Download as PDF lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 88, No. 26 / Wednesday, February 8, 2023 / Notices Accession Number: 20230131–5279. Comment Date: 5 p.m. ET 2/21/23. Docket Numbers: ER23–1016–000. Applicants: Big Level Wind LLC. Description: § 205(d) Rate Filing: Notice of Change in Status to be effective 4/2/2023. Filed Date: 1/31/23. Accession Number: 20230131–5282. Comment Date: 5 p.m. ET 2/21/23. Docket Numbers: ER23–1017–000. Applicants: TransAlta Energy Marketing Corp. Description: § 205(d) Rate Filing: Notice of Change in Status to be effective 4/2/2023. Filed Date: 1/31/23. Accession Number: 20230131–5283. Comment Date: 5 p.m. ET 2/21/23. Docket Numbers: ER23–1018–000. Applicants: TransAlta Energy Marketing (U.S.) Inc. Description: § 205(d) Rate Filing: Notice of Change in Status to be effective 4/2/2023. Filed Date: 1/31/23. Accession Number: 20230131–5287. Comment Date: 5 p.m. ET 2/21/23. Docket Numbers: ER23–1019–000. Applicants: ISO New England Inc., New England Power Company. Description: Tariff Amendment: ISO New England Inc. submits tariff filing per 35.15: ISO–NE/NEP; Notice of Cancellation of Third Revised TSA– NEP–83 to be effective 1/1/2023. Filed Date: 1/31/23. Accession Number: 20230131–5308. Comment Date: 5 p.m. ET 2/21/23. Docket Numbers: ER23–1020–000. Applicants: New England Power Pool Participants Committee. Description: § 205(d) Rate Filing: Feb 2023 Membership Filing to be effective 1/1/2023. Filed Date: 1/31/23. Accession Number: 20230131–5311. Comment Date: 5 p.m. ET 2/21/23. Docket Numbers: ER23–1021–000. Applicants: ENGIE Retail, LLC. Description: Compliance filing: Think Energy Change in Status and Revised MBR Tariff to be effective 2/1/2023. Filed Date: 1/31/23. Accession Number: 20230131–5313. Comment Date: 5 p.m. ET 2/21/23. Docket Numbers: ER23–1023–000. Applicants: The Narragansett Electric Company. Description: § 205(d) Rate Filing: Orig Large Generator Interconnection Agreement No. IA–NECO–26 Under ISO–NE OATT to be effective 1/1/2023. Filed Date: 2/1/23. Accession Number: 20230201–5000. Comment Date: 5 p.m. ET 2/22/23. Docket Numbers: ER23–1024–000. VerDate Sep<11>2014 16:59 Feb 07, 2023 Jkt 259001 Applicants: Midcontinent Independent System Operator, Inc., American Transmission Company LLC. Description: § 205(d) Rate Filing: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii): 2023–02–01_SA 2802 ATC-City of Two Rivers 2nd Rev CFA to be effective 4/3/2023. Filed Date: 2/1/23. Accession Number: 20230201–5026. Comment Date: 5 p.m. ET 2/22/23. Docket Numbers: ER23–1025–000. Applicants: Midcontinent Independent System Operator, Inc., American Transmission Company LLC. Description: § 205(d) Rate Filing: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii): 2023–02–01_SA 2770 ATC-Sun Prairie 2nd Rev CFA to be effective 4/3/2023. Filed Date: 2/1/23. Accession Number: 20230201–5031. Comment Date: 5 p.m. ET 2/22/23. Docket Numbers: ER23–1026–000. Applicants: World Fuel Services, Inc. Description: Tariff Amendment: World Fuel Services Cancels MBR Tariff Filing to be effective 2/2/2023. Filed Date: 2/1/23. Accession Number: 20230201–5096. Comment Date: 5 p.m. ET 2/22/23. Docket Numbers: ER23–1027–000. Applicants: Northwestern Corporation (Montana). Description: Formula Rate 2022 Postemployment Benefits Other than Pensions filing of NorthWestern Corporation (Montana). Filed Date: 1/31/23. Accession Number: 20230131–5464. Comment Date: 5 p.m. ET 2/21/23. Docket Numbers: ER23–1028–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: CostBased Load Service Contract with the City of Hurricane, Utah to be effective 2/1/2023. Filed Date: 2/1/23. Accession Number: 20230201–5152. Comment Date: 5 p.m. ET 2/22/23. Docket Numbers: ER23–1029–000. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: § 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii): Coosa Pines Solar LGIA Filing to be effective 1/23/ 2023. Filed Date: 2/1/23. Accession Number: 20230201–5155. Comment Date: 5 p.m. ET 2/22/23. Docket Numbers: ER23–1030–000. Applicants: Basin Electric Power Cooperative. PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 8275 Description: § 205(d) Rate Filing: Basin Electric Amendment to Service Agreement No. 101 with Tri-State to be effective 11/29/2022. Filed Date: 2/1/23. Accession Number: 20230201–5161. Comment Date: 5 p.m. ET 2/22/23. Docket Numbers: ER23–1031–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Initial Filing of Service Agreement FERC No. 111 to be effective 1/9/2023. Filed Date: 2/1/23. Accession Number: 20230201–5165. Comment Date: 5 p.m. ET 2/22/23. Docket Numbers: ER23–1032–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: Tariff Amendment: Notice of Cancellation of Service Agreements FERC No. 104 and 204 to be effective 1/31/2023. Filed Date: 2/1/23. Accession Number: 20230201–5185. Comment Date: 5 p.m. ET 2/22/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 1, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–02609 Filed 2–7–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14861–002] FFP Project 101, LLC; Notice of Modification of Procedural Schedule Take notice that the schedule for processing the following hydroelectric application has been modified. E:\FR\FM\08FEN1.SGM 08FEN1 8276 Federal Register / Vol. 88, No. 26 / Wednesday, February 8, 2023 / Notices a. Type of Application: Original Major License. b. Project No.: 14861–002. c. Date Filed: June 23, 2020. d. Applicant: FFP Project 101, LLC. e. Name of Project: Goldendale Energy Storage Project. f. Location: Off-stream on the north side of the Columbia River at River Mile 215.6 in Klickitat County, Washington, with transmission facilities extending into Sherman County, Oregon. The project would be located approximately 8 miles southeast of the City of Goldendale, Washington. The project would occupy 18.1 acres of lands owned by the U.S. Army Corps of Engineers and administered by the Bonneville Power Administration. g. Filed Pursuant to: Federal Power Act 16 U.S.C.791(a)–825(r). h. Applicant Contact: Erik Steimle, Rye Development, 745 Atlantic Avenue Boston Massachusetts 02111; (503) 998– 0230; email—erik@ ryedevelopment.com. i. FERC Contact: Michael Tust at (202) 502–6522; or email at michael.tust@ ferc.gov. j. Procedural Schedule: The Commission’s June 6, 2022, Notice of Notice of Intent to Prepare an Environmental Impact Statement established January 2023 as the target date for issuing the Draft Environmental Impact Statement (Draft EIS). The revised estimate for issuing the Draft EIS is March 2023. As such, the application will be processed according to the following revised schedule. The timeframe for the Final EIS has not been revised. Additional revisions to the schedule may be made as appropriate. Milestone Issue Draft EIS ............................ Draft EIS Public Meeting ............. Comments on Draft EIS due ....... Commission issues Final EIS ...... Target date March 2023. April 2023. May 2023. October 2023. Any questions regarding this notice may be directed to Michael Tust at (202) 502–6522 or michael.tust@ferc.gov. Dated: February 2, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–02642 Filed 2–7–23; 8:45 am] BILLING CODE 6717–01–P lotter on DSK11XQN23PROD with NOTICES1 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: VerDate Sep<11>2014 16:59 Feb 07, 2023 Jkt 259001 Mechanism—Eff. March 1, 2023 to be effective 3/1/2023. Docket Numbers: RP23–391–000. Filed Date: 1/31/23. Applicants: Maritimes & Northeast Accession Number: 20230131–5200. Pipeline, L.L.C. Comment Date: 5 p.m. ET 2/13/23. Description: § 4(d) Rate Filing: Docket Numbers: RP23–399–000. Negotiated Rates—Northern to Direct Applicants: Big Sandy Pipeline, LLC. Energy 2804 eff 2–1–23 to be effective Description: § 4(d) Rate Filing: Big 2/1/2023. Sandy Address Change Filing to be Filed Date: 1/31/23. effective 8/1/2023. Accession Number: 20230131–5160. Filed Date: 1/31/23. Comment Date: 5 p.m. ET 2/13/23. Accession Number: 20230131–5201. Docket Numbers: RP23–392–000. Comment Date: 5 p.m. ET 2/13/23. Applicants: Egan Hub Storage, LLC. Description: § 4(d) Rate Filing: Egan Docket Numbers: RP23–400–000. Hub Address Change Filing to be Applicants: Garden Banks Gas effective 8/1/2023. Pipeline, LLC. Filed Date: 1/31/23. Description: § 4(d) Rate Filing: Garden Accession Number: 20230131–5189. Banks Address Change Filing to be Comment Date: 5 p.m. ET 2/13/23. effective 8/1/2023. Filed Date: 1/31/23. Docket Numbers: RP23–393–000. Applicants: Algonquin Gas Accession Number: 20230131–5209. Transmission, LLC. Comment Date: 5 p.m. ET 2/13/23. Description: § 4(d) Rate Filing: AGT Docket Numbers: RP23–401–000. Address Change Filing to be effective 8/ Applicants: Mississippi Canyon Gas 1/2023. Pipeline, L.L.C. Filed Date: 1/31/23. Description: § 4(d) Rate Filing: Accession Number: 20230131–5190. Mississippi Canyon Address Change Comment Date: 5 p.m. ET 2/13/23. Filing to be effective 8/1/2023. Docket Numbers: RP23–394–000. Filed Date: 1/31/23. Applicants: NEXUS Gas Accession Number: 20230131–5213. Transmission, LLC. Comment Date: 5 p.m. ET 2/13/23. Description: § 4(d) Rate Filing: Docket Numbers: RP23–402–000. NEXUS Address Change Filing to be Applicants: Nautilus Pipeline effective 8/1/2023. Company, L.L.C. Filed Date: 1/31/23. Description: § 4(d) Rate Filing: Accession Number: 20230131–5192. Nautilus Address Change Filing to be Comment Date: 5 p.m. ET 2/13/23. effective 8/1/2023. Docket Numbers: RP23–395–000. Filed Date: 1/31/23. Applicants: Texas Eastern Accession Number: 20230131–5216. Transmission, LP. Comment Date: 5 p.m. ET 2/13/23. Description: § 4(d) Rate Filing: TETLP Docket Numbers: RP23–403–000. Address Change Filing to be effective 8/ Applicants: Texas Eastern 1/2023. Transmission, LP. Filed Date: 1/31/23. Description: § 4(d) Rate Filing: Accession Number: 20230131–5195. Negotiated Rates—Nextera NRAs eff 02– Comment Date: 5 p.m. ET 2/13/23. 01–23 to be effective 2/1/2023. Docket Numbers: RP23–396–000. Filed Date: 1/31/23. Applicants: Bobcat Gas Storage. Accession Number: 20230131–5239. Description: § 4(d) Rate Filing: BGS Comment Date: 5 p.m. ET 2/13/23. Address Change Filing to be effective 8/ Docket Numbers: RP23–404–000. 1/2023. Applicants: NEXUS Gas Filed Date: 1/31/23. Transmission, LLC. Accession Number: 20230131–5196. Description: § 4(d) Rate Filing: Comment Date: 5 p.m. ET 2/13/23. Negotiated Rates—EAP Ohio to Citadel Docket Numbers: RP23–397–000. 962957 eff 1–27–23 to be effective 1/27/ Applicants: Maritimes & Northeast 2023. Pipeline, L.L.C. Filed Date: 1/31/23. Description: § 4(d) Rate Filing: MNUS Accession Number: 20230131–5265. Address Change Filing to be effective 8/ Comment Date: 5 p.m. ET 2/13/23. 1/2023. Filed Date: 1/31/23. Docket Numbers: RP23–405–000. Accession Number: 20230131–5198. Applicants: Columbia Gas Comment Date: 5 p.m. ET 2/13/23. Transmission, LLC. Description: § 4(d) Rate Filing: Antero Docket Numbers: RP23–398–000. Applicants: Southern Star Central Gas Release to MU Mktg_176700 to be effective 2/1/2023. Pipeline, Inc. Filed Date: 1/31/23. Description: § 4(d) Rate Filing: Annual Accession Number: 20230131–5267. Modernization Capital Cost Recovery Filings Instituting Proceedings PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\08FEN1.SGM 08FEN1

Agencies

[Federal Register Volume 88, Number 26 (Wednesday, February 8, 2023)]
[Notices]
[Pages 8275-8276]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-02642]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14861-002]


FFP Project 101, LLC; Notice of Modification of Procedural 
Schedule

    Take notice that the schedule for processing the following 
hydroelectric application has been modified.

[[Page 8276]]

    a. Type of Application: Original Major License.
    b. Project No.: 14861-002.
    c. Date Filed: June 23, 2020.
    d. Applicant: FFP Project 101, LLC.
    e. Name of Project: Goldendale Energy Storage Project.
    f. Location: Off-stream on the north side of the Columbia River at 
River Mile 215.6 in Klickitat County, Washington, with transmission 
facilities extending into Sherman County, Oregon. The project would be 
located approximately 8 miles southeast of the City of Goldendale, 
Washington. The project would occupy 18.1 acres of lands owned by the 
U.S. Army Corps of Engineers and administered by the Bonneville Power 
Administration.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C.791(a)-825(r).
    h. Applicant Contact: Erik Steimle, Rye Development, 745 Atlantic 
Avenue Boston Massachusetts 02111; (503) 998-0230; email_
[email protected]
    i. FERC Contact: Michael Tust at (202) 502-6522; or email at 
[email protected].
    j. Procedural Schedule: The Commission's June 6, 2022, Notice of 
Notice of Intent to Prepare an Environmental Impact Statement 
established January 2023 as the target date for issuing the Draft 
Environmental Impact Statement (Draft EIS). The revised estimate for 
issuing the Draft EIS is March 2023. As such, the application will be 
processed according to the following revised schedule. The timeframe 
for the Final EIS has not been revised. Additional revisions to the 
schedule may be made as appropriate.

------------------------------------------------------------------------
                Milestone                           Target date
------------------------------------------------------------------------
Issue Draft EIS.........................  March 2023.
Draft EIS Public Meeting................  April 2023.
Comments on Draft EIS due...............  May 2023.
Commission issues Final EIS.............  October 2023.
------------------------------------------------------------------------

    Any questions regarding this notice may be directed to Michael Tust 
at (202) 502-6522 or [email protected].

    Dated: February 2, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-02642 Filed 2-7-23; 8:45 am]