Public Hearing, 1625-1626 [2023-00377]

Download as PDF Federal Register / Vol. 88, No. 7 / Wednesday, January 11, 2023 / Notices Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, PA 17110–1788. FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel and Secretary to the Commission, telephone: (717) 238–0423, ext. 1312; fax (717) 238–2436; email: joyler@srbc.net. Regular mail inquiries may be sent to the above address. SUPPLEMENTARY INFORMATION: This notice lists previously approved projects, receiving approval of minor modifications, described below, pursuant to 18 CFR 806.18 or to Commission Resolution Nos. 2013–11 and 2015–06 for the time period specified above. 1. Inflection Energy (PA) LLC (Loyalsock Creek), Docket No. 20221214, Upper Fairfield Township, Lycoming County, Pa.; approval to change intake design and location; Approval Date: December 28, 2022. Authority: Public Law 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806 and 808. ADDRESSES: Dated: January 6, 2023. Jason E. Oyler, General Counsel and Secretary to the Commission. [FR Doc. 2023–00375 Filed 1–10–23; 8:45 am] BILLING CODE 7040–01–P SUSQUEHANNA RIVER BASIN COMMISSION Grandfathering (GF) Registration Notice Susquehanna River Basin Commission. ACTION: Notice. AGENCY: This notice lists Grandfathering Registration for projects by the Susquehanna River Basin Commission during the period set forth in DATES. DATES: December 1–31, 2022. ADDRESSES: Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, PA 17110–1788. FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel and Secretary to the Commission, telephone: (717) 238–0423, ext. 1312; fax: (717) 238–2436; email: joyler@srbc.net. Regular mail inquiries may be sent to the above address. SUPPLEMENTARY INFORMATION: This notice lists GF Registration for projects, described below, pursuant to 18 CFR part 806, subpart E, for the time period specified above: 1. Barney & Dickenson, Inc., GF Certificate No. GF–202212232, Town of lotter on DSK11XQN23PROD with NOTICES1 SUMMARY: VerDate Sep<11>2014 17:17 Jan 10, 2023 Jkt 259001 Vestal, Broome County, N.Y.; Main Storage Pond and combined withdrawal from Wells 1, 2, and 3; Issue Date: December 15, 2022. 2. City of Norwich—Public Water Supply System, GF Certificate No. GF– 202212233, Towns of Norwich and New Berlin and City of Norwich, Chenango County, N.Y.; combined withdrawal from Wells 1 and 2, Well 3, and the Lower Reservoir; Issue Date: December 15, 2022. 3. Hardinge Inc., GF Certificate No. GF–202212234, Town of Horseheads, Chemung County, N.Y.; Wells 1, 2, and 3; Issue Date: December 15, 2022. 4. Hidden Valley Golf Course, Inc., GF Certificate No. GF–202212235, Wayne Township, Schuylkill County, Pa., Artesian Well, the Other On-site Well, and the Chateau (Upper) Pond; Issue Date: December 15, 2022. 5. Knight Settlement Sand & Gravel, LLC, GF Certificate No. GF–202212236, Town of Bath, Steuben County, N.Y.; Cohocton River and the Concrete Well; Issue Date: December 15, 2022. 6. The Pennsylvania State University—Public Water Supply System and University Campus Use, GF Certificate No. GF–202212237, College and Patton Townships and State College Borough, Centre County, Pa.; see Addendum; Issue Date: December 15, 2022. 7. Tower City Borough Authority— Public Water Supply System, GF Certificate No. GF–202212238, Porter Township, Schuylkill County, Pa.; Wells 1 and 3; Issue Date: December 15, 2022. Authority: Public Law 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806 and 808. Dated: January 6, 2023. Jason E. Oyler, General Counsel and Secretary to the Commission. [FR Doc. 2023–00374 Filed 1–10–23; 8:45 am] BILLING CODE 7040–01–P SUSQUEHANNA RIVER BASIN COMMISSION Public Hearing Susquehanna River Basin Commission. ACTION: Notice. AGENCY: The Susquehanna River Basin Commission will hold a public hearing on February 2, 2023. The Commission will hold this hearing in-person and telephonically. At this public hearing, the Commission will hear testimony on the projects listed in the SUPPLEMENTARY INFORMATION section of this notice. Such SUMMARY: PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 1625 projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for March 16, 2023, which will be noticed separately. The public should take note that this public hearing will be the only opportunity to offer oral comment to the Commission for the listed projects. The deadline for the submission of written comments is February 13, 2023. DATES: The public hearing will convene on February 2, 2023, at 6:30 p.m. The public hearing will end at 9:00 p.m. or at the conclusion of public testimony, whichever is earlier. The deadline for the submission of written comments is Monday, February 13, 2023. ADDRESSES: This public hearing will be conducted in-person and virtually. You may attend in person at Susquehanna River Basin Commission, 4423 N Front St., Harrisburg, Pennsylvania or join by telephone using Toll Free Number 1– 877–304–9269 and then entering guest passcode 2619070 followed by #. FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel and Secretary to the Commission, telephone: (717) 238–0423 or joyler@srbc.net. Information concerning the applications for the projects is available at the Commission’s Water Application and Approval Viewer at https:// www.srbc.net/waav. Additional supporting documents are available to inspect and copy in accordance with the Commission’s Access to Records Policy at www.srbc.net/regulatory/policiesguidance/docs/access-to-records-policy2009-02.pdf. SUPPLEMENTARY INFORMATION: The public hearing will cover the following projects: Projects Scheduled for Action 1. Project Sponsor: Biglerville Borough Authority. Project Facility: Biglerville Borough Water Company, Biglerville Borough and Butler Township, Adams County, Pa. Application for renewal of groundwater withdrawal of up to 0.112 mgd (30-day average) from Well 7 (Docket No. 19930503). 2. Project Sponsor and Facility: BKV Operating, LLC (North Branch Wyalusing Creek), Middletown Township, Susquehanna County, Pa. Application for surface water withdrawal of up to 2.731 mgd (peak day). 3. Project Sponsor and Facility: Dillsburg Area Authority, Carroll Township, York County, Pa. Application for renewal of groundwater withdrawal of up to 0.460 mgd (30-day E:\FR\FM\11JAN1.SGM 11JAN1 lotter on DSK11XQN23PROD with NOTICES1 1626 Federal Register / Vol. 88, No. 7 / Wednesday, January 11, 2023 / Notices average) from Well 7 (Docket No. 20070907). 4. Project Sponsor and Facility: Dover Township, York County, Pa. Application for renewal of groundwater withdrawal of up to 0.360 mgd (30-day average) from Well 8 (Docket No. 19911104). 5. Project Sponsor and Facility: First Quality Tissue, LLC (Bald Eagle Creek), Allison, Bald Eagle, and Castanea Townships, Clinton County, Pa. Applications for renewal of surface water withdrawal of up to 10.500 mgd (peak day) and consumptive use of up to 2.500 mgd (peak day) (Docket No. 20080303). 6. 2022–094; 2020–017 Project Sponsor and Facility: Hardinge Inc., Town of Horseheads, Chemung County, N.Y. Applications for groundwater withdrawals (30-day averages) of up to 0.550 mgd from Well 4 and renewal of 0.580 mgd from Well 5 (Docket No. 19900302). 7. Project Sponsor: Helix Ironwood, LLC. Project Facility: Ironwood Generating Station (Pennsy Quarry), South Lebanon Township, Lebanon County, Pa. Applications for renewal of surface water withdrawal of up to 4.500 mgd (peak day) and consumptive use of up to 4.500 mgd (peak day) (Docket No. 19980502). 8. Project Sponsor and Facility: Mount Union Municipal Authority, Wayne Township, Mifflin County, Pa. Application for renewal of groundwater withdrawal of up to 0.432 mgd (30-day average) from Well #3—Lemkelde (Docket No. 20070303). 9. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC (Fall Brook), Ward Township, Tioga County, Pa. Application for renewal of surface water withdrawal of up to 0.999 mgd (peak day) (Docket No. 20180303). 10. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC (Fellows Creek), Ward Township, Tioga County, Pa. Application for renewal of surface water withdrawal of up to 0.999 mgd (peak day) (Docket No. 20180304). 11. Project Sponsor and Facility: Seneca Resources Company, LLC (Arnot No. 5 Mine Discharge), Bloss Township, Tioga County, Pa. Application for renewal of surface water withdrawal of up to 0.499 mgd (peak day) (Docket No. 20180305). 12. Project Sponsor and Facility: Seneca Resources Company, LLC (Cowanesque River), Deerfield Township, Tioga County, Pa. Application for renewal with modification to increase the surface water withdrawal by an additional 0.661 mgd, for a total of up to 1.600 mgd (peak day) (Docket No. 20220920). VerDate Sep<11>2014 17:17 Jan 10, 2023 Jkt 259001 13. Project Sponsor and Facility: Seneca Resources Company, LLC (Susquehanna River), Sheshequin Township, Bradford County, Pa. Application for renewal of surface water withdrawal of up to 0.850 mgd (peak day) (Docket No. 20180306). 14. Project Sponsor: Springwood, LLC. Project Facility: Bridgewater Golf Club, York Township, York County, Pa. Application for renewal of consumptive use of up to 0.099 mgd (30-day average) (Docket No. 20080307). 15. Project Sponsor and Facility: SWN Production Company, LLC (Susquehanna River), Great Bend Township, Susquehanna County, Pa. Application for renewal of surface water withdrawal of up to 1.500 mgd (peak day) (Docket No. 20180307). 16. Project Sponsor and Facility: Wise Foods, Inc., Berwick Borough, Columbia County, Pa. Application for renewal of groundwater withdrawal of up to 0.860 mgd (30-day average) from Well PW–1 (Docket No. 19920502). 17. Project Sponsor: Wynding Brook Inc. Project Facility: Wynding Brook Golf Club, Turbot Township, Northumberland County, Pa. Application for renewal of consumptive use of up to 0.099 mgd (30-day average) (Docket No. 20080304). Project Scheduled for Action Involving a Diversion 18. Project Sponsor: Helix Ironwood, LLC. Project Facility: Ironwood Generating Station, South Lebanon Township, Lebanon County, Pa. Application for renewal of approval of an out-of-basin diversion of up to 4.500 mgd (peak day) (Docket No. 19980502). Commission-Initiated Project Approval Modification 19. Project Sponsor: Knouse Foods Cooperative, Inc. Project Facility: Peach Glen Plant, Tyrone and Huntington Townships, Adams County, and Dickinson Township, Cumberland County, Pa. Conforming the grandfathered amount with the forthcoming determination for groundwater withdrawals (30-day averages) of up to 0.327 mgd combined from Wells 2, 4, 5, 7, 8, 9, 10, and 13, and up to 0.046 mgd from Well 13 (Docket No. 20040912). Opportunity To Appear and Comment Interested parties may call into the hearing to offer comments to the Commission on any business listed above required to be the subject of a public hearing. Given the nature of the meeting, the Commission strongly encourages those members of the public wishing to provide oral comments to PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 pre-register with the Commission by emailing Jason Oyler at joyler@srbc.net prior to the hearing date. The presiding officer reserves the right to limit oral statements in the interest of time and to otherwise control the course of the hearing. Access to the hearing via telephone will begin at 6:15 p.m. Guidelines for the public hearing are posted on the Commission’s website, www.srbc.net, prior to the hearing for review. The presiding officer reserves the right to modify or supplement such guidelines at the hearing. Written comments on any business listed above required to be the subject of a public hearing may also be mailed to Mr. Jason Oyler, Secretary to the Commission, Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, Pa. 17110–1788, or submitted electronically through https://www.srbc.net/ regulatory/public-comment/. Comments mailed or electronically submitted must be received by the Commission on or before February 13, 2023, to be considered. Authority: Pub. L. 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806, 807, and 808. Dated: January 6, 2023. Jason E. Oyler, General Counsel and Secretary to the Commission. [FR Doc. 2023–00377 Filed 1–10–23; 8:45 am] BILLING CODE 7040–01–P DEPARTMENT OF TRANSPORTATION Federal Motor Carrier Safety Administration [Docket No. FMCSA–2022–0195] National Registry of Certified Medical Examiners: 10-Year Refresher Training and Recertification Testing Requirements Federal Motor Carrier Safety Administration (FMCSA), Department of Transportation (DOT). ACTION: Notice of implementation of medical examiner 10-year refresher training and recertification testing. AGENCY: FMCSA announces implementation of the regulatory requirement that all medical examiners certified and listed on the Agency’s National Registry of Certified Medical Examiners (National Registry) maintain their certification by completing refresher training 4 to 5 and 9 to 10 years after certification and passing a recertification test 10 years after certification. The 5-year refresher training has been implemented and SUMMARY: E:\FR\FM\11JAN1.SGM 11JAN1

Agencies

[Federal Register Volume 88, Number 7 (Wednesday, January 11, 2023)]
[Notices]
[Pages 1625-1626]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-00377]


-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Public Hearing

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Susquehanna River Basin Commission will hold a public 
hearing on February 2, 2023. The Commission will hold this hearing in-
person and telephonically. At this public hearing, the Commission will 
hear testimony on the projects listed in the SUPPLEMENTARY INFORMATION 
section of this notice. Such projects are intended to be scheduled for 
Commission action at its next business meeting, tentatively scheduled 
for March 16, 2023, which will be noticed separately. The public should 
take note that this public hearing will be the only opportunity to 
offer oral comment to the Commission for the listed projects. The 
deadline for the submission of written comments is February 13, 2023.

DATES: The public hearing will convene on February 2, 2023, at 6:30 
p.m. The public hearing will end at 9:00 p.m. or at the conclusion of 
public testimony, whichever is earlier. The deadline for the submission 
of written comments is Monday, February 13, 2023.

ADDRESSES: This public hearing will be conducted in-person and 
virtually. You may attend in person at Susquehanna River Basin 
Commission, 4423 N Front St., Harrisburg, Pennsylvania or join by 
telephone using Toll Free Number 1-877-304-9269 and then entering guest 
passcode 2619070 followed by #.

FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel and 
Secretary to the Commission, telephone: (717) 238-0423 or 
[email protected]. Information concerning the applications for the 
projects is available at the Commission's Water Application and 
Approval Viewer at https://www.srbc.net/waav. Additional supporting 
documents are available to inspect and copy in accordance with the 
Commission's Access to Records Policy at www.srbc.net/regulatory/policies-guidance/docs/access-to-records-policy-2009-02.pdf.

SUPPLEMENTARY INFORMATION: The public hearing will cover the following 
projects:

Projects Scheduled for Action

    1. Project Sponsor: Biglerville Borough Authority. Project 
Facility: Biglerville Borough Water Company, Biglerville Borough and 
Butler Township, Adams County, Pa. Application for renewal of 
groundwater withdrawal of up to 0.112 mgd (30-day average) from Well 7 
(Docket No. 19930503).
    2. Project Sponsor and Facility: BKV Operating, LLC (North Branch 
Wyalusing Creek), Middletown Township, Susquehanna County, Pa. 
Application for surface water withdrawal of up to 2.731 mgd (peak day).
    3. Project Sponsor and Facility: Dillsburg Area Authority, Carroll 
Township, York County, Pa. Application for renewal of groundwater 
withdrawal of up to 0.460 mgd (30-day

[[Page 1626]]

average) from Well 7 (Docket No. 20070907).
    4. Project Sponsor and Facility: Dover Township, York County, Pa. 
Application for renewal of groundwater withdrawal of up to 0.360 mgd 
(30-day average) from Well 8 (Docket No. 19911104).
    5. Project Sponsor and Facility: First Quality Tissue, LLC (Bald 
Eagle Creek), Allison, Bald Eagle, and Castanea Townships, Clinton 
County, Pa. Applications for renewal of surface water withdrawal of up 
to 10.500 mgd (peak day) and consumptive use of up to 2.500 mgd (peak 
day) (Docket No. 20080303).
    6. 2022-094; 2020-017 Project Sponsor and Facility: Hardinge Inc., 
Town of Horseheads, Chemung County, N.Y. Applications for groundwater 
withdrawals (30-day averages) of up to 0.550 mgd from Well 4 and 
renewal of 0.580 mgd from Well 5 (Docket No. 19900302).
    7. Project Sponsor: Helix Ironwood, LLC. Project Facility: Ironwood 
Generating Station (Pennsy Quarry), South Lebanon Township, Lebanon 
County, Pa. Applications for renewal of surface water withdrawal of up 
to 4.500 mgd (peak day) and consumptive use of up to 4.500 mgd (peak 
day) (Docket No. 19980502).
    8. Project Sponsor and Facility: Mount Union Municipal Authority, 
Wayne Township, Mifflin County, Pa. Application for renewal of 
groundwater withdrawal of up to 0.432 mgd (30-day average) from Well 
#3--Lemkelde (Docket No. 20070303).
    9. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC (Fall 
Brook), Ward Township, Tioga County, Pa. Application for renewal of 
surface water withdrawal of up to 0.999 mgd (peak day) (Docket No. 
20180303).
    10. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC 
(Fellows Creek), Ward Township, Tioga County, Pa. Application for 
renewal of surface water withdrawal of up to 0.999 mgd (peak day) 
(Docket No. 20180304).
    11. Project Sponsor and Facility: Seneca Resources Company, LLC 
(Arnot No. 5 Mine Discharge), Bloss Township, Tioga County, Pa. 
Application for renewal of surface water withdrawal of up to 0.499 mgd 
(peak day) (Docket No. 20180305).
    12. Project Sponsor and Facility: Seneca Resources Company, LLC 
(Cowanesque River), Deerfield Township, Tioga County, Pa. Application 
for renewal with modification to increase the surface water withdrawal 
by an additional 0.661 mgd, for a total of up to 1.600 mgd (peak day) 
(Docket No. 20220920).
    13. Project Sponsor and Facility: Seneca Resources Company, LLC 
(Susquehanna River), Sheshequin Township, Bradford County, Pa. 
Application for renewal of surface water withdrawal of up to 0.850 mgd 
(peak day) (Docket No. 20180306).
    14. Project Sponsor: Springwood, LLC. Project Facility: Bridgewater 
Golf Club, York Township, York County, Pa. Application for renewal of 
consumptive use of up to 0.099 mgd (30-day average) (Docket No. 
20080307).
    15. Project Sponsor and Facility: SWN Production Company, LLC 
(Susquehanna River), Great Bend Township, Susquehanna County, Pa. 
Application for renewal of surface water withdrawal of up to 1.500 mgd 
(peak day) (Docket No. 20180307).
    16. Project Sponsor and Facility: Wise Foods, Inc., Berwick 
Borough, Columbia County, Pa. Application for renewal of groundwater 
withdrawal of up to 0.860 mgd (30-day average) from Well PW-1 (Docket 
No. 19920502).
    17. Project Sponsor: Wynding Brook Inc. Project Facility: Wynding 
Brook Golf Club, Turbot Township, Northumberland County, Pa. 
Application for renewal of consumptive use of up to 0.099 mgd (30-day 
average) (Docket No. 20080304).

Project Scheduled for Action Involving a Diversion

    18. Project Sponsor: Helix Ironwood, LLC. Project Facility: 
Ironwood Generating Station, South Lebanon Township, Lebanon County, 
Pa. Application for renewal of approval of an out-of-basin diversion of 
up to 4.500 mgd (peak day) (Docket No. 19980502).

Commission-Initiated Project Approval Modification

    19. Project Sponsor: Knouse Foods Cooperative, Inc. Project 
Facility: Peach Glen Plant, Tyrone and Huntington Townships, Adams 
County, and Dickinson Township, Cumberland County, Pa. Conforming the 
grandfathered amount with the forthcoming determination for groundwater 
withdrawals (30-day averages) of up to 0.327 mgd combined from Wells 2, 
4, 5, 7, 8, 9, 10, and 13, and up to 0.046 mgd from Well 13 (Docket No. 
20040912).

Opportunity To Appear and Comment

    Interested parties may call into the hearing to offer comments to 
the Commission on any business listed above required to be the subject 
of a public hearing. Given the nature of the meeting, the Commission 
strongly encourages those members of the public wishing to provide oral 
comments to pre-register with the Commission by emailing Jason Oyler at 
[email protected] prior to the hearing date. The presiding officer 
reserves the right to limit oral statements in the interest of time and 
to otherwise control the course of the hearing. Access to the hearing 
via telephone will begin at 6:15 p.m. Guidelines for the public hearing 
are posted on the Commission's website, www.srbc.net, prior to the 
hearing for review. The presiding officer reserves the right to modify 
or supplement such guidelines at the hearing. Written comments on any 
business listed above required to be the subject of a public hearing 
may also be mailed to Mr. Jason Oyler, Secretary to the Commission, 
Susquehanna River Basin Commission, 4423 North Front Street, 
Harrisburg, Pa. 17110-1788, or submitted electronically through https://www.srbc.net/regulatory/public-comment/. Comments mailed or 
electronically submitted must be received by the Commission on or 
before February 13, 2023, to be considered.
    Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 806, 
807, and 808.

    Dated: January 6, 2023.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2023-00377 Filed 1-10-23; 8:45 am]
BILLING CODE 7040-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.