Moretown Hydroelectric LLC; Notice of Intent To Prepare an Environmental Assessment, 11432 [2023-03685]
Download as PDF
11432
Federal Register / Vol. 88, No. 36 / Thursday, February 23, 2023 / Notices
proceeding. To become a party, you
must intervene in the proceeding.
lotter on DSK11XQN23PROD with NOTICES1
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–56–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 7
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–56–
000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To send via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FERCOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served to the applicant by mail
to: James Scribner, Regulatory and
Certificates Analyst, 6603 West Broad
Street, Richmond, Virginia 23230 or by
email (with a link to the document) at
James.Scribner@bhegts.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
7 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
VerDate Sep<11>2014
17:12 Feb 22, 2023
Jkt 259001
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to https://www.ferc.gov/ferconline/overview.
Dated: February 16, 2023.
Kimberly D. Bose,
Secretary.
Milestone
Commission issues Draft
EA.
Comments on Draft EA .....
Commission issues Final
EA.
Target date
June 2023.
July 2023.
October 2023.1
1 The Council on Environmental Quality’s
(CEQ)
regulations
under
40
CFR
1501.10(b)(1) require that EAs be completed
within 1 year of the Federal action agency’s
decision to prepare an EA. This notice establishes the Commission’s intent to prepare an
EA for the Moretown Project. Therefore, in accordance with CEQ’s regulations, the Final EA
must be issued within 1 year of the issuance
date of this notice.
Any questions regarding this notice
may be directed to Maryam Zavareh at
(202) 502–8474 or maryam.zavareh@
ferc.gov.
[FR Doc. 2023–03724 Filed 2–22–23; 8:45 am]
Dated: February 15, 2023.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
[FR Doc. 2023–03685 Filed 2–22–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 5944–024]
Moretown Hydroelectric LLC; Notice of
Intent To Prepare an Environmental
Assessment
On November 30, 2020, Moretown
Hydroelectric LLC filed an application
for a subsequent license to continue
operating the existing 1,200-kilowatt
Moretown No. 8 Hydroelectric Project
No. 5944 (Moretown Project or project).
The project is located on the Mad River
in Washington County, Vermont. The
project does not occupy Federal land.
In accordance with the Commission’s
regulations, on November 8, 2022,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA notice). Based on the
information in the record, including
comments filed on the REA notice, staff
does not anticipate that licensing the
project would constitute a major Federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare a draft and final
Environmental Assessment (EA) on the
application to license the Moretown
Project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC23–45–000.
Applicants: St. Paul Cogeneration,
LLC.
Description: St. Paul Cogeneration,
LLC submits Supplement to Application
under Federal Power Act Section 203.
Filed Date: 2/15/23.
Accession Number: 20230215–5163.
Comment Date: 5 p.m. ET 2/27/23.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG23–83–000.
Applicants: Braes Bayou II, LLC.
Description: Braes Bayou II, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 2/16/23.
Accession Number: 20230216–5071.
Comment Date: 5 p.m. ET 3/9/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–2459–000.
Applicants: Tenaska Power Services
Co.
Description: Refund Report of
Tenaska Power Services Co.
Filed Date: 2/15/23.
Accession Number: 20230215–5201.
Comment Date: 5 p.m. ET 3/8/23.
E:\FR\FM\23FEN1.SGM
23FEN1
Agencies
[Federal Register Volume 88, Number 36 (Thursday, February 23, 2023)]
[Notices]
[Page 11432]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-03685]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5944-024]
Moretown Hydroelectric LLC; Notice of Intent To Prepare an
Environmental Assessment
On November 30, 2020, Moretown Hydroelectric LLC filed an
application for a subsequent license to continue operating the existing
1,200-kilowatt Moretown No. 8 Hydroelectric Project No. 5944 (Moretown
Project or project). The project is located on the Mad River in
Washington County, Vermont. The project does not occupy Federal land.
In accordance with the Commission's regulations, on November 8,
2022, Commission staff issued a notice that the project was ready for
environmental analysis (REA notice). Based on the information in the
record, including comments filed on the REA notice, staff does not
anticipate that licensing the project would constitute a major Federal
action significantly affecting the quality of the human environment.
Therefore, staff intends to prepare a draft and final Environmental
Assessment (EA) on the application to license the Moretown Project.
The EA will be issued and circulated for review by all interested
parties. All comments filed on the EA will be analyzed by staff and
considered in the Commission's final licensing decision.
The application will be processed according to the following
schedule. Revisions to the schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Commission issues Draft EA............. June 2023.
Comments on Draft EA................... July 2023.
Commission issues Final EA............. October 2023.\1\
------------------------------------------------------------------------
\1\ The Council on Environmental Quality's (CEQ) regulations under 40
CFR 1501.10(b)(1) require that EAs be completed within 1 year of the
Federal action agency's decision to prepare an EA. This notice
establishes the Commission's intent to prepare an EA for the Moretown
Project. Therefore, in accordance with CEQ's regulations, the Final EA
must be issued within 1 year of the issuance date of this notice.
Any questions regarding this notice may be directed to Maryam
Zavareh at (202) 502-8474 or [email protected].
Dated: February 15, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-03685 Filed 2-22-23; 8:45 am]