Texas Eastern Transmission, LP; Notice To Prepare an Environmental Assessment and Revised Schedule for Environmental Review of The Appalachia to Market II and Entriken HP Replacement Project, 7428-7429 [2023-02255]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 7428 Federal Register / Vol. 88, No. 23 / Friday, February 3, 2023 / Notices Docket Numbers: ER23–957–000. Applicants: Black Hills Colorado Electric, LLC. Description: § 205(d) Rate Filing: Revisions to OATT to Facilitate WEIS Market Integration to be effective 4/1/ 2023. Filed Date: 1/27/23. Accession Number: 20230127–5049. Comment Date: 5 p.m. ET 2/17/23. Docket Numbers: ER23–958–000. Applicants: Cheyenne Light, Fuel and Power Company. Description: § 205(d) Rate Filing: Revisions to OATT to Facilitate WEIS Market Integration to be effective 4/1/ 2023. Filed Date: 1/27/23. Accession Number: 20230127–5056. Comment Date: 5 p.m. ET 2/17/23. Docket Numbers: ER23–959–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 6154; Queue No. AE1–185 to be effective 12/31/9998. Filed Date: 1/27/23. Accession Number: 20230127–5060. Comment Date: 5 p.m. ET 2/17/23. Docket Numbers: ER23–960–000. Applicants: Public Service Company of Colorado. Description: § 205(d) Rate Filing: 2023–01–27 PSCo Entry into SPP WEIS Market to be effective 4/1/2023. Filed Date: 1/27/23. Accession Number: 20230127–5070. Comment Date: 5 p.m. ET 2/17/23. Docket Numbers: ER23–961–000. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: § 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: FP&L Interconnection Contract Amendment Filing to be effective 1/12/2023. Filed Date: 1/27/23. Accession Number: 20230127–5081. Comment Date: 5 p.m. ET 2/17/23. Docket Numbers: ER23–962–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 6116; Queue No. AE1–129 to be effective 12/31/9998. Filed Date: 1/27/23. Accession Number: 20230127–5084. Comment Date: 5 p.m. ET 2/17/23. Docket Numbers: ER23–963–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to WMPA, SA No. 4410; Queue No. Z2–077 to be effective 2/9/ 2016. VerDate Sep<11>2014 17:51 Feb 02, 2023 Jkt 259001 Filed Date: 1/27/23. Accession Number: 20230127–5154. Comment Date: 5 p.m. ET 2/17/23. Docket Numbers: ER23–964–000. Applicants: Florida Power & Light Company. Description: § 205(d) Rate Filing: FPL Variable Energy Resource Wheeling Transmission Service under the OATT to be effective 4/1/2023. Filed Date: 1/27/23. Accession Number: 20230127–5162. Comment Date: 5 p.m. ET 2/17/23. Docket Numbers: ER23–965–000. Applicants: Aragonne Wind LLC. Description: Compliance filing: Notice of Change in Status and Revised MarketBased Rate Tariff to be effective 1/28/ 2023. Filed Date: 1/27/23. Accession Number: 20230127–5170. Comment Date: 5 p.m. ET 2/17/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Certificate of Public Convenience and Necessity pursuant to Section 7(c) and Authorization pursuant to Section 7(b) of the Natural Gas Act to construct, operate, and abandon certain natural gas pipeline facilities. The proposed project is known as the Appalachian to Market II and Entriken HP Replacement Project (Project) and is designed to improve system reliability and to allow Texas Eastern to provide up to 55,000 dekatherms per day of firm natural gas transportation service to two local gas distribution companies in New Jersey. On August 19, 2022, the Federal Energy Regulatory Commission (FERC or Commission) issued a Notice of Intent (NOI) which identified July 14, 2023 as the issuance date for the final Environmental Impact Statement (EIS). However, Commission staff now intends to prepare an Environmental Assessment (EA) for the Project and has therefore revised the planned schedule for the completion of the environmental review.1 The August 19, 2022 NOI announced the opening of a 30-day scoping period which closed on September 19, 2022. Commission staff will consider the information gathered and comments received during scoping in the preparation of the EA; interested stakeholders do not need to resubmit comments previously submitted. Commission staff will make the EA available for public review and inspection, and solicit comments on the document from the public. The Commission will review and consider any future comments received on the EA in its consideration of the Project. This notice identifies the revised schedule for completion of the EA for Texas Eastern’s Project. Dated: January 27, 2023. Kimberly D. Bose, Secretary. Schedule for Environmental Review [FR Doc. 2023–02258 Filed 2–2–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Additional Information [Docket No. CP22–486–000] Texas Eastern Transmission, LP; Notice To Prepare an Environmental Assessment and Revised Schedule for Environmental Review of The Appalachia to Market II and Entriken HP Replacement Project On July 7, 2022, Texas Eastern, LP (Texas Eastern) filed an application in Docket No. CP22–486–000 requesting a PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 Issuance of the EA: February 10, 2023 90-day Federal Authorization Decision Deadline: 2 May 11, 2023 If a schedule change becomes necessary, an additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. In order to receive notification of the issuance of the EA and to keep track of 1 40 CFR 1501.10 (2020). Commission’s deadline applies to the decisions of other federal agencies, and state agencies acting under federally delegated authority, that are responsible for federal authorizations, permits, and other approvals necessary for proposed projects under the Natural Gas Act. Per 18 CFR 157.22(a), the Commission’s deadline for other agency’s decisions applies unless a schedule is otherwise established by federal law. 2 The E:\FR\FM\03FEN1.SGM 03FEN1 Federal Register / Vol. 88, No. 23 / Friday, February 3, 2023 / Notices all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ ferc-online/overview to register for eSubscription. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC website (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP22–486), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: January 27, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–02255 Filed 2–2–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP22–495–000] lotter on DSK11XQN23PROD with NOTICES1 Transcontinental Gas Pipe Line Company, LLC; Notice To Prepare an Environmental Assessment and Revised Schedule for Environmental Review of the Texas to Louisiana Energy Pathway Project On August 9, 2022, Transcontinental Gas Pipe Line Company, LLC (Transco) filed an application in Docket No. CP22–495–000 requesting a Certificate of Public Convenience and Necessity pursuant to Section 7(c) of the Natural Gas Act to construct and operate certain natural gas pipeline facilities. The proposed project is known as the Texas to Louisiana Energy Pathway Project (Project), and includes construction and operation of a new 15,900-horsepower compressor station in Fort Bend County, Texas; modification of six existing compressors at Compressor Station 40 in Hardin County, Texas; and programming updates at existing Compressor Station 23 in Victoria VerDate Sep<11>2014 17:51 Feb 02, 2023 Jkt 259001 County, Texas. The Project purpose is to increase the firm capacity of Transco’s system by 364,400 dekatherms per day (Dth/day). Transco would accomplish this through the conversion of 130,000 Dth/day from Transco’s ‘‘IT Feeder System’’ to firm capacity, the ‘‘turnback’’ of certain firm transportation capacity by customers of Transco, and incremental capacity as a result of Project construction. On November 16, 2022, the Federal Energy Regulatory Commission (FERC or Commission) issued a Notice of Intent to Prepare an Environmental Impact Statement for the Proposed Texas to Louisiana Energy Pathway Project, Request for Comments on Environmental Issues, Notice of Public Scoping Session, and Schedule for Environmental Review (Notice of Intent) which identified November 30, 2023 as the issuance date for the final Environmental Impact Statement (EIS). However, Commission staff now intends to prepare an Environmental Assessment (EA) for the Project and has therefore revised the planned schedule for the completion of the environmental review.1 The November 16, 2022 Notice of Intent announced the opening of a 30day scoping period which closed on December 16, 2022. Commission staff will consider the information gathered and comments received during scoping in the preparation of the EA; interested stakeholders do not need to resubmit comments previously submitted. Commission staff will make the EA available for public review and inspection, and solicit comments on the document from the public. The Commission will review and consider any future comments received on the EA in its consideration of the Project. This notice identifies the revised schedule for completion of the EA for Transco’s Project. Schedule for Environmental Review Issuance of the EA: June 9, 2023 90-day Federal Authorization Decision Deadline: 2 September 7, 2023 If a schedule change becomes necessary, an additional notice will be provided so that the relevant agencies are kept informed of the project’s progress. 1 40 CFR 1501.10 (2020) Commission’s deadline applies to the decisions of other federal agencies, and state agencies acting under federally delegated authority, that are responsible for federal authorizations, permits, and other approvals necessary for proposed projects under the Natural Gas Act. Per 18 CFR 157.22(a), the Commission’s deadline for other agency’s decisions applies unless a schedule is otherwise established by federal law. 2 The PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 7429 Additional Information In order to receive notification of the issuance of the EA and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ ferc-online/overview to register for eSubscription. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC website (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP22–495), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: January 27, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–02254 Filed 2–2–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP22–501–000] Transcontinental Gas Pipe Line Company, LLC; Notice To Prepare an Environmental Assessment and Revised Schedule for Environmental Review of the Southeast Energy Connector Project On August 22, 2022, Transcontinental Gas Pipe Line Company, LLC (Transco) filed an application in Docket No. CP22–501–000 requesting a Certificate of Public Convenience and Necessity pursuant to Section 7(c) of the Natural Gas Act to construct and operate certain natural gas pipeline facilities in Coosa and Chilton Counties, Alabama. The proposed project is known as the Southeast Energy Connector Project (Project) and would provide 150,000 dekatherms per day of natural gas transportation service to an existing E:\FR\FM\03FEN1.SGM 03FEN1

Agencies

[Federal Register Volume 88, Number 23 (Friday, February 3, 2023)]
[Notices]
[Pages 7428-7429]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-02255]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP22-486-000]


Texas Eastern Transmission, LP; Notice To Prepare an 
Environmental Assessment and Revised Schedule for Environmental Review 
of The Appalachia to Market II and Entriken HP Replacement Project

    On July 7, 2022, Texas Eastern, LP (Texas Eastern) filed an 
application in Docket No. CP22-486-000 requesting a Certificate of 
Public Convenience and Necessity pursuant to Section 7(c) and 
Authorization pursuant to Section 7(b) of the Natural Gas Act to 
construct, operate, and abandon certain natural gas pipeline 
facilities. The proposed project is known as the Appalachian to Market 
II and Entriken HP Replacement Project (Project) and is designed to 
improve system reliability and to allow Texas Eastern to provide up to 
55,000 dekatherms per day of firm natural gas transportation service to 
two local gas distribution companies in New Jersey.
    On August 19, 2022, the Federal Energy Regulatory Commission (FERC 
or Commission) issued a Notice of Intent (NOI) which identified July 
14, 2023 as the issuance date for the final Environmental Impact 
Statement (EIS). However, Commission staff now intends to prepare an 
Environmental Assessment (EA) for the Project and has therefore revised 
the planned schedule for the completion of the environmental review.\1\
---------------------------------------------------------------------------

    \1\ 40 CFR 1501.10 (2020).
---------------------------------------------------------------------------

    The August 19, 2022 NOI announced the opening of a 30-day scoping 
period which closed on September 19, 2022. Commission staff will 
consider the information gathered and comments received during scoping 
in the preparation of the EA; interested stakeholders do not need to 
resubmit comments previously submitted. Commission staff will make the 
EA available for public review and inspection, and solicit comments on 
the document from the public. The Commission will review and consider 
any future comments received on the EA in its consideration of the 
Project.
    This notice identifies the revised schedule for completion of the 
EA for Texas Eastern's Project.

Schedule for Environmental Review

Issuance of the EA: February 10, 2023
90-day Federal Authorization Decision Deadline: \2\ May 11, 2023
---------------------------------------------------------------------------

    \2\ The Commission's deadline applies to the decisions of other 
federal agencies, and state agencies acting under federally 
delegated authority, that are responsible for federal 
authorizations, permits, and other approvals necessary for proposed 
projects under the Natural Gas Act. Per 18 CFR 157.22(a), the 
Commission's deadline for other agency's decisions applies unless a 
schedule is otherwise established by federal law.

    If a schedule change becomes necessary, an additional notice will 
be provided so that the relevant agencies are kept informed of the 
Project's progress.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of

[[Page 7429]]

all formal issuances and submittals in specific dockets, the Commission 
offers a free service called eSubscription. This can reduce the amount 
of time you spend researching proceedings by automatically providing 
you with notification of these filings, document summaries, and direct 
links to the documents. Go to https://www.ferc.gov/ferc-online/overview 
to register for eSubscription.
    Additional information about the Project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select 
``General Search'' from the eLibrary menu, enter the selected date 
range and ``Docket Number'' excluding the last three digits (i.e., 
CP22-486), and follow the instructions. For assistance with access to 
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC 
website also provides access to the texts of formal documents issued by 
the Commission, such as orders, notices, and rule makings.

    Dated: January 27, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-02255 Filed 2-2-23; 8:45 am]
BILLING CODE 6717-01-P