Allete, Inc.; Notice of Intent To Prepare an Environmental Assessment, 6250 [2023-01935]
Download as PDF
6250
Federal Register / Vol. 88, No. 20 / Tuesday, January 31, 2023 / Notices
Description: Athens Energy Storage
LLC Requests Prospective, Limited
Tariff Waiver of Attachment S of the
New York Independent System Operator
Inc. OATT.
Filed Date: 1/20/23.
Accession Number: 20230120–5173.
Comment Date: 5 p.m. ET 1/27/23.
Docket Numbers: ER23–917–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2023–01–20_Submittal of Schedule 43L
Lakefront 9 SSR Cost Allocation to be
effective 2/1/2023.
Filed Date: 1/20/23.
Accession Number: 20230120–5185.
Comment Date: 5 p.m. ET 2/10/23.
Take notice that the Commission
received the following public utility
holding company filings:
khammond on DSKJM1Z7X2PROD with NOTICES
Docket Numbers: PH23–2–000.
Applicants: BlackRock, Inc.
Description: BlackRock, Inc. submits
FERC–65A Notice of Material Change in
Fact to Waiver Notification.
Filed Date: 1/20/23.
Accession Number: 20230120–5108.
Comment Date: 5 p.m. ET 2/10/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 20, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–01946 Filed 1–30–23; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:46 Jan 30, 2023
Jkt 259001
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. ER23–884–000]
[Project No. 2362–044]
Allete, Inc.; Notice of Intent To Prepare
an Environmental Assessment
On December 20, 2021, Allete, Inc.
filed a relicense application for the 2.1megawatt Grand Rapids Hydroelectric
Project No. 2362 (project). The project is
located on the Mississippi River near
the City of Grand Rapids in Itasca
County, Minnesota. The project does not
occupy Federal land.
In accordance with the Commission’s
regulations, on October 28, 2022,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA notice). Based on the
information in the record, staff does not
anticipate that licensing the project
would constitute a major Federal action
significantly affecting the quality of the
human environment. Therefore, staff
intends to prepare an Environmental
Assessment (EA) on the application to
relicense the project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Target date
Commission issues EA ............
Comments on EA .....................
August 2023.1
September 2023.
Any questions regarding this notice
may be directed to Laura Washington at
laura.washington@ferc.gov or (202) 502–
6072.
Dated: January 25, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–01935 Filed 1–30–23; 8:45 am]
BILLING CODE 6717–01–P
1 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) require that
EAs be completed within 1 year of the Federal
action agency’s decision to prepare an EA. This
notice establishes the Commission’s intent to
prepare an EA for the Grand Rapids Project.
Therefore, in accordance with CEQ’s regulations,
the EA must be issued within 1 year of the issuance
date of this notice.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
Sonoran Solar Energy, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Sonoran
Solar Energy, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is February 9,
2023.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
E:\FR\FM\31JAN1.SGM
31JAN1
Agencies
[Federal Register Volume 88, Number 20 (Tuesday, January 31, 2023)]
[Notices]
[Page 6250]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-01935]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2362-044]
Allete, Inc.; Notice of Intent To Prepare an Environmental
Assessment
On December 20, 2021, Allete, Inc. filed a relicense application
for the 2.1-megawatt Grand Rapids Hydroelectric Project No. 2362
(project). The project is located on the Mississippi River near the
City of Grand Rapids in Itasca County, Minnesota. The project does not
occupy Federal land.
In accordance with the Commission's regulations, on October 28,
2022, Commission staff issued a notice that the project was ready for
environmental analysis (REA notice). Based on the information in the
record, staff does not anticipate that licensing the project would
constitute a major Federal action significantly affecting the quality
of the human environment. Therefore, staff intends to prepare an
Environmental Assessment (EA) on the application to relicense the
project.
The EA will be issued and circulated for review by all interested
parties. All comments filed on the EA will be analyzed by staff and
considered in the Commission's final licensing decision.
The application will be processed according to the following
schedule. Revisions to the schedule may be made as appropriate.
---------------------------------------------------------------------------
\1\ The Council on Environmental Quality's (CEQ) regulations
under 40 CFR 1501.10(b)(1) require that EAs be completed within 1
year of the Federal action agency's decision to prepare an EA. This
notice establishes the Commission's intent to prepare an EA for the
Grand Rapids Project. Therefore, in accordance with CEQ's
regulations, the EA must be issued within 1 year of the issuance
date of this notice.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Commission issues EA................... August 2023.\1\
Comments on EA......................... September 2023.
------------------------------------------------------------------------
Any questions regarding this notice may be directed to Laura
Washington at [email protected] or (202) 502-6072.
Dated: January 25, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-01935 Filed 1-30-23; 8:45 am]
BILLING CODE 6717-01-P