Viking Gas Transmission Company; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 8279-8281 [2023-02637]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 88, No. 26 / Wednesday, February 8, 2023 / Notices
currently used to maintain Western
Area Power Administration
transmission lines and would be
modified to accommodate larger
construction vehicles. The project
would also involve constructing the
following new facilities: (1) a 8,498-footlong roller-compacted concrete waterretaining structure that would create a
114-acre upper reservoir which would
be lined to reduce leakage and would be
surrounded by a 10-foot-high chain and
rail security fence; (2) a 200-foot-long
concrete ogee emergency spillway
incorporated into the upper reservoir
capable of directing emergency spill
flows down a stepped spillway into a
stilling basin and then down a natural
gulley and into the Bureau of
Reclamation’s Kortes Reservoir; (3) a
water conveyance tunnel system
connecting the new upper reservoir
with Seminoe Reservoir that consists of
the following structures: (a) a 2,756-footlong D-shaped concrete-lined
belowground headrace tunnel; (b) a 615foot-long steel aboveground conduit
section across a gully that is supported
by concrete piers; (c) a 30-foot-diameter,
1,225-foot-long concrete-lined
belowground vertical shaft; (d) a 30foot-diameter, 123-foot-long concretelined belowground high pressure tunnel
connected to a manifold and three
separate 17-foot-diameter concrete and
steel-lined belowground penstocks with
lengths of 330 feet, 247 feet, and 165
feet; (e) three concrete and steel-lined
17.5-foot-diameter belowground draft
tube extensions with lengths of 140 feet,
103 feet, and 85 feet connected to a
manifold; (f) a 36-foot-diameter, 232foot-long belowground surge chamber;
and (g) a 31-foot-diameter, 4,070-footlong belowground tailrace tunnel; (4) a
460-foot-long, 80-foot-wide, 142-foothigh belowground powerhouse
containing three 324-megawatt Francis
pump-turbines and three generatormotors; (5) three busbar galleries
approximately 170-feet-long leading to a
413-foot-long, 71-foot-wide, 113-foothigh belowground transformer cavern
containing three-phase step-up
transformers and a switchgear
switchyard; (6) two 500-kilovolt circuits
connecting from the switchgear through
a 765-foot-long belowground tunnel to a
vertical cable shaft that emerges
aboveground; (7) two separate 30-milelong, 500-kilovolt overhead
transmission lines that connect to the
grid at the existing Aeolus substation;
(8) a new 40-foot-wide bridge crossing
over the Seminoe Dam tailrace on the
North Platte River that connects Morgan
Creek Road on the left side of the river
to a main access tunnel portal on the
VerDate Sep<11>2014
16:59 Feb 07, 2023
Jkt 259001
right side of the river to provide access
to the powerhouse; (9) two other
secondary tunnels for accessing the
lower reservoir intake and surge shaft;
and (10) appurtenant facilities.
Additionally, two existing Western Area
Power Administration transmission
lines that currently cross the new upper
reservoir site would be relocated.
The water used to initially fill the
new upper reservoir and provide makeup water would come from Seminoe
Reservoir. The initial volume of water
necessary to fill the upper reservoir is
estimated to be 13,300 acre-feet and
would be filled over a two- to four-week
period. It is estimated that the project
would need approximately 272 acre-feet
of water each year to replenish water
lost through evaporation and seepage.
Once the upper reservoir is filled,
approximately 10,800 acre-feet could be
cycled between the upper reservoir and
Seminoe Reservoir each day. The
project is designed to generate
electricity on demand for up to 9.7
hours each day at the maximum
generating capacity. The estimated
annual generation is 2,916 gigawatthours per year.
p. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents via the
internet through the Commission’s
Home Page (https://www.ferc.gov) using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659.
You may also register online at
https://ferconline.ferc.gov/FERCOnline.
aspx to be notified via email of new
filings and issuances related to this or
other pending projects. For assistance,
contact FERC Online Support.
q. Procedural schedule: Consistent
with the requirements in FAST–41, a
procedural schedule for processing the
license application will be developed in
consultation with the relevant agencies
and subsequently posted to the docket.
r. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis
Dated: February 2, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–02643 Filed 2–7–23; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
8279
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–40–000]
Viking Gas Transmission Company;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on January 23, 2023,
Viking Gas Transmission Company
(Viking) 100 West 5th Street, Tulsa,
Oklahoma 74103, filed in the above
referenced docket, a prior notice request
pursuant to sections 157.205, 157.208
and 157.211 1 of the Federal Energy
Regulatory Commission’s regulations
under the Natural Gas Act (NGA) and
Viking’s blanket certificate issued in
Docket No. CP82–414–000,2 requesting
authorization to construct, own, operate,
and maintain a new pipeline lateral to
Grand Forks, North Dakota. Viking
estimates the cost of the lateral to be
$26,940,000, as more fully described in
the application which is on file with the
Commission and open to public
inspection.
Specifically, Viking is proposing to
build its Line MNB2204C (the Project),
in Polk County, Minnesota and Grand
Forks County, North Dakota. Viking
proposes to: (i) construct 13.2 miles of
12-inch-diameter lateral pipeline that
runs from Viking’s mainline to the East
Grand Forks, Minnesota Meter Station
(MN Meter Station); (ii) construct 0.8
mile of 12-inch-diameter pipeline from
the new Grand Forks, North Dakota
Launcher Site (ND Launcher Site) to a
new meter station in Grand Forks, North
Dakota; and (iii) relocate and upsize a
meter from the MN Meter Station to the
ND Launcher Site. Minor auxiliary
facilities installations and modifications
will also be made pursuant to section
2.55(a) of the Commission’s
regulations.3 The Project will provide
up to 42,000 dekatherms per day (Dth/
1 18
CFR157.205, 157.208, 157.211.
September 1, 1982, in Docket No. CP82–
414–000, Midwestern Gas Transmission Company
(Midwestern) was issued a blanket certificate for its
entire pipeline system, which was composed of its
Southern System, extending from Portland,
Tennessee to Joliet, Illinois, and its Northern
System, extending from the United States-Canada
international boundary near Emerson, Minnesota to
Marshfield, Wisconsin. Midwestern Gas
Transmission Co., 20 FERC ¶ 62,411 (1982).
Subsequently, on April 6, 1989, in Docket No.
CP88–679–000, the Commission authorized
Midwestern’s abandonment by transfer to Viking
and Viking’s acquisition of Midwestern’s Northern
System. Midwestern Gas Transmission Co., 47
FERC ¶ 61,017 (1989).
3 18 CFR 2.55(a).
2 On
E:\FR\FM\08FEN1.SGM
08FEN1
8280
Federal Register / Vol. 88, No. 26 / Wednesday, February 8, 2023 / Notices
d) of firm transportation service on
Viking’s system to a new delivery point.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov.) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov.or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application should be directed to Denise
Adams, Director, Regulatory Affairs
ONEOK, Inc., 100 West 5th Street,
Tulsa, Oklahoma 74103, by telephone at
(918) 732–1408, or by email at
regulatoryaffairs@oneok.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on April 3, 2023. How to
file protests, motions to intervene, and
comments is explained below.
lotter on DSK11XQN23PROD with NOTICES1
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,4 any person 5 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations, 6 and must be submitted by
the protest deadline, which is April 3,
2023. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 7 and the regulations under
the NGA 8 by the intervention deadline
for the project, which is April 3, 2023.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
4 18
5 Persons
VerDate Sep<11>2014
16:59 Feb 07, 2023
Jkt 259001
6 18
CFR 157.205(e).
CFR 385.214.
8 18 CFR 157.10.
7 18
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before April 3,
2023. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–40–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 9
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–40–
000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: Denise Adams, Director,
Regulatory Affairs, 100 West 5th Street,
Tulsa, Oklahoma 74103, or by email at
regulatoryaffairs@oneok.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
9 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
E:\FR\FM\08FEN1.SGM
08FEN1
Federal Register / Vol. 88, No. 26 / Wednesday, February 8, 2023 / Notices
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: February 2, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–02637 Filed 2–7–23; 8:45 am]
FOR FURTHER INFORMATION CONTACT:
BILLING CODE 6717–01–P
Edward Laird, Watershed Restoration,
Assessment and Protection Division
(WRAPD), Office of Wetlands, Oceans,
and Watersheds, Mail Code: 4503T,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460; telephone number: 202–566–
2848; fax number: 202–566–1437; email
address: laird.edward@epa.gov.
SUPPLEMENTARY INFORMATION: This is a
proposed 3-year extension of the ICR,
which is currently approved through
March 31, 2023. An agency may not
conduct or sponsor and a person is not
required to respond to a collection of
information unless it displays a
currently valid OMB control number.
Public comments were previously
requested via the Federal Register (87
FR 43029) on July 19, 2022 during a 60day comment period. This notice allows
for an additional 30 days for public
comments. Supporting documents that
explain in detail the information that
the EPA will be collecting are available
in the public docket for this ICR (Docket
ID EPA–HQ–OW–2003–0026). The
docket can be viewed online at
www.regulations.gov or in person at the
EPA Docket Center, WJC West, Room
3334, 1301 Constitution Ave. NW,
Washington, DC. The telephone number
for the Docket Center is 202–566–1744.
For additional information about EPA’s
public docket, visit https://www.epa.gov/
dockets.
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OW–2003–0026; FRL–10661–01–
OMS]
Agency Information Collection
Activities; Submission to the Office of
Management and Budget for Review
and Approval; Comment Request;
National Water Quality Inventory
Reports (Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) has submitted an
information collection request (ICR),
National Water Quality Inventory
Reports (EPA ICR Number 1560.13,
OMB Control Number 2040–0071) to the
Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act. This is a proposed 3year extension of the ICR, which is
currently approved through March 31,
2023. Public comments were previously
requested via the Federal Register on
July 19, 2022 during a 60-day comment
period. This notice allows for an
additional 30 days for public comments.
SUMMARY:
lotter on DSK11XQN23PROD with NOTICES1
Comments may be submitted on
or before March 10, 2023.
ADDRESSES: Submit your comments,
referencing Docket ID No. EPA–HQ–
2003–0026, to EPA online using
www.regulations.gov (our preferred
method), or by mail to: EPA Docket
Center, Environmental Protection
Agency, Mail Code 28221T, 1200
Pennsylvania Ave. NW, Washington, DC
20460.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute.
Submit written comments and
recommendations to OMB for the
proposed information collection within
30 days of publication of this notice to
www.reginfo.gov/public/do/PRAMain.
Find this particular information
collection by selecting ‘‘Currently under
30-day Review—Open for Public
Comments’’ or by using the search
function.
DATES:
VerDate Sep<11>2014
16:59 Feb 07, 2023
Jkt 259001
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
8281
Abstract: The Clean Water Act
Section 305(b) reports contain
information on whether waters assessed
by a state meet the state’s water quality
standards, and, when waters are
impaired, the pollutants and potential
sources affecting water quality. This
information helps states and the public
track progress in addressing water
pollution. Section 303(d) of the Clean
Water Act requires states to identify and
rank waters that cannot meet water
quality standards (WQS) following the
implementation of technology-based
controls. Under Section 303(d), states
are also required to establish total
maximum daily loads (TMDLs) for
listed waters not meeting standards
because of pollutant discharges. In
developing the Section 303(d) lists,
states are required to consider various
sources of water quality related data and
information, including the Section
305(b) state water quality reports.
Section 106(e) requires that states
annually update monitoring data and
use it in their Section 305(b) report.
Section 314(a) requires states to report
on the condition of their publicly
owned lakes within the Section 305(b)
report.
During the period covered by this ICR
renewal, respondents will: complete
their 2024 Section 305(b) reports and
2024 Section 303(d) lists; complete their
2026 Section 305(b) reports and 2026
Section 303(d) lists; transmit annual
electronic updates of ambient
monitoring data via the Water Quality
Exchange; and continue to develop
TMDLs according to their established
schedules. EPA will prepare biennial
updates on assessed and impaired
waters for Congress and the public for
the 2024 reporting cycle and for the
2026 cycle, and EPA will review 303(d)
list and TMDL submissions from
respondents.
Form Numbers: None.
Respondents/affected entities: States,
Territories and Tribes with Clean Water
Act (CWA) responsibilities.
Respondent’s obligation to respond:
Mandatory: Integrated Water Quality
Inventory Reports (Clean Water Act
Sections 305(b), 303(d), 314(a), and
106(e)).
Estimated number of respondents: 59
(total).
Frequency of response: Biennial.
Total estimated burden: 3,696,243
hours (per year). Burden is defined at 5
CFR 1320.03(b).
Total estimated cost: $243,597,191
(per year), includes $0 annualized
capital or operation & maintenance
costs.
Changes in Estimates: There is a
decrease of 10,944 hours in the total
E:\FR\FM\08FEN1.SGM
08FEN1
Agencies
[Federal Register Volume 88, Number 26 (Wednesday, February 8, 2023)]
[Notices]
[Pages 8279-8281]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-02637]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-40-000]
Viking Gas Transmission Company; Notice of Request Under Blanket
Authorization and Establishing Intervention and Protest Deadline
Take notice that on January 23, 2023, Viking Gas Transmission
Company (Viking) 100 West 5th Street, Tulsa, Oklahoma 74103, filed in
the above referenced docket, a prior notice request pursuant to
sections 157.205, 157.208 and 157.211 \1\ of the Federal Energy
Regulatory Commission's regulations under the Natural Gas Act (NGA) and
Viking's blanket certificate issued in Docket No. CP82-414-000,\2\
requesting authorization to construct, own, operate, and maintain a new
pipeline lateral to Grand Forks, North Dakota. Viking estimates the
cost of the lateral to be $26,940,000, as more fully described in the
application which is on file with the Commission and open to public
inspection.
---------------------------------------------------------------------------
\1\ 18 CFR157.205, 157.208, 157.211.
\2\ On September 1, 1982, in Docket No. CP82-414-000, Midwestern
Gas Transmission Company (Midwestern) was issued a blanket
certificate for its entire pipeline system, which was composed of
its Southern System, extending from Portland, Tennessee to Joliet,
Illinois, and its Northern System, extending from the United States-
Canada international boundary near Emerson, Minnesota to Marshfield,
Wisconsin. Midwestern Gas Transmission Co., 20 FERC ] 62,411 (1982).
Subsequently, on April 6, 1989, in Docket No. CP88-679-000, the
Commission authorized Midwestern's abandonment by transfer to Viking
and Viking's acquisition of Midwestern's Northern System. Midwestern
Gas Transmission Co., 47 FERC ] 61,017 (1989).
---------------------------------------------------------------------------
Specifically, Viking is proposing to build its Line MNB2204C (the
Project), in Polk County, Minnesota and Grand Forks County, North
Dakota. Viking proposes to: (i) construct 13.2 miles of 12-inch-
diameter lateral pipeline that runs from Viking's mainline to the East
Grand Forks, Minnesota Meter Station (MN Meter Station); (ii) construct
0.8 mile of 12-inch-diameter pipeline from the new Grand Forks, North
Dakota Launcher Site (ND Launcher Site) to a new meter station in Grand
Forks, North Dakota; and (iii) relocate and upsize a meter from the MN
Meter Station to the ND Launcher Site. Minor auxiliary facilities
installations and modifications will also be made pursuant to section
2.55(a) of the Commission's regulations.\3\ The Project will provide up
to 42,000 dekatherms per day (Dth/
[[Page 8280]]
d) of firm transportation service on Viking's system to a new delivery
point.
---------------------------------------------------------------------------
\3\ 18 CFR 2.55(a).
---------------------------------------------------------------------------
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov.) using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions concerning this application should be directed to
Denise Adams, Director, Regulatory Affairs ONEOK, Inc., 100 West 5th
Street, Tulsa, Oklahoma 74103, by telephone at (918) 732-1408, or by
email at [email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on April 3, 2023. How
to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\4\ any person \5\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\4\ 18 CFR 157.205.
\5\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\6\ and must be submitted by
the protest deadline, which is April 3, 2023. A protest may also serve
as a motion to intervene so long as the protestor states it also seeks
to be an intervenor.
---------------------------------------------------------------------------
\6\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \7\ and the regulations under the NGA \8\ by the
intervention deadline for the project, which is April 3, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\7\ 18 CFR 385.214.
\8\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before April 3, 2023. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP23-40-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \9\
---------------------------------------------------------------------------
\9\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
number CP23-40-000.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the following address: Kimberly D.
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at: Denise Adams,
Director, Regulatory Affairs, 100 West 5th Street, Tulsa, Oklahoma
74103, or by email at [email protected]. Any subsequent
submissions by an intervenor must be served on the applicant and all
other parties to the proceeding. Contact information for parties can be
downloaded from the
[[Page 8281]]
service list at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: February 2, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-02637 Filed 2-7-23; 8:45 am]