Allete, Inc.; Notice of Intent To Prepare an Environmental Assessment, 6255 [2023-01933]

Download as PDF Federal Register / Vol. 88, No. 20 / Tuesday, January 31, 2023 / Notices Applicants: Pine Prairie Energy Center, LLC. Description: § 4(d) Rate Filing: Pine Prairie Energy Center, LLC Revisions to FERC Gas Tariff to be effective 2/21/ 2023. Filed Date: 1/20/23. Accession Number: 20230120–5058. Comment Date: 5 p.m. ET 2/1/23. Docket Numbers: RP23–365–000. Applicants: Perryville Gas Storage LLC. Description: § 4(d) Rate Filing: Perryville Gas Storage LLC Revisions to FERC Gas Tariff to be effective 2/21/ 2023. Filed Date: 1/20/23. Accession Number: 20230120–5060. Comment Date: 5 p.m. ET 2/1/23. Docket Numbers: RP23–366–000. Applicants: Cadeville Gas Storage LLC. Description: § 4(d) Rate Filing: Cadeville Gas Storage LLC Revisions to FERC Gas Tariff to be effective 2/21/ 2023. Filed Date: 1/20/23. Accession Number: 20230120–5061. Comment Date: 5 p.m. ET 2/1/23. khammond on DSKJM1Z7X2PROD with NOTICES Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 20, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–01945 Filed 1–30–23; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 16:46 Jan 30, 2023 Jkt 259001 DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission 6255 [Docket No. IN13–15–000] [Project No. 2361–056] Allete, Inc.; Notice of Intent To Prepare an Environmental Assessment On December 20, 2021, Allete, Inc. filed a relicense application for the 1.1megawatt Prairie River Project No. 2361 (project). The project is located On the Prairie River, near the Township of Arbo in Itasca County, Minnesota. The project does not occupy Federal land. In accordance with the Commission’s regulations, on October 28, 2022, Commission staff issued a notice that the project was ready for environmental analysis (REA notice). Based on the information in the record, staff does not anticipate that licensing the project would constitute a major Federal action significantly affecting the quality of the human environment. Therefore, staff intends to prepare an Environmental Assessment (EA) on the application to relicense the project. The EA will be issued and circulated for review by all interested parties. All comments filed on the EA will be analyzed by staff and considered in the Commission’s final licensing decision. The application will be processed according to the following schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Commission issues EA ............ Comments on EA ..................... August 2023.1 September 2023. Any questions regarding this notice may be directed to Laura Washington at laura.washington@ferc.gov or (202) 502– 6072. Dated: January 25, 2023. Kimberly D. Bose, Secretary. BILLING CODE 6717–01–P 1 The Council on Environmental Quality’s (CEQ) regulations under 40 CFR 1501.10(b)(1) require that EAs be completed within 1 year of the Federal action agency’s decision to prepare an EA. This notice establishes the Commission’s intent to prepare an EA for the Prairie River Project. Therefore, in accordance with CEQ’s regulations, the EA must be issued within 1 year of the issuance date of this notice. Frm 00033 Fmt 4703 Sfmt 4703 With respect to orders issued by the Commission in the above-captioned docket, with the exceptions noted below, the staff of the Office of Enforcement are designated as nondecisional in deliberations by the Commission in this docket. Accordingly, pursuant to 18 CFR 385.2202 (2022), they will not serve as advisors to the Commission or take part in the Commission’s review of any offer of settlement. Likewise, as nondecisional staff, pursuant to 18 CFR 385.2201 (2022), they are prohibited from communicating with advisory staff concerning any deliberations in this docket. Exceptions to this designation as nondecisional are: Grace Kwon Laura Vallance Jennifer Gordon Joseph Cleaver Dated: January 20, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–01929 Filed 1–30–23; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [FRL–10592–01–OA] Request for Nominations to the EPA Science Advisory Board Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The U.S. Environmental Protection Agency (EPA) invites nominations of scientific experts from a diverse range of disciplines to be considered for appointment to the EPA Science Advisory Board (SAB). Appointments will be announced by the Administrator. DATES: Nominations should be submitted in time to arrive no later than March 2, 2023. FOR FURTHER INFORMATION CONTACT: For information about the chartered SAB membership, appointment process, and schedule, please contact Dr. Suhair SUMMARY: [FR Doc. 2023–01933 Filed 1–30–23; 8:45 am] PO 00000 BP America Inc., BP Corporation North America Inc., BP America Production Company, BP Energy Company; Updated Notice of Designation of Commission Staff as Non-Decisional E:\FR\FM\31JAN1.SGM 31JAN1

Agencies

[Federal Register Volume 88, Number 20 (Tuesday, January 31, 2023)]
[Notices]
[Page 6255]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-01933]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2361-056]


Allete, Inc.; Notice of Intent To Prepare an Environmental 
Assessment

    On December 20, 2021, Allete, Inc. filed a relicense application 
for the 1.1-megawatt Prairie River Project No. 2361 (project). The 
project is located On the Prairie River, near the Township of Arbo in 
Itasca County, Minnesota. The project does not occupy Federal land.
    In accordance with the Commission's regulations, on October 28, 
2022, Commission staff issued a notice that the project was ready for 
environmental analysis (REA notice). Based on the information in the 
record, staff does not anticipate that licensing the project would 
constitute a major Federal action significantly affecting the quality 
of the human environment. Therefore, staff intends to prepare an 
Environmental Assessment (EA) on the application to relicense the 
project.
    The EA will be issued and circulated for review by all interested 
parties. All comments filed on the EA will be analyzed by staff and 
considered in the Commission's final licensing decision.
    The application will be processed according to the following 
schedule. Revisions to the schedule may be made as appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Commission issues EA...................  August 2023.\1\
Comments on EA.........................  September 2023.
------------------------------------------------------------------------

    Any questions regarding this notice may be directed to Laura 
Washington at [email protected] or (202) 502-6072.
---------------------------------------------------------------------------

    \1\ The Council on Environmental Quality's (CEQ) regulations 
under 40 CFR 1501.10(b)(1) require that EAs be completed within 1 
year of the Federal action agency's decision to prepare an EA. This 
notice establishes the Commission's intent to prepare an EA for the 
Prairie River Project. Therefore, in accordance with CEQ's 
regulations, the EA must be issued within 1 year of the issuance 
date of this notice.

    Dated: January 25, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-01933 Filed 1-30-23; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.