goleta
ES, WDT1454-1454EXP + Terminate e-Tariff record to be effective 4/19/
2023.
Filed Date: 2/17/23.
Accession Number: 20230217-5072.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23-1135-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: Lehi--Interconnection Agrmt
for POD's Rev 1 to be effective 4/19/2023.
Filed Date: 2/17/23.
Accession Number: 20230217-5073.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23-1136-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(iii: Shy Place Solar Park (Solar
& Battery) LGIA Filing to be effective 2/3/2023.
Filed Date: 2/17/23.
Accession Number: 20230217-5077.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23-1137-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: PacifiCorp Exchange
Agreement--NOC [Refile] to be effective 10/31/2022.
Filed Date: 2/17/23.
Accession Number: 20230217-5107.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23-1138-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to the Review of
Maintenance Adders and Operating Costs to be effective 4/19/2023.
Filed Date: 2/17/23.
Accession Number: 20230217-5108.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23-1139-000.
Applicants: Macquarie Energy LLC.
Description: Compliance filing: refund report Feb 2023 to be
effective N/A.
Filed Date: 2/17/23.
Accession Number: 20230217-5154.
Comment Date: 5 p.m. ET 3/10/23.
Docket Numbers: ER23-1140-000.
Applicants: Entergy Services, LLC, Entergy Arkansas, LLC, Entergy
Mississippi, LLC.
Description: Request for Limited Waiver, et al. of Entergy
Services, LLC.
Filed Date: 2/17/23.
Accession Number: 20230217-5174.
Comment Date: 5 p.m. ET 3/10/23.
Take notice that the Commission received the following PURPA
210(m)(3) filings:
Docket Numbers: QM23-3-000.
Applicants: Great River Energy.
Description: Application of Great River Energy to Terminate its
Mandatory Purchase Obligation under the Public Utility Regulatory
Policies Act of 1978.
Filed Date: 2/16/23.
Accession Number: 20230216-5206.
Comment Date: 5 p.m. ET 3/16/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211
[[Page 11909]]
and 214 of the Commission's Regulations (18 CFR 385.211 and 385.214) on
or before 5:00 p.m. Eastern time on the specified comment date.
Protests may be considered, but intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 17, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-03872 Filed 2-23-23; 8:45 am]