Freedom Falls, LLC; TLK Real Estate Holdings, LLC; Notice of Transfer of Exemption, 6720 [2023-02088]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 6720 Federal Register / Vol. 88, No. 21 / Wednesday, February 1, 2023 / Notices Description: § 205(d) Rate Filing: West Penn Power Company submits tariff filing per 35.13(a)(2)(iii: WPP submits Borderline Service Agreement, SA No. 6623 with Penn Power to be effective 3/ 29/2023. Filed Date: 1/26/23. Accession Number: 20230126–5057. Comment Date: 5 p.m. ET 2/16/23. Docket Numbers: ER23–940–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to WMPA, Service Agreement No. 5294; Queue No. AC2– 120 to be effective 12/31/9998. Filed Date: 1/26/23. Accession Number: 20230126–5065. Comment Date: 5 p.m. ET 2/16/23. Docket Numbers: ER23–941–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2023–01–26 Interconnection Process Enhancements—Phase 2 to be effective 3/28/2023. Filed Date: 1/26/23. Accession Number: 20230126–5075. Comment Date: 5 p.m. ET 2/16/23. Docket Numbers: ER23–942–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: Section 205 filing to add NP&S to WDT3 Model to be effective 3/28/2023. Filed Date: 1/26/23. Accession Number: 20230126–5076. Comment Date: 5 p.m. ET 2/16/23. Docket Numbers: ER23–943–000. Applicants: Pacific Gas and Electric Company. Description: Tariff Amendment: Termination of Malaga Power, LLC (TO SA 57) to be effective 1/3/2023. Filed Date: 1/26/23. Accession Number: 20230126–5085. Comment Date: 5 p.m. ET 2/16/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For VerDate Sep<11>2014 21:04 Jan 31, 2023 Jkt 259001 other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 26, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–02086 Filed 1–31–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14421–004] Freedom Falls, LLC; TLK Real Estate Holdings, LLC; Notice of Transfer of Exemption 1. On January 3, 2023, Freedom Falls, LLC, exemptee for the 50-kilowatt Freedom Falls Hydroelectric Project No. 14421, filed a letter notifying the Commission that the project was transferred from Freedom Falls, LLC to TLK Real Estate Holdings, LLC. The exemption from licensing was originally issued on March 25, 2013.1 The project is located on Sandy Stream, Waldo County, Maine. The transfer of an exemption does not require Commission approval. 2. TLK Real Estate Holdings, LLC is now the exemptee of the Freedom Falls Hydroelectric Project No. 14421. All correspondence must be forwarded to Mr. Michael Dutton, Member, TLK Real Estate Holdings, LLC, 22 Mill Street, Freedom, ME 04941, Phone: 646–696– 0302, Email: michael@ findthelostkitchen.com. Dated: January 26, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–02088 Filed 1–31–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2397–033] Green Mountain Power Corporation; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Capacity Amendment. b. Project No: P–2397–033. 1 Freedom PO 00000 Falls, LLC, 142 FERC ¶ 62,243 (2013). Frm 00025 Fmt 4703 Sfmt 4703 c. Date Filed: November 22, 2022. d. Applicant: Green Mountain Power Corporation. e. Name of Project: Gage Project. f. Location: The project is located on the Passumpsic River, near the town of St. Johnsbury, Caledonia County, Vermont. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Will Brown, Green Mountain Power Corporation, 2152 Post Road, Rutland, Vermont 05701, (802) 598–6402. i. FERC Contact: Zeena Aljibury, (202) 502–6065, zeena.aljibury@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include the docket number P–2397–033. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The applicant requests a license amendment E:\FR\FM\01FEN1.SGM 01FEN1

Agencies

[Federal Register Volume 88, Number 21 (Wednesday, February 1, 2023)]
[Notices]
[Page 6720]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-02088]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14421-004]


Freedom Falls, LLC; TLK Real Estate Holdings, LLC; Notice of 
Transfer of Exemption

    1. On January 3, 2023, Freedom Falls, LLC, exemptee for the 50-
kilowatt Freedom Falls Hydroelectric Project No. 14421, filed a letter 
notifying the Commission that the project was transferred from Freedom 
Falls, LLC to TLK Real Estate Holdings, LLC. The exemption from 
licensing was originally issued on March 25, 2013.\1\ The project is 
located on Sandy Stream, Waldo County, Maine. The transfer of an 
exemption does not require Commission approval.
---------------------------------------------------------------------------

    \1\ Freedom Falls, LLC, 142 FERC ] 62,243 (2013).
---------------------------------------------------------------------------

    2. TLK Real Estate Holdings, LLC is now the exemptee of the Freedom 
Falls Hydroelectric Project No. 14421. All correspondence must be 
forwarded to Mr. Michael Dutton, Member, TLK Real Estate Holdings, LLC, 
22 Mill Street, Freedom, ME 04941, Phone: 646-696-0302, Email: 
[email protected].

    Dated: January 26, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-02088 Filed 1-31-23; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.