Eastern Gas Transmission and Storage, Inc.; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 11431-11432 [2023-03724]
Download as PDF
Federal Register / Vol. 88, No. 36 / Thursday, February 23, 2023 / Notices
552–2762, or by email at matt.cutlip@
ferc.gov.
Dated: February 15, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–03687 Filed 2–22–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–56–000]
lotter on DSK11XQN23PROD with NOTICES1
Eastern Gas Transmission and
Storage, Inc.; Notice of Request Under
Blanket Authorization and Establishing
Intervention and Protest Deadline
Take notice that February 8, 2023,
Eastern Gas Transmission and Storage,
Inc. (EGTS) filed a prior notice request
for authorization, in accordance with
section 7 of the Natural Gas Act, and
Part 157 Sections 157.205(b) and
157.216(b) of the Federal Energy
Regulatory Commission’s (Commission)
regulations under the Natural Gas Act
and EGTS’s blanket certificate issued in
Docket No. CP82–537–000 to abandon
one transmission compressor station
(CS); known as Helvetia CS, along with
associated pipeline LN–1423/1 in
Clearfield County, Pennsylvania, all as
more fully set forth in the application
which is on file with the Commission
and open for public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application should be directed to James
Scribner, Regulatory and Certificates
Analyst, 6603 West Broad Street,
Richmond, VA 23230 at 804–397–5113;
or email at James.Scribner@bhegts.com
VerDate Sep<11>2014
17:12 Feb 22, 2023
Jkt 259001
Pursuant to Section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on April 17, 2023. How to
file protests, motions to intervene, and
comments is explained below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,2 any person 3 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,4 and must be submitted by
1 18
CFR (Code of Federal Regulations) 157.9.
CFR 157.205.
3 Persons include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
4 18 CFR 157.205(e).
2 18
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
11431
the protest deadline, which is April 17,
2023. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 5 and the regulations under
the NGA 6 by the intervention deadline
for the project, which is April 17, 2023.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
how-guides.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before April 17,
2023. The filing of a comment alone will
not serve to make the filer a party to the
5 18
6 18
E:\FR\FM\23FEN1.SGM
CFR 385.214.
CFR 157.10.
23FEN1
11432
Federal Register / Vol. 88, No. 36 / Thursday, February 23, 2023 / Notices
proceeding. To become a party, you
must intervene in the proceeding.
lotter on DSK11XQN23PROD with NOTICES1
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–56–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 7
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–56–
000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To send via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FERCOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served to the applicant by mail
to: James Scribner, Regulatory and
Certificates Analyst, 6603 West Broad
Street, Richmond, Virginia 23230 or by
email (with a link to the document) at
James.Scribner@bhegts.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
7 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
VerDate Sep<11>2014
17:12 Feb 22, 2023
Jkt 259001
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to https://www.ferc.gov/ferconline/overview.
Dated: February 16, 2023.
Kimberly D. Bose,
Secretary.
Milestone
Commission issues Draft
EA.
Comments on Draft EA .....
Commission issues Final
EA.
Target date
June 2023.
July 2023.
October 2023.1
1 The Council on Environmental Quality’s
(CEQ)
regulations
under
40
CFR
1501.10(b)(1) require that EAs be completed
within 1 year of the Federal action agency’s
decision to prepare an EA. This notice establishes the Commission’s intent to prepare an
EA for the Moretown Project. Therefore, in accordance with CEQ’s regulations, the Final EA
must be issued within 1 year of the issuance
date of this notice.
Any questions regarding this notice
may be directed to Maryam Zavareh at
(202) 502–8474 or maryam.zavareh@
ferc.gov.
[FR Doc. 2023–03724 Filed 2–22–23; 8:45 am]
Dated: February 15, 2023.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
[FR Doc. 2023–03685 Filed 2–22–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 5944–024]
Moretown Hydroelectric LLC; Notice of
Intent To Prepare an Environmental
Assessment
On November 30, 2020, Moretown
Hydroelectric LLC filed an application
for a subsequent license to continue
operating the existing 1,200-kilowatt
Moretown No. 8 Hydroelectric Project
No. 5944 (Moretown Project or project).
The project is located on the Mad River
in Washington County, Vermont. The
project does not occupy Federal land.
In accordance with the Commission’s
regulations, on November 8, 2022,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA notice). Based on the
information in the record, including
comments filed on the REA notice, staff
does not anticipate that licensing the
project would constitute a major Federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare a draft and final
Environmental Assessment (EA) on the
application to license the Moretown
Project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC23–45–000.
Applicants: St. Paul Cogeneration,
LLC.
Description: St. Paul Cogeneration,
LLC submits Supplement to Application
under Federal Power Act Section 203.
Filed Date: 2/15/23.
Accession Number: 20230215–5163.
Comment Date: 5 p.m. ET 2/27/23.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG23–83–000.
Applicants: Braes Bayou II, LLC.
Description: Braes Bayou II, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 2/16/23.
Accession Number: 20230216–5071.
Comment Date: 5 p.m. ET 3/9/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–2459–000.
Applicants: Tenaska Power Services
Co.
Description: Refund Report of
Tenaska Power Services Co.
Filed Date: 2/15/23.
Accession Number: 20230215–5201.
Comment Date: 5 p.m. ET 3/8/23.
E:\FR\FM\23FEN1.SGM
23FEN1
Agencies
[Federal Register Volume 88, Number 36 (Thursday, February 23, 2023)]
[Notices]
[Pages 11431-11432]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-03724]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-56-000]
Eastern Gas Transmission and Storage, Inc.; Notice of Request
Under Blanket Authorization and Establishing Intervention and Protest
Deadline
Take notice that February 8, 2023, Eastern Gas Transmission and
Storage, Inc. (EGTS) filed a prior notice request for authorization, in
accordance with section 7 of the Natural Gas Act, and Part 157 Sections
157.205(b) and 157.216(b) of the Federal Energy Regulatory Commission's
(Commission) regulations under the Natural Gas Act and EGTS's blanket
certificate issued in Docket No. CP82-537-000 to abandon one
transmission compressor station (CS); known as Helvetia CS, along with
associated pipeline LN-1423/1 in Clearfield County, Pennsylvania, all
as more fully set forth in the application which is on file with the
Commission and open for public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions concerning this application should be directed to
James Scribner, Regulatory and Certificates Analyst, 6603 West Broad
Street, Richmond, VA 23230 at 804-397-5113; or email at
[email protected]
Pursuant to Section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on April 17, 2023.
How to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\2\ any person \3\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\2\ 18 CFR 157.205.
\3\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\4\ and must be submitted by
the protest deadline, which is April 17, 2023. A protest may also serve
as a motion to intervene so long as the protestor states it also seeks
to be an intervenor.
---------------------------------------------------------------------------
\4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \5\ and the regulations under the NGA \6\ by the
intervention deadline for the project, which is April 17, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/how-guides.
---------------------------------------------------------------------------
\5\ 18 CFR 385.214.
\6\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before April 17, 2023. The filing of a comment alone will not
serve to make the filer a party to the
[[Page 11432]]
proceeding. To become a party, you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP23-56-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \7\
---------------------------------------------------------------------------
\7\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
number CP23-56-000.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426
To send via any other courier, use the following address: Kimberly D.
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
Protests and motions to intervene must be served to the applicant
by mail to: James Scribner, Regulatory and Certificates Analyst, 6603
West Broad Street, Richmond, Virginia 23230 or by email (with a link to
the document) at [email protected]. Any subsequent submissions
by an intervenor must be served on the applicant and all other parties
to the proceeding. Contact information for parties can be downloaded
from the service list at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to https://www.ferc.gov/ferc-online/overview.
Dated: February 16, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-03724 Filed 2-22-23; 8:45 am]
BILLING CODE 6717-01-P