Allete, Inc.; Notice of Intent To Prepare an Environmental Assessment, 6250 [2023-01935]

Download as PDF 6250 Federal Register / Vol. 88, No. 20 / Tuesday, January 31, 2023 / Notices Description: Athens Energy Storage LLC Requests Prospective, Limited Tariff Waiver of Attachment S of the New York Independent System Operator Inc. OATT. Filed Date: 1/20/23. Accession Number: 20230120–5173. Comment Date: 5 p.m. ET 1/27/23. Docket Numbers: ER23–917–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2023–01–20_Submittal of Schedule 43L Lakefront 9 SSR Cost Allocation to be effective 2/1/2023. Filed Date: 1/20/23. Accession Number: 20230120–5185. Comment Date: 5 p.m. ET 2/10/23. Take notice that the Commission received the following public utility holding company filings: khammond on DSKJM1Z7X2PROD with NOTICES Docket Numbers: PH23–2–000. Applicants: BlackRock, Inc. Description: BlackRock, Inc. submits FERC–65A Notice of Material Change in Fact to Waiver Notification. Filed Date: 1/20/23. Accession Number: 20230120–5108. Comment Date: 5 p.m. ET 2/10/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 20, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–01946 Filed 1–30–23; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 16:46 Jan 30, 2023 Jkt 259001 DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. ER23–884–000] [Project No. 2362–044] Allete, Inc.; Notice of Intent To Prepare an Environmental Assessment On December 20, 2021, Allete, Inc. filed a relicense application for the 2.1megawatt Grand Rapids Hydroelectric Project No. 2362 (project). The project is located on the Mississippi River near the City of Grand Rapids in Itasca County, Minnesota. The project does not occupy Federal land. In accordance with the Commission’s regulations, on October 28, 2022, Commission staff issued a notice that the project was ready for environmental analysis (REA notice). Based on the information in the record, staff does not anticipate that licensing the project would constitute a major Federal action significantly affecting the quality of the human environment. Therefore, staff intends to prepare an Environmental Assessment (EA) on the application to relicense the project. The EA will be issued and circulated for review by all interested parties. All comments filed on the EA will be analyzed by staff and considered in the Commission’s final licensing decision. The application will be processed according to the following schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Commission issues EA ............ Comments on EA ..................... August 2023.1 September 2023. Any questions regarding this notice may be directed to Laura Washington at laura.washington@ferc.gov or (202) 502– 6072. Dated: January 25, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–01935 Filed 1–30–23; 8:45 am] BILLING CODE 6717–01–P 1 The Council on Environmental Quality’s (CEQ) regulations under 40 CFR 1501.10(b)(1) require that EAs be completed within 1 year of the Federal action agency’s decision to prepare an EA. This notice establishes the Commission’s intent to prepare an EA for the Grand Rapids Project. Therefore, in accordance with CEQ’s regulations, the EA must be issued within 1 year of the issuance date of this notice. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 Sonoran Solar Energy, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Sonoran Solar Energy, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is February 9, 2023. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the E:\FR\FM\31JAN1.SGM 31JAN1

Agencies

[Federal Register Volume 88, Number 20 (Tuesday, January 31, 2023)]
[Notices]
[Page 6250]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-01935]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2362-044]


Allete, Inc.; Notice of Intent To Prepare an Environmental 
Assessment

    On December 20, 2021, Allete, Inc. filed a relicense application 
for the 2.1-megawatt Grand Rapids Hydroelectric Project No. 2362 
(project). The project is located on the Mississippi River near the 
City of Grand Rapids in Itasca County, Minnesota. The project does not 
occupy Federal land.
    In accordance with the Commission's regulations, on October 28, 
2022, Commission staff issued a notice that the project was ready for 
environmental analysis (REA notice). Based on the information in the 
record, staff does not anticipate that licensing the project would 
constitute a major Federal action significantly affecting the quality 
of the human environment. Therefore, staff intends to prepare an 
Environmental Assessment (EA) on the application to relicense the 
project.
    The EA will be issued and circulated for review by all interested 
parties. All comments filed on the EA will be analyzed by staff and 
considered in the Commission's final licensing decision.
    The application will be processed according to the following 
schedule. Revisions to the schedule may be made as appropriate.
---------------------------------------------------------------------------

    \1\ The Council on Environmental Quality's (CEQ) regulations 
under 40 CFR 1501.10(b)(1) require that EAs be completed within 1 
year of the Federal action agency's decision to prepare an EA. This 
notice establishes the Commission's intent to prepare an EA for the 
Grand Rapids Project. Therefore, in accordance with CEQ's 
regulations, the EA must be issued within 1 year of the issuance 
date of this notice.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Commission issues EA...................  August 2023.\1\
Comments on EA.........................  September 2023.
------------------------------------------------------------------------

    Any questions regarding this notice may be directed to Laura 
Washington at [email protected] or (202) 502-6072.

    Dated: January 25, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-01935 Filed 1-30-23; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.