Eastern Gas Transmission and Storage, Inc.; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 11431-11432 [2023-03724]

Download as PDF Federal Register / Vol. 88, No. 36 / Thursday, February 23, 2023 / Notices 552–2762, or by email at matt.cutlip@ ferc.gov. Dated: February 15, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–03687 Filed 2–22–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–56–000] lotter on DSK11XQN23PROD with NOTICES1 Eastern Gas Transmission and Storage, Inc.; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that February 8, 2023, Eastern Gas Transmission and Storage, Inc. (EGTS) filed a prior notice request for authorization, in accordance with section 7 of the Natural Gas Act, and Part 157 Sections 157.205(b) and 157.216(b) of the Federal Energy Regulatory Commission’s (Commission) regulations under the Natural Gas Act and EGTS’s blanket certificate issued in Docket No. CP82–537–000 to abandon one transmission compressor station (CS); known as Helvetia CS, along with associated pipeline LN–1423/1 in Clearfield County, Pennsylvania, all as more fully set forth in the application which is on file with the Commission and open for public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application should be directed to James Scribner, Regulatory and Certificates Analyst, 6603 West Broad Street, Richmond, VA 23230 at 804–397–5113; or email at James.Scribner@bhegts.com VerDate Sep<11>2014 17:12 Feb 22, 2023 Jkt 259001 Pursuant to Section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on April 17, 2023. How to file protests, motions to intervene, and comments is explained below. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,2 any person 3 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,4 and must be submitted by 1 18 CFR (Code of Federal Regulations) 157.9. CFR 157.205. 3 Persons include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 4 18 CFR 157.205(e). 2 18 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 11431 the protest deadline, which is April 17, 2023. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 5 and the regulations under the NGA 6 by the intervention deadline for the project, which is April 17, 2023. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ how-guides. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before April 17, 2023. The filing of a comment alone will not serve to make the filer a party to the 5 18 6 18 E:\FR\FM\23FEN1.SGM CFR 385.214. CFR 157.10. 23FEN1 11432 Federal Register / Vol. 88, No. 36 / Thursday, February 23, 2023 / Notices proceeding. To become a party, you must intervene in the proceeding. lotter on DSK11XQN23PROD with NOTICES1 How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP23–56–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing’’; or 7 (2) You can file a paper copy of your submission by mailing it to the address below. Your submission must reference the Project docket number CP23–56– 000. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 To send via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852 The Commission encourages electronic filing of submissions (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FERCOnlineSupport@ferc.gov. Protests and motions to intervene must be served to the applicant by mail to: James Scribner, Regulatory and Certificates Analyst, 6603 West Broad Street, Richmond, Virginia 23230 or by email (with a link to the document) at James.Scribner@bhegts.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– 7 Additionally, you may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project. VerDate Sep<11>2014 17:12 Feb 22, 2023 Jkt 259001 FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to https://www.ferc.gov/ferconline/overview. Dated: February 16, 2023. Kimberly D. Bose, Secretary. Milestone Commission issues Draft EA. Comments on Draft EA ..... Commission issues Final EA. Target date June 2023. July 2023. October 2023.1 1 The Council on Environmental Quality’s (CEQ) regulations under 40 CFR 1501.10(b)(1) require that EAs be completed within 1 year of the Federal action agency’s decision to prepare an EA. This notice establishes the Commission’s intent to prepare an EA for the Moretown Project. Therefore, in accordance with CEQ’s regulations, the Final EA must be issued within 1 year of the issuance date of this notice. Any questions regarding this notice may be directed to Maryam Zavareh at (202) 502–8474 or maryam.zavareh@ ferc.gov. [FR Doc. 2023–03724 Filed 2–22–23; 8:45 am] Dated: February 15, 2023. Kimberly D. Bose, Secretary. BILLING CODE 6717–01–P [FR Doc. 2023–03685 Filed 2–22–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project No. 5944–024] Moretown Hydroelectric LLC; Notice of Intent To Prepare an Environmental Assessment On November 30, 2020, Moretown Hydroelectric LLC filed an application for a subsequent license to continue operating the existing 1,200-kilowatt Moretown No. 8 Hydroelectric Project No. 5944 (Moretown Project or project). The project is located on the Mad River in Washington County, Vermont. The project does not occupy Federal land. In accordance with the Commission’s regulations, on November 8, 2022, Commission staff issued a notice that the project was ready for environmental analysis (REA notice). Based on the information in the record, including comments filed on the REA notice, staff does not anticipate that licensing the project would constitute a major Federal action significantly affecting the quality of the human environment. Therefore, staff intends to prepare a draft and final Environmental Assessment (EA) on the application to license the Moretown Project. The EA will be issued and circulated for review by all interested parties. All comments filed on the EA will be analyzed by staff and considered in the Commission’s final licensing decision. The application will be processed according to the following schedule. Revisions to the schedule may be made as appropriate. PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC23–45–000. Applicants: St. Paul Cogeneration, LLC. Description: St. Paul Cogeneration, LLC submits Supplement to Application under Federal Power Act Section 203. Filed Date: 2/15/23. Accession Number: 20230215–5163. Comment Date: 5 p.m. ET 2/27/23. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG23–83–000. Applicants: Braes Bayou II, LLC. Description: Braes Bayou II, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 2/16/23. Accession Number: 20230216–5071. Comment Date: 5 p.m. ET 3/9/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER21–2459–000. Applicants: Tenaska Power Services Co. Description: Refund Report of Tenaska Power Services Co. Filed Date: 2/15/23. Accession Number: 20230215–5201. Comment Date: 5 p.m. ET 3/8/23. E:\FR\FM\23FEN1.SGM 23FEN1

Agencies

[Federal Register Volume 88, Number 36 (Thursday, February 23, 2023)]
[Notices]
[Pages 11431-11432]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-03724]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-56-000]


Eastern Gas Transmission and Storage, Inc.; Notice of Request 
Under Blanket Authorization and Establishing Intervention and Protest 
Deadline

    Take notice that February 8, 2023, Eastern Gas Transmission and 
Storage, Inc. (EGTS) filed a prior notice request for authorization, in 
accordance with section 7 of the Natural Gas Act, and Part 157 Sections 
157.205(b) and 157.216(b) of the Federal Energy Regulatory Commission's 
(Commission) regulations under the Natural Gas Act and EGTS's blanket 
certificate issued in Docket No. CP82-537-000 to abandon one 
transmission compressor station (CS); known as Helvetia CS, along with 
associated pipeline LN-1423/1 in Clearfield County, Pennsylvania, all 
as more fully set forth in the application which is on file with the 
Commission and open for public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions concerning this application should be directed to 
James Scribner, Regulatory and Certificates Analyst, 6603 West Broad 
Street, Richmond, VA 23230 at 804-397-5113; or email at 
[email protected]
    Pursuant to Section 157.9 of the Commission's Rules of Practice and 
Procedure,\1\ within 90 days of this Notice the Commission staff will 
either: complete its environmental review and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or environmental 
assessment (EA) for this proposal. The filing of an EA in the 
Commission's public record for this proceeding or the issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
federal and state agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
---------------------------------------------------------------------------

    \1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on April 17, 2023. 
How to file protests, motions to intervene, and comments is explained 
below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\2\ any person \3\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \2\ 18 CFR 157.205.
    \3\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\4\ and must be submitted by 
the protest deadline, which is April 17, 2023. A protest may also serve 
as a motion to intervene so long as the protestor states it also seeks 
to be an intervenor.
---------------------------------------------------------------------------

    \4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \5\ and the regulations under the NGA \6\ by the 
intervention deadline for the project, which is April 17, 2023. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/how-guides.
---------------------------------------------------------------------------

    \5\ 18 CFR 385.214.
    \6\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before April 17, 2023. The filing of a comment alone will not 
serve to make the filer a party to the

[[Page 11432]]

proceeding. To become a party, you must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP23-56-000 in your submission.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing''; or \7\
---------------------------------------------------------------------------

    \7\ Additionally, you may file your comments electronically by 
using the eComment feature, which is located on the Commission's 
website at www.ferc.gov under the link to Documents and Filings. 
Using eComment is an easy method for interested persons to submit 
brief, text-only comments on a project.
---------------------------------------------------------------------------

    (2) You can file a paper copy of your submission by mailing it to 
the address below. Your submission must reference the Project docket 
number CP23-56-000.

To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426
To send via any other courier, use the following address: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852

    The Commission encourages electronic filing of submissions (option 
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
    Protests and motions to intervene must be served to the applicant 
by mail to: James Scribner, Regulatory and Certificates Analyst, 6603 
West Broad Street, Richmond, Virginia 23230 or by email (with a link to 
the document) at [email protected]. Any subsequent submissions 
by an intervenor must be served on the applicant and all other parties 
to the proceeding. Contact information for parties can be downloaded 
from the service list at the eService link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to https://www.ferc.gov/ferc-online/overview.

    Dated: February 16, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-03724 Filed 2-22-23; 8:45 am]
BILLING CODE 6717-01-P