Public Hearing, 1625-1626 [2023-00377]
Download as PDF
Federal Register / Vol. 88, No. 7 / Wednesday, January 11, 2023 / Notices
Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423, ext. 1312; fax (717)
238–2436; email: joyler@srbc.net.
Regular mail inquiries may be sent to
the above address.
SUPPLEMENTARY INFORMATION: This
notice lists previously approved
projects, receiving approval of minor
modifications, described below,
pursuant to 18 CFR 806.18 or to
Commission Resolution Nos. 2013–11
and 2015–06 for the time period
specified above.
1. Inflection Energy (PA) LLC
(Loyalsock Creek), Docket No.
20221214, Upper Fairfield Township,
Lycoming County, Pa.; approval to
change intake design and location;
Approval Date: December 28, 2022.
Authority: Public Law 91–575, 84
Stat. 1509 et seq., 18 CFR parts 806 and
808.
ADDRESSES:
Dated: January 6, 2023.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2023–00375 Filed 1–10–23; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Grandfathering (GF) Registration
Notice
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
This notice lists
Grandfathering Registration for projects
by the Susquehanna River Basin
Commission during the period set forth
in DATES.
DATES: December 1–31, 2022.
ADDRESSES: Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423, ext. 1312; fax: (717)
238–2436; email: joyler@srbc.net.
Regular mail inquiries may be sent to
the above address.
SUPPLEMENTARY INFORMATION: This
notice lists GF Registration for projects,
described below, pursuant to 18 CFR
part 806, subpart E, for the time period
specified above:
1. Barney & Dickenson, Inc., GF
Certificate No. GF–202212232, Town of
lotter on DSK11XQN23PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
17:17 Jan 10, 2023
Jkt 259001
Vestal, Broome County, N.Y.; Main
Storage Pond and combined withdrawal
from Wells 1, 2, and 3; Issue Date:
December 15, 2022.
2. City of Norwich—Public Water
Supply System, GF Certificate No. GF–
202212233, Towns of Norwich and New
Berlin and City of Norwich, Chenango
County, N.Y.; combined withdrawal
from Wells 1 and 2, Well 3, and the
Lower Reservoir; Issue Date: December
15, 2022.
3. Hardinge Inc., GF Certificate No.
GF–202212234, Town of Horseheads,
Chemung County, N.Y.; Wells 1, 2, and
3; Issue Date: December 15, 2022.
4. Hidden Valley Golf Course, Inc., GF
Certificate No. GF–202212235, Wayne
Township, Schuylkill County, Pa.,
Artesian Well, the Other On-site Well,
and the Chateau (Upper) Pond; Issue
Date: December 15, 2022.
5. Knight Settlement Sand & Gravel,
LLC, GF Certificate No. GF–202212236,
Town of Bath, Steuben County, N.Y.;
Cohocton River and the Concrete Well;
Issue Date: December 15, 2022.
6. The Pennsylvania State
University—Public Water Supply
System and University Campus Use, GF
Certificate No. GF–202212237, College
and Patton Townships and State College
Borough, Centre County, Pa.; see
Addendum; Issue Date: December 15,
2022.
7. Tower City Borough Authority—
Public Water Supply System, GF
Certificate No. GF–202212238, Porter
Township, Schuylkill County, Pa.;
Wells 1 and 3; Issue Date: December 15,
2022.
Authority: Public Law 91–575, 84
Stat. 1509 et seq., 18 CFR parts 806 and
808.
Dated: January 6, 2023.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2023–00374 Filed 1–10–23; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Public Hearing
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
The Susquehanna River Basin
Commission will hold a public hearing
on February 2, 2023. The Commission
will hold this hearing in-person and
telephonically. At this public hearing,
the Commission will hear testimony on
the projects listed in the SUPPLEMENTARY
INFORMATION section of this notice. Such
SUMMARY:
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
1625
projects are intended to be scheduled
for Commission action at its next
business meeting, tentatively scheduled
for March 16, 2023, which will be
noticed separately. The public should
take note that this public hearing will be
the only opportunity to offer oral
comment to the Commission for the
listed projects. The deadline for the
submission of written comments is
February 13, 2023.
DATES: The public hearing will convene
on February 2, 2023, at 6:30 p.m. The
public hearing will end at 9:00 p.m. or
at the conclusion of public testimony,
whichever is earlier. The deadline for
the submission of written comments is
Monday, February 13, 2023.
ADDRESSES: This public hearing will be
conducted in-person and virtually. You
may attend in person at Susquehanna
River Basin Commission, 4423 N Front
St., Harrisburg, Pennsylvania or join by
telephone using Toll Free Number 1–
877–304–9269 and then entering guest
passcode 2619070 followed by #.
FOR FURTHER INFORMATION CONTACT:
Jason Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423 or joyler@srbc.net.
Information concerning the applications
for the projects is available at the
Commission’s Water Application and
Approval Viewer at https://
www.srbc.net/waav. Additional
supporting documents are available to
inspect and copy in accordance with the
Commission’s Access to Records Policy
at www.srbc.net/regulatory/policiesguidance/docs/access-to-records-policy2009-02.pdf.
SUPPLEMENTARY INFORMATION: The
public hearing will cover the following
projects:
Projects Scheduled for Action
1. Project Sponsor: Biglerville
Borough Authority. Project Facility:
Biglerville Borough Water Company,
Biglerville Borough and Butler
Township, Adams County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.112 mgd (30-day
average) from Well 7 (Docket No.
19930503).
2. Project Sponsor and Facility: BKV
Operating, LLC (North Branch
Wyalusing Creek), Middletown
Township, Susquehanna County, Pa.
Application for surface water
withdrawal of up to 2.731 mgd (peak
day).
3. Project Sponsor and Facility:
Dillsburg Area Authority, Carroll
Township, York County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.460 mgd (30-day
E:\FR\FM\11JAN1.SGM
11JAN1
lotter on DSK11XQN23PROD with NOTICES1
1626
Federal Register / Vol. 88, No. 7 / Wednesday, January 11, 2023 / Notices
average) from Well 7 (Docket No.
20070907).
4. Project Sponsor and Facility: Dover
Township, York County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.360 mgd (30-day
average) from Well 8 (Docket No.
19911104).
5. Project Sponsor and Facility: First
Quality Tissue, LLC (Bald Eagle Creek),
Allison, Bald Eagle, and Castanea
Townships, Clinton County, Pa.
Applications for renewal of surface
water withdrawal of up to 10.500 mgd
(peak day) and consumptive use of up
to 2.500 mgd (peak day) (Docket No.
20080303).
6. 2022–094; 2020–017 Project
Sponsor and Facility: Hardinge Inc.,
Town of Horseheads, Chemung County,
N.Y. Applications for groundwater
withdrawals (30-day averages) of up to
0.550 mgd from Well 4 and renewal of
0.580 mgd from Well 5 (Docket No.
19900302).
7. Project Sponsor: Helix Ironwood,
LLC. Project Facility: Ironwood
Generating Station (Pennsy Quarry),
South Lebanon Township, Lebanon
County, Pa. Applications for renewal of
surface water withdrawal of up to 4.500
mgd (peak day) and consumptive use of
up to 4.500 mgd (peak day) (Docket No.
19980502).
8. Project Sponsor and Facility:
Mount Union Municipal Authority,
Wayne Township, Mifflin County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.432 mgd (30-day
average) from Well #3—Lemkelde
(Docket No. 20070303).
9. Project Sponsor and Facility:
Repsol Oil & Gas USA, LLC (Fall Brook),
Ward Township, Tioga County, Pa.
Application for renewal of surface water
withdrawal of up to 0.999 mgd (peak
day) (Docket No. 20180303).
10. Project Sponsor and Facility:
Repsol Oil & Gas USA, LLC (Fellows
Creek), Ward Township, Tioga County,
Pa. Application for renewal of surface
water withdrawal of up to 0.999 mgd
(peak day) (Docket No. 20180304).
11. Project Sponsor and Facility:
Seneca Resources Company, LLC (Arnot
No. 5 Mine Discharge), Bloss Township,
Tioga County, Pa. Application for
renewal of surface water withdrawal of
up to 0.499 mgd (peak day) (Docket No.
20180305).
12. Project Sponsor and Facility:
Seneca Resources Company, LLC
(Cowanesque River), Deerfield
Township, Tioga County, Pa.
Application for renewal with
modification to increase the surface
water withdrawal by an additional 0.661
mgd, for a total of up to 1.600 mgd (peak
day) (Docket No. 20220920).
VerDate Sep<11>2014
17:17 Jan 10, 2023
Jkt 259001
13. Project Sponsor and Facility:
Seneca Resources Company, LLC
(Susquehanna River), Sheshequin
Township, Bradford County, Pa.
Application for renewal of surface water
withdrawal of up to 0.850 mgd (peak
day) (Docket No. 20180306).
14. Project Sponsor: Springwood,
LLC. Project Facility: Bridgewater Golf
Club, York Township, York County, Pa.
Application for renewal of consumptive
use of up to 0.099 mgd (30-day average)
(Docket No. 20080307).
15. Project Sponsor and Facility: SWN
Production Company, LLC
(Susquehanna River), Great Bend
Township, Susquehanna County, Pa.
Application for renewal of surface water
withdrawal of up to 1.500 mgd (peak
day) (Docket No. 20180307).
16. Project Sponsor and Facility: Wise
Foods, Inc., Berwick Borough, Columbia
County, Pa. Application for renewal of
groundwater withdrawal of up to 0.860
mgd (30-day average) from Well PW–1
(Docket No. 19920502).
17. Project Sponsor: Wynding Brook
Inc. Project Facility: Wynding Brook
Golf Club, Turbot Township,
Northumberland County, Pa.
Application for renewal of consumptive
use of up to 0.099 mgd (30-day average)
(Docket No. 20080304).
Project Scheduled for Action Involving
a Diversion
18. Project Sponsor: Helix Ironwood,
LLC. Project Facility: Ironwood
Generating Station, South Lebanon
Township, Lebanon County, Pa.
Application for renewal of approval of
an out-of-basin diversion of up to 4.500
mgd (peak day) (Docket No. 19980502).
Commission-Initiated Project Approval
Modification
19. Project Sponsor: Knouse Foods
Cooperative, Inc. Project Facility: Peach
Glen Plant, Tyrone and Huntington
Townships, Adams County, and
Dickinson Township, Cumberland
County, Pa. Conforming the
grandfathered amount with the
forthcoming determination for
groundwater withdrawals (30-day
averages) of up to 0.327 mgd combined
from Wells 2, 4, 5, 7, 8, 9, 10, and 13,
and up to 0.046 mgd from Well 13
(Docket No. 20040912).
Opportunity To Appear and Comment
Interested parties may call into the
hearing to offer comments to the
Commission on any business listed
above required to be the subject of a
public hearing. Given the nature of the
meeting, the Commission strongly
encourages those members of the public
wishing to provide oral comments to
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
pre-register with the Commission by
emailing Jason Oyler at joyler@srbc.net
prior to the hearing date. The presiding
officer reserves the right to limit oral
statements in the interest of time and to
otherwise control the course of the
hearing. Access to the hearing via
telephone will begin at 6:15 p.m.
Guidelines for the public hearing are
posted on the Commission’s website,
www.srbc.net, prior to the hearing for
review. The presiding officer reserves
the right to modify or supplement such
guidelines at the hearing. Written
comments on any business listed above
required to be the subject of a public
hearing may also be mailed to Mr. Jason
Oyler, Secretary to the Commission,
Susquehanna River Basin Commission,
4423 North Front Street, Harrisburg, Pa.
17110–1788, or submitted electronically
through https://www.srbc.net/
regulatory/public-comment/. Comments
mailed or electronically submitted must
be received by the Commission on or
before February 13, 2023, to be
considered.
Authority: Pub. L. 91–575, 84 Stat.
1509 et seq., 18 CFR parts 806, 807, and
808.
Dated: January 6, 2023.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2023–00377 Filed 1–10–23; 8:45 am]
BILLING CODE 7040–01–P
DEPARTMENT OF TRANSPORTATION
Federal Motor Carrier Safety
Administration
[Docket No. FMCSA–2022–0195]
National Registry of Certified Medical
Examiners: 10-Year Refresher Training
and Recertification Testing
Requirements
Federal Motor Carrier Safety
Administration (FMCSA), Department
of Transportation (DOT).
ACTION: Notice of implementation of
medical examiner 10-year refresher
training and recertification testing.
AGENCY:
FMCSA announces
implementation of the regulatory
requirement that all medical examiners
certified and listed on the Agency’s
National Registry of Certified Medical
Examiners (National Registry) maintain
their certification by completing
refresher training 4 to 5 and 9 to 10
years after certification and passing a
recertification test 10 years after
certification. The 5-year refresher
training has been implemented and
SUMMARY:
E:\FR\FM\11JAN1.SGM
11JAN1
Agencies
[Federal Register Volume 88, Number 7 (Wednesday, January 11, 2023)]
[Notices]
[Pages 1625-1626]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-00377]
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Public Hearing
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Susquehanna River Basin Commission will hold a public
hearing on February 2, 2023. The Commission will hold this hearing in-
person and telephonically. At this public hearing, the Commission will
hear testimony on the projects listed in the SUPPLEMENTARY INFORMATION
section of this notice. Such projects are intended to be scheduled for
Commission action at its next business meeting, tentatively scheduled
for March 16, 2023, which will be noticed separately. The public should
take note that this public hearing will be the only opportunity to
offer oral comment to the Commission for the listed projects. The
deadline for the submission of written comments is February 13, 2023.
DATES: The public hearing will convene on February 2, 2023, at 6:30
p.m. The public hearing will end at 9:00 p.m. or at the conclusion of
public testimony, whichever is earlier. The deadline for the submission
of written comments is Monday, February 13, 2023.
ADDRESSES: This public hearing will be conducted in-person and
virtually. You may attend in person at Susquehanna River Basin
Commission, 4423 N Front St., Harrisburg, Pennsylvania or join by
telephone using Toll Free Number 1-877-304-9269 and then entering guest
passcode 2619070 followed by #.
FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel and
Secretary to the Commission, telephone: (717) 238-0423 or
[email protected]. Information concerning the applications for the
projects is available at the Commission's Water Application and
Approval Viewer at https://www.srbc.net/waav. Additional supporting
documents are available to inspect and copy in accordance with the
Commission's Access to Records Policy at www.srbc.net/regulatory/policies-guidance/docs/access-to-records-policy-2009-02.pdf.
SUPPLEMENTARY INFORMATION: The public hearing will cover the following
projects:
Projects Scheduled for Action
1. Project Sponsor: Biglerville Borough Authority. Project
Facility: Biglerville Borough Water Company, Biglerville Borough and
Butler Township, Adams County, Pa. Application for renewal of
groundwater withdrawal of up to 0.112 mgd (30-day average) from Well 7
(Docket No. 19930503).
2. Project Sponsor and Facility: BKV Operating, LLC (North Branch
Wyalusing Creek), Middletown Township, Susquehanna County, Pa.
Application for surface water withdrawal of up to 2.731 mgd (peak day).
3. Project Sponsor and Facility: Dillsburg Area Authority, Carroll
Township, York County, Pa. Application for renewal of groundwater
withdrawal of up to 0.460 mgd (30-day
[[Page 1626]]
average) from Well 7 (Docket No. 20070907).
4. Project Sponsor and Facility: Dover Township, York County, Pa.
Application for renewal of groundwater withdrawal of up to 0.360 mgd
(30-day average) from Well 8 (Docket No. 19911104).
5. Project Sponsor and Facility: First Quality Tissue, LLC (Bald
Eagle Creek), Allison, Bald Eagle, and Castanea Townships, Clinton
County, Pa. Applications for renewal of surface water withdrawal of up
to 10.500 mgd (peak day) and consumptive use of up to 2.500 mgd (peak
day) (Docket No. 20080303).
6. 2022-094; 2020-017 Project Sponsor and Facility: Hardinge Inc.,
Town of Horseheads, Chemung County, N.Y. Applications for groundwater
withdrawals (30-day averages) of up to 0.550 mgd from Well 4 and
renewal of 0.580 mgd from Well 5 (Docket No. 19900302).
7. Project Sponsor: Helix Ironwood, LLC. Project Facility: Ironwood
Generating Station (Pennsy Quarry), South Lebanon Township, Lebanon
County, Pa. Applications for renewal of surface water withdrawal of up
to 4.500 mgd (peak day) and consumptive use of up to 4.500 mgd (peak
day) (Docket No. 19980502).
8. Project Sponsor and Facility: Mount Union Municipal Authority,
Wayne Township, Mifflin County, Pa. Application for renewal of
groundwater withdrawal of up to 0.432 mgd (30-day average) from Well
#3--Lemkelde (Docket No. 20070303).
9. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC (Fall
Brook), Ward Township, Tioga County, Pa. Application for renewal of
surface water withdrawal of up to 0.999 mgd (peak day) (Docket No.
20180303).
10. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC
(Fellows Creek), Ward Township, Tioga County, Pa. Application for
renewal of surface water withdrawal of up to 0.999 mgd (peak day)
(Docket No. 20180304).
11. Project Sponsor and Facility: Seneca Resources Company, LLC
(Arnot No. 5 Mine Discharge), Bloss Township, Tioga County, Pa.
Application for renewal of surface water withdrawal of up to 0.499 mgd
(peak day) (Docket No. 20180305).
12. Project Sponsor and Facility: Seneca Resources Company, LLC
(Cowanesque River), Deerfield Township, Tioga County, Pa. Application
for renewal with modification to increase the surface water withdrawal
by an additional 0.661 mgd, for a total of up to 1.600 mgd (peak day)
(Docket No. 20220920).
13. Project Sponsor and Facility: Seneca Resources Company, LLC
(Susquehanna River), Sheshequin Township, Bradford County, Pa.
Application for renewal of surface water withdrawal of up to 0.850 mgd
(peak day) (Docket No. 20180306).
14. Project Sponsor: Springwood, LLC. Project Facility: Bridgewater
Golf Club, York Township, York County, Pa. Application for renewal of
consumptive use of up to 0.099 mgd (30-day average) (Docket No.
20080307).
15. Project Sponsor and Facility: SWN Production Company, LLC
(Susquehanna River), Great Bend Township, Susquehanna County, Pa.
Application for renewal of surface water withdrawal of up to 1.500 mgd
(peak day) (Docket No. 20180307).
16. Project Sponsor and Facility: Wise Foods, Inc., Berwick
Borough, Columbia County, Pa. Application for renewal of groundwater
withdrawal of up to 0.860 mgd (30-day average) from Well PW-1 (Docket
No. 19920502).
17. Project Sponsor: Wynding Brook Inc. Project Facility: Wynding
Brook Golf Club, Turbot Township, Northumberland County, Pa.
Application for renewal of consumptive use of up to 0.099 mgd (30-day
average) (Docket No. 20080304).
Project Scheduled for Action Involving a Diversion
18. Project Sponsor: Helix Ironwood, LLC. Project Facility:
Ironwood Generating Station, South Lebanon Township, Lebanon County,
Pa. Application for renewal of approval of an out-of-basin diversion of
up to 4.500 mgd (peak day) (Docket No. 19980502).
Commission-Initiated Project Approval Modification
19. Project Sponsor: Knouse Foods Cooperative, Inc. Project
Facility: Peach Glen Plant, Tyrone and Huntington Townships, Adams
County, and Dickinson Township, Cumberland County, Pa. Conforming the
grandfathered amount with the forthcoming determination for groundwater
withdrawals (30-day averages) of up to 0.327 mgd combined from Wells 2,
4, 5, 7, 8, 9, 10, and 13, and up to 0.046 mgd from Well 13 (Docket No.
20040912).
Opportunity To Appear and Comment
Interested parties may call into the hearing to offer comments to
the Commission on any business listed above required to be the subject
of a public hearing. Given the nature of the meeting, the Commission
strongly encourages those members of the public wishing to provide oral
comments to pre-register with the Commission by emailing Jason Oyler at
[email protected] prior to the hearing date. The presiding officer
reserves the right to limit oral statements in the interest of time and
to otherwise control the course of the hearing. Access to the hearing
via telephone will begin at 6:15 p.m. Guidelines for the public hearing
are posted on the Commission's website, www.srbc.net, prior to the
hearing for review. The presiding officer reserves the right to modify
or supplement such guidelines at the hearing. Written comments on any
business listed above required to be the subject of a public hearing
may also be mailed to Mr. Jason Oyler, Secretary to the Commission,
Susquehanna River Basin Commission, 4423 North Front Street,
Harrisburg, Pa. 17110-1788, or submitted electronically through https://www.srbc.net/regulatory/public-comment/. Comments mailed or
electronically submitted must be received by the Commission on or
before February 13, 2023, to be considered.
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 806,
807, and 808.
Dated: January 6, 2023.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2023-00377 Filed 1-10-23; 8:45 am]
BILLING CODE 7040-01-P