Eagle Creek Racine Hydro, LLC; Notice of Intent To Prepare an Environmental Assessment, 4175 [2023-01320]
Download as PDF
Federal Register / Vol. 88, No. 15 / Tuesday, January 24, 2023 / Notices
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: January 18, 2023.
Kimberly D. Bose,
Secretary.
Milestone
Target date
Comments on EA .................
August 2023.
1 The
Council on Environmental Quality’s
(CEQ)
regulations
under
40
CFR
1501.10(b)(1) require that EAs be completed
within 1 year of the federal action agency’s
decision to prepare an EA. This notice establishes the Commission’s intent to prepare an
EA for the Racine Hydroelectric Project.
Therefore, in accordance with CEQ’s regulations, the EA must be issued within 1 year of
the issuance date of this notice.
Any questions regarding this notice
may be directed to Jay Summers at (202)
502–8764 or jay.summers@ferc.gov.
Dated: January 18, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–01318 Filed 1–23–23; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2023–01320 Filed 1–23–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2570–034]
tkelley on DSK125TN23PROD with NOTICES
Eagle Creek Racine Hydro, LLC; Notice
of Intent To Prepare an Environmental
Assessment
On November 30, 2021, Eagle Creek
Racine Hydro, LLC filed a relicense
application for the 47.5-megawatt
Racine Hydroelectric Project No. 2570
(Racine Project). The Racine Project is
located at the U.S. Army Corps of
Engineers’ (Corps) Racine Locks and
Dam on the Ohio River near the Town
of Racine in Meigs County, Ohio. The
project occupies 27.99 acres of federal
land administered by the Corps.
In accordance with the Commission’s
regulations, on November 1, 2022,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA Notice). Based on the
information in the record, including
comments filed on the REA Notice, staff
does not anticipate that relicensing the
project would constitute a major federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare an
Environmental Assessment (EA) on the
application to relicense the project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Commission issues EA ........
VerDate Sep<11>2014
19:17 Jan 23, 2023
Target date
July 2023.1
Jkt 259001
[Docket No. IC22–32–000]
Commission Information Collection
Activities (FERC–551) Comment
Request; Extension
Federal Energy Regulatory
Commission, DOE.
ACTION: Notice of information collection
and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on a renewal of
currently approved information
collection, FERC–551, (Reporting of
Flow Volume and Capacity by Interstate
Natural Gas Pipelines), which will be
submitted to the Office of Management
and Budget (OMB) for review. No
Comments were received on the 60-day
notice published on September 29,
2022.
DATES: Comments on the collection of
information are due February 23, 2023.
ADDRESSES: Send written comments on
FERC–551 to OMB through
www.reginfo.gov/public/do/PRAMain.
Attention: Federal Energy Regulatory
Commission Desk Officer. Please
identify the OMB Control Number
(1902–0243) in the subject line of your
comments. Comments should be sent
within 30 days of publication of this
notice to www.reginfo.gov/public/do/
PRAMain.
Please submit copies of your
comments to the Commission. You may
submit copies of your comments
SUMMARY:
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
4175
(identified by Docket No. IC22–32–000)
by one of the following methods:
Electronic filing through https://
www.ferc.gov, is preferred.
• Electronic Filing: Documents must
be filed in acceptable native
applications and print-to-PDF, but not
in scanned or picture format.
• For those unable to file
electronically, comments may be filed
by USPS mail or by hand (including
courier) delivery.
Æ Mail via U.S. Postal Service Only:
Addressed to: Federal Energy
Regulatory Commission, Secretary of the
Commission, 888 First Street NE,
Washington, DC 20426.
Æ Hand (Including Courier) Delivery:
Deliver to: Federal Energy Regulatory
Commission, Secretary of the
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852.
Instructions: OMB submissions must
be formatted and filed in accordance
with submission guidelines at
www.reginfo.gov/public/do/PRAMain.
Using the search function under the
‘‘Currently Under Review’’ field, select
Federal Energy Regulatory Commission;
click ‘‘submit,’’ and select ‘‘comment’’
to the right of the subject collection.
FERC submissions must be formatted
and filed in accordance with submission
guidelines at: https://www.ferc.gov. For
user assistance, contact FERC Online
Support by email at ferconlinesupport@
ferc.gov, or by phone at: (866) 208–3676
(toll-free).
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/ferconline/overview.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, telephone
at (202) 502–8663.
SUPPLEMENTARY INFORMATION:
≤Title: FERC–551, Reporting of Flow
Volume and Capacity by Interstate
Natural Gas Pipelines.
OMB Control No.: 1902–0243.
Type of Request: Three-year extension
of the FERC–551 information collection
requirements with no changes to the
current reporting requirements.
Abstract: The Commission is
authorized to facilitate price
transparency in markets for the sale or
transportation of natural gas in
interstate commerce, regarding the
public interest, the integrity of those
markets, fair competition, and the
protection of consumers. FERC–551
uses the information provided by
pipelines as part of its overall
implementation of the statutory
E:\FR\FM\24JAN1.SGM
24JAN1
Agencies
[Federal Register Volume 88, Number 15 (Tuesday, January 24, 2023)]
[Notices]
[Page 4175]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-01320]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2570-034]
Eagle Creek Racine Hydro, LLC; Notice of Intent To Prepare an
Environmental Assessment
On November 30, 2021, Eagle Creek Racine Hydro, LLC filed a
relicense application for the 47.5-megawatt Racine Hydroelectric
Project No. 2570 (Racine Project). The Racine Project is located at the
U.S. Army Corps of Engineers' (Corps) Racine Locks and Dam on the Ohio
River near the Town of Racine in Meigs County, Ohio. The project
occupies 27.99 acres of federal land administered by the Corps.
In accordance with the Commission's regulations, on November 1,
2022, Commission staff issued a notice that the project was ready for
environmental analysis (REA Notice). Based on the information in the
record, including comments filed on the REA Notice, staff does not
anticipate that relicensing the project would constitute a major
federal action significantly affecting the quality of the human
environment. Therefore, staff intends to prepare an Environmental
Assessment (EA) on the application to relicense the project.
The EA will be issued and circulated for review by all interested
parties. All comments filed on the EA will be analyzed by staff and
considered in the Commission's final licensing decision.
The application will be processed according to the following
schedule. Revisions to the schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Commission issues EA.................... July 2023.\1\
Comments on EA.......................... August 2023.
------------------------------------------------------------------------
\1\ The Council on Environmental Quality's (CEQ) regulations under 40
CFR 1501.10(b)(1) require that EAs be completed within 1 year of the
federal action agency's decision to prepare an EA. This notice
establishes the Commission's intent to prepare an EA for the Racine
Hydroelectric Project. Therefore, in accordance with CEQ's
regulations, the EA must be issued within 1 year of the issuance date
of this notice.
Any questions regarding this notice may be directed to Jay Summers
at (202) 502-8764 or [email protected].
Dated: January 18, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-01320 Filed 1-23-23; 8:45 am]
BILLING CODE 6717-01-P