Premium Energy Holdings, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 4992 [2023-01489]
Download as PDF
4992
Federal Register / Vol. 88, No. 17 / Thursday, January 26, 2023 / Notices
gpa_director.pdf and https://iris.ed.gov/
iris/pdfs/gpa_participant.pdf.
VII. Other Information
Accessible Format: On request to the
program contact person listed under FOR
FURTHER INFORMATION CONTACT,
individuals with disabilities can obtain
this document and a copy of the
application package in an accessible
format. The Department will provide the
requestor with an accessible format that
may include Rich Text Format (RTF) or
text format (txt), a thumb drive, an MP3
file, braille, large print, audiotape, or
compact disc, or other accessible format.
Electronic Access to This Document:
The official version of this document is
the document published in the Federal
Register. You may access the official
edition of the Federal Register and the
Code of Federal Regulations at
www.govinfo.gov. At this site you can
view this document, as well as all other
documents of this Department
published in the Federal Register, in
text or Portable Document Format
(PDF). To use PDF you must have
Adobe Acrobat Reader, which is
available free at the site.
You may also access documents of the
Department published in the Federal
Register by using the article search
feature at www.federalregister.gov.
Specifically, through the advanced
search feature at this site, you can limit
your search to documents published by
the Department.
Nasser H. Paydar,
Assistant Secretary for Postsecondary
Education.
[FR Doc. 2023–01585 Filed 1–25–23; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15271–000]
lotter on DSK11XQN23PROD with NOTICES1
Premium Energy Holdings, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 31, 2022, Premium Energy
Holdings, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Twitchell Pumped Storage Hydro
Project to be located approximately 6
miles northeast of Santa Maria,
California in the limits between San
Luis Obispo and Santa Barbara
Counties. The sole purpose of a
VerDate Sep<11>2014
17:17 Jan 25, 2023
Jkt 259001
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) a new upper reservoir
located either, on the western side of the
Sierra Madre Mountains in Santa
Barbara County, California, with a
maximum elevation of 1,788 feet
average mean sea level, with a surface
area of 72 acres and a storage capacity
of 7,150 acre-feet (alternative 1), or a
new reservoir 0.5 mile west of Twitchell
Lake with a maximum elevation of
1,296 feet average mean sea level, with
a surface area of 83 acres and a storage
capacity of 11,400 acre-feet (alternative
2); (2) an existing lower reservoir
(Twitchell Reservoir), with an elevation
of 592 feet average mean sea level, a
surface area of approximately 400 acres
and a storage capacity of 197,756 acrefeet; (3) either a 0.32-mile-long headrace
tunnel, 0.07-mile-long vertical shaft,
2.20-mile-long horizontal tunnel, 0.03mile-long penstock, and 0.46-mile-long
tailrace tunnel (alternative A), or a 0.16mile-long headrace tunnel, 0.04-milelong vertical shaft, 1.10-mile-long
horizontal tunnel, 0.02-mile-long
penstock, and 0.23-mile long tailrace
tunnel (alternative B) connecting the
reservoirs to the powerhouse, with a
maximum head of 704 or 1,196 feet
depending on the selected upper
reservoir; (4) either a new 9-mile-long
230-kilovolt (kV) line and 2.5 miles of
SCE’s existing right of way that will
interconnect the project with the
existing PG&E transmission system at
the Mesa Substation (alternative 1), or a
230-kV line that would be installed that
would interconnect at a future
substation that would be a part of the
Central California Power Connect
project (alternative 2); (5) a new
powerhouse that would house 4 new
pump-turbines rated at 150 megawatts
each; (6) a new substation installed on
the northern or southern side of the
Twitchell Reservoir depending on the
upper reservoir alternatives, close to the
powerhouse; and (7) appurtenant
facilities. The estimated annual power
generation at the Twitchell Pumped
Storage Project would be 1,200,000
megawatt-hours.
Applicant Contact: Victor M. Rojas,
Managing Director, Premium Energy
Holdings, LLC. 355 South Lemon Ave.,
Suite A, Walnut, California 91789;
phone: (909) 595–5314; victor.rojas@
pehllc.net.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
FERC Contact: Benjamin Mann; email:
benjamin.mann@ferc.gov; phone: (202)
502–8127.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
ferconline.ferc.gov/eFiling.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support. In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–15271.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–15271) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: January 19, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–01489 Filed 1–25–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2354–166]
Georgia Power Company; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
E:\FR\FM\26JAN1.SGM
26JAN1
Agencies
[Federal Register Volume 88, Number 17 (Thursday, January 26, 2023)]
[Notices]
[Page 4992]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-01489]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15271-000]
Premium Energy Holdings, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 31, 2022, Premium Energy Holdings, LLC filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Twitchell Pumped Storage Hydro Project to be located approximately 6
miles northeast of Santa Maria, California in the limits between San
Luis Obispo and Santa Barbara Counties. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would consist of the following: (1) a new
upper reservoir located either, on the western side of the Sierra Madre
Mountains in Santa Barbara County, California, with a maximum elevation
of 1,788 feet average mean sea level, with a surface area of 72 acres
and a storage capacity of 7,150 acre-feet (alternative 1), or a new
reservoir 0.5 mile west of Twitchell Lake with a maximum elevation of
1,296 feet average mean sea level, with a surface area of 83 acres and
a storage capacity of 11,400 acre-feet (alternative 2); (2) an existing
lower reservoir (Twitchell Reservoir), with an elevation of 592 feet
average mean sea level, a surface area of approximately 400 acres and a
storage capacity of 197,756 acre-feet; (3) either a 0.32-mile-long
headrace tunnel, 0.07-mile-long vertical shaft, 2.20-mile-long
horizontal tunnel, 0.03-mile-long penstock, and 0.46-mile-long tailrace
tunnel (alternative A), or a 0.16-mile-long headrace tunnel, 0.04-mile-
long vertical shaft, 1.10-mile-long horizontal tunnel, 0.02-mile-long
penstock, and 0.23-mile long tailrace tunnel (alternative B) connecting
the reservoirs to the powerhouse, with a maximum head of 704 or 1,196
feet depending on the selected upper reservoir; (4) either a new 9-
mile-long 230-kilovolt (kV) line and 2.5 miles of SCE's existing right
of way that will interconnect the project with the existing PG&E
transmission system at the Mesa Substation (alternative 1), or a 230-kV
line that would be installed that would interconnect at a future
substation that would be a part of the Central California Power Connect
project (alternative 2); (5) a new powerhouse that would house 4 new
pump-turbines rated at 150 megawatts each; (6) a new substation
installed on the northern or southern side of the Twitchell Reservoir
depending on the upper reservoir alternatives, close to the powerhouse;
and (7) appurtenant facilities. The estimated annual power generation
at the Twitchell Pumped Storage Project would be 1,200,000 megawatt-
hours.
Applicant Contact: Victor M. Rojas, Managing Director, Premium
Energy Holdings, LLC. 355 South Lemon Ave., Suite A, Walnut, California
91789; phone: (909) 595-5314; [email protected].
FERC Contact: Benjamin Mann; email: [email protected]; phone:
(202) 502-8127.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments
up to 6,000 characters, without prior registration, using the eComment
system at https://ferconline.ferc.gov/QuickComment.aspx. You must
include your name and contact information at the end of your comments.
For assistance, please contact FERC Online Support. In lieu of
electronic filing, you may submit a paper copy. Submissions sent via
the U.S. Postal Service must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Room 1A, Washington, DC 20426. Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.
The first page of any filing should include docket number P-15271.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-15271) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: January 19, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-01489 Filed 1-25-23; 8:45 am]
BILLING CODE 6717-01-P