Transcontinental Gas Pipe Line Company, LLC; Notice To Prepare an Environmental Assessment and Revised Schedule for Environmental Review of the Texas to Louisiana Energy Pathway Project, 7429 [2023-02254]
Download as PDF
Federal Register / Vol. 88, No. 23 / Friday, February 3, 2023 / Notices
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP22–486), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: January 27, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–02255 Filed 2–2–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–495–000]
lotter on DSK11XQN23PROD with NOTICES1
Transcontinental Gas Pipe Line
Company, LLC; Notice To Prepare an
Environmental Assessment and
Revised Schedule for Environmental
Review of the Texas to Louisiana
Energy Pathway Project
On August 9, 2022, Transcontinental
Gas Pipe Line Company, LLC (Transco)
filed an application in Docket No.
CP22–495–000 requesting a Certificate
of Public Convenience and Necessity
pursuant to Section 7(c) of the Natural
Gas Act to construct and operate certain
natural gas pipeline facilities. The
proposed project is known as the Texas
to Louisiana Energy Pathway Project
(Project), and includes construction and
operation of a new 15,900-horsepower
compressor station in Fort Bend County,
Texas; modification of six existing
compressors at Compressor Station 40
in Hardin County, Texas; and
programming updates at existing
Compressor Station 23 in Victoria
VerDate Sep<11>2014
17:51 Feb 02, 2023
Jkt 259001
County, Texas. The Project purpose is to
increase the firm capacity of Transco’s
system by 364,400 dekatherms per day
(Dth/day). Transco would accomplish
this through the conversion of 130,000
Dth/day from Transco’s ‘‘IT Feeder
System’’ to firm capacity, the
‘‘turnback’’ of certain firm
transportation capacity by customers of
Transco, and incremental capacity as a
result of Project construction.
On November 16, 2022, the Federal
Energy Regulatory Commission (FERC
or Commission) issued a Notice of
Intent to Prepare an Environmental
Impact Statement for the Proposed
Texas to Louisiana Energy Pathway
Project, Request for Comments on
Environmental Issues, Notice of Public
Scoping Session, and Schedule for
Environmental Review (Notice of Intent)
which identified November 30, 2023 as
the issuance date for the final
Environmental Impact Statement (EIS).
However, Commission staff now intends
to prepare an Environmental
Assessment (EA) for the Project and has
therefore revised the planned schedule
for the completion of the environmental
review.1
The November 16, 2022 Notice of
Intent announced the opening of a 30day scoping period which closed on
December 16, 2022. Commission staff
will consider the information gathered
and comments received during scoping
in the preparation of the EA; interested
stakeholders do not need to resubmit
comments previously submitted.
Commission staff will make the EA
available for public review and
inspection, and solicit comments on the
document from the public. The
Commission will review and consider
any future comments received on the
EA in its consideration of the Project.
This notice identifies the revised
schedule for completion of the EA for
Transco’s Project.
Schedule for Environmental Review
Issuance of the EA: June 9, 2023
90-day Federal Authorization Decision
Deadline: 2 September 7, 2023
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
1 40
CFR 1501.10 (2020)
Commission’s deadline applies to the
decisions of other federal agencies, and state
agencies acting under federally delegated authority,
that are responsible for federal authorizations,
permits, and other approvals necessary for
proposed projects under the Natural Gas Act. Per
18 CFR 157.22(a), the Commission’s deadline for
other agency’s decisions applies unless a schedule
is otherwise established by federal law.
2 The
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
7429
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP22–495), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: January 27, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–02254 Filed 2–2–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–501–000]
Transcontinental Gas Pipe Line
Company, LLC; Notice To Prepare an
Environmental Assessment and
Revised Schedule for Environmental
Review of the Southeast Energy
Connector Project
On August 22, 2022, Transcontinental
Gas Pipe Line Company, LLC (Transco)
filed an application in Docket No.
CP22–501–000 requesting a Certificate
of Public Convenience and Necessity
pursuant to Section 7(c) of the Natural
Gas Act to construct and operate certain
natural gas pipeline facilities in Coosa
and Chilton Counties, Alabama. The
proposed project is known as the
Southeast Energy Connector Project
(Project) and would provide 150,000
dekatherms per day of natural gas
transportation service to an existing
E:\FR\FM\03FEN1.SGM
03FEN1
Agencies
[Federal Register Volume 88, Number 23 (Friday, February 3, 2023)]
[Notices]
[Page 7429]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-02254]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP22-495-000]
Transcontinental Gas Pipe Line Company, LLC; Notice To Prepare an
Environmental Assessment and Revised Schedule for Environmental Review
of the Texas to Louisiana Energy Pathway Project
On August 9, 2022, Transcontinental Gas Pipe Line Company, LLC
(Transco) filed an application in Docket No. CP22-495-000 requesting a
Certificate of Public Convenience and Necessity pursuant to Section
7(c) of the Natural Gas Act to construct and operate certain natural
gas pipeline facilities. The proposed project is known as the Texas to
Louisiana Energy Pathway Project (Project), and includes construction
and operation of a new 15,900-horsepower compressor station in Fort
Bend County, Texas; modification of six existing compressors at
Compressor Station 40 in Hardin County, Texas; and programming updates
at existing Compressor Station 23 in Victoria County, Texas. The
Project purpose is to increase the firm capacity of Transco's system by
364,400 dekatherms per day (Dth/day). Transco would accomplish this
through the conversion of 130,000 Dth/day from Transco's ``IT Feeder
System'' to firm capacity, the ``turnback'' of certain firm
transportation capacity by customers of Transco, and incremental
capacity as a result of Project construction.
On November 16, 2022, the Federal Energy Regulatory Commission
(FERC or Commission) issued a Notice of Intent to Prepare an
Environmental Impact Statement for the Proposed Texas to Louisiana
Energy Pathway Project, Request for Comments on Environmental Issues,
Notice of Public Scoping Session, and Schedule for Environmental Review
(Notice of Intent) which identified November 30, 2023 as the issuance
date for the final Environmental Impact Statement (EIS). However,
Commission staff now intends to prepare an Environmental Assessment
(EA) for the Project and has therefore revised the planned schedule for
the completion of the environmental review.\1\
---------------------------------------------------------------------------
\1\ 40 CFR 1501.10 (2020)
---------------------------------------------------------------------------
The November 16, 2022 Notice of Intent announced the opening of a
30-day scoping period which closed on December 16, 2022. Commission
staff will consider the information gathered and comments received
during scoping in the preparation of the EA; interested stakeholders do
not need to resubmit comments previously submitted. Commission staff
will make the EA available for public review and inspection, and
solicit comments on the document from the public. The Commission will
review and consider any future comments received on the EA in its
consideration of the Project.
This notice identifies the revised schedule for completion of the
EA for Transco's Project.
Schedule for Environmental Review
Issuance of the EA: June 9, 2023
90-day Federal Authorization Decision Deadline: \2\ September 7, 2023
---------------------------------------------------------------------------
\2\ The Commission's deadline applies to the decisions of other
federal agencies, and state agencies acting under federally
delegated authority, that are responsible for federal
authorizations, permits, and other approvals necessary for proposed
projects under the Natural Gas Act. Per 18 CFR 157.22(a), the
Commission's deadline for other agency's decisions applies unless a
schedule is otherwise established by federal law.
If a schedule change becomes necessary, an additional notice will
be provided so that the relevant agencies are kept informed of the
project's progress.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP22-495), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC
website also provides access to the texts of formal documents issued by
the Commission, such as orders, notices, and rule makings.
Dated: January 27, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-02254 Filed 2-2-23; 8:45 am]
BILLING CODE 6717-01-P