Projects Approved for Minor Modifications, 1624-1625 [2023-00375]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
1624
Federal Register / Vol. 88, No. 7 / Wednesday, January 11, 2023 / Notices
20. Coterra Energy Inc.; Pad ID:
Precision Capital LP P1; ABR–
201709003.R1; Lathrop Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 5.0000 mgd; Approval
Date: December 22, 2022.
21. EQT ARO LLC; Pad ID: Mountain
Meadow Lodge Pad A; ABR–
201709006.R1; McIntyre Township,
Lycoming County, Pa.; Consumptive
Use of Up to 4.0000 mgd; Approval
Date: December 22, 2022.
22. Repsol Oil & Gas USA, LLC; Pad
ID: COOK (05 040) C; ABR–
201010021.R2; Orwell Township,
Bradford County, Pa.; Consumptive Use
of Up to 6.0000 mgd; Approval Date:
December 22, 2022.
23. Repsol Oil & Gas USA, LLC; Pad
ID: Kindon 374; ABR–201010002.R2;
Union Township, Tioga County, Pa.;
Consumptive Use of Up to 6.0000 mgd;
Approval Date: December 22, 2022.
24. Seneca Resources Company, LLC;
Pad ID: B08–Z; ABR–202212004;
Shippen Township, Cameron County,
Pa.; Consumptive Use of Up to 4.0000
mgd; Approval Date: December 22,
2022.
25. Seneca Resources Company, LLC;
Pad ID: Signor 578; ABR–201010023.R2;
Charleston Township, Tioga County,
Pa.; Consumptive Use of Up to 4.0000
mgd; Approval Date: December 22,
2022.
26. SWN Production Company, LLC;
Pad ID: Gypsy Hill-Eastabrook (Pad 5);
ABR–201209018.R2; Orwell Township,
Bradford County, Pa.; Consumptive Use
of Up to 4.9990 mgd; Approval Date:
December 22, 2022.
27. SWN Production Company, LLC;
Pad ID: Rabago Birk (Pad 10); ABR–
201209019.R2; Herrick Township,
Bradford County, Pa.; Consumptive Use
of Up to 4.9990 mgd; Approval Date:
December 22, 2022.
28. SWN Production Company, LLC;
Pad ID: Wootton East Well Pad; ABR–
201209020.R2; Liberty Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 4.9990 mgd; Approval
Date: December 22, 2022.
29. Coterra Energy Inc.; Pad ID: BrayB
P1; ABR–201210004.R2; Auburn
Township, Susquehanna County, Pa.;
Consumptive Use of Up to 5.0000 mgd;
Approval Date: December 27, 2022.
30. Coterra Energy Inc.; Pad ID: BurtsL
P1; ABR–201109026.R2; Forest Lake
Township, Susquehanna County, Pa.;
Consumptive Use of Up to5.0000 mgd;
Approval Date: December 27, 2022.
31. Coterra Energy Inc.; Pad ID:
DeluciaR P1; ABR–201211002.R2;
Harford Township, Susquehanna
County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: December
27, 2022.
VerDate Sep<11>2014
17:17 Jan 10, 2023
Jkt 259001
32. Coterra Energy Inc.; Pad ID:
RutkowskiB P1; ABR–201210003.R2;
Lenox Township, Susquehanna County,
Pa.; Consumptive Use of Up to 5.0000
mgd; Approval Date: December 27,
2022.
33. Coterra Energy Inc.; Pad ID:
WellsP P1; ABR–201111023.R2;
Bridgewater Township, Susquehanna
County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: December
27, 2022.
34. Pennsylvania General Energy
Company, L.L.C.; Pad ID: SUSQ
Cummings Pad E; ABR–202212002;
Union Township, Tioga County, Pa.;
Consumptive Use of Up to 4.5000 mgd;
Approval Date: December 27, 2022.
35. Chesapeake Appalachia, L.L.C.;
Pad ID: Lemoreview Farms; ABR–
201010003.R2; Leroy Township,
Bradford County, Pa.; Consumptive Use
of Up to 7.5000 mgd; Approval Date:
December 29, 2022.
36. EQT ARO LLC; Pad ID: Elbow
F&G Pad B; ABR–201206007.R2; Cogan
House Township, Lycoming County,
Pa.; Consumptive Use of Up to 4.0000
mgd; Approval Date: December 29,
2022.
37. Seneca Resources Company, LLC;
Pad ID: Heath 418; ABR–201010011.R2;
Delmar Township, Tioga County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: December 29, 2022.
38. Seneca Resources Company, LLC;
Pad ID: Lopatofsky 287; ABR–
201009091.R2; Charleston Township,
Tioga County, Pa.; Consumptive Use of
Up to 4.0000 mgd; Approval Date:
December 29, 2022.
39. Seneca Resources Company, LLC;
Pad ID: Schimmel 830; ABR–
201009090.R2; Farmington Township,
Tioga County, Pa.; Consumptive Use of
Up to 4.0000 mgd; Approval Date:
December 29, 2022.
40. Seneca Resources Company, LLC;
Pad ID: Worden 571; ABR–
201009092.R2; Charleston Township,
Tioga County, Pa.; Consumptive Use of
Up to 4.0000 mgd; Approval Date:
December 29, 2022.
41. Blackhill Energy LLC; Pad ID:
KLINE A Pad; ABR–201210010.R2;
Springfield Township, Bradford County,
Pa.; Consumptive Use of Up to 4.9900
mgd; Approval Date: December 30,
2022.
42. Blackhill Energy LLC; Pad ID:
KLINE B Pad; ABR–201210011.R2;
Springfield Township, Bradford County,
Pa.; Consumptive Use of Up to 4.9900
mgd; Approval Date: December 30,
2022.
43. Blackhill Energy LLC; Pad ID:
WARD B Pad; ABR–201210009.R2;
Springfield Township, Bradford County,
Pa.; Consumptive Use of Up to 4.9900
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
mgd; Approval Date: December 30,
2022.
44. Coterra Energy Inc.; Pad ID:
EllsworthA P1; ABR–201110015.R2;
Bridgewater Township, Susquehanna
County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: December
30, 2022.
45. SWN Production Company, LLC;
Pad ID: ENDLESS MOUNTAIN
RECREATION; ABR–201209001.R2;
New Milford Township, Susquehanna
County, Pa.; Consumptive Use of Up to
4.9990 mgd; Approval Date: December
30, 2022.
The following project applications
have had their review terminated under
18 CFR 806.22(f) and in accordance
with Policy No. 2016–02, Guidelines for
Terminating Review of a Project
Application.
Termination of Review—Issued Under
18 CFR 806.22(f)
1. Norse Energy Corporation USA;
Pad ID: Martin, C. #1H; NOI–2011–0581;
McDonough Town, Chenango County,
NY; Consumptive Use of Up to 5.5000
mgd; Termination Date: December 28,
2022.
2. Norse Energy Corporation USA;
Pad ID: Norse-Housing #1H; NOI–2011–
0582; Smyrna Town, Chenango County,
NY; Consumptive Use of Up to 5.5000
mgd; Termination Date: December 28,
2022.
3. Norse Energy Corporation USA;
Pad ID: Norwalk, R #1H—4H; NOI–
2011–0583; Smithville Town, Chenango
County, NY; Consumptive Use of Up to
5.5000 mgd; Termination Date:
December 28, 2022.
Authority: Public Law 91–575, 84
Stat. 1509 et seq., 18 CFR parts 806 and
808.
Dated: January 6, 2023.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2023–00373 Filed 1–10–23; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Projects Approved for Minor
Modifications
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
This notice lists the minor
modifications approved for a previously
approved project by the Susquehanna
River Basin Commission during the
period set forth in DATES.
DATES: December 1–31, 2022.
SUMMARY:
E:\FR\FM\11JAN1.SGM
11JAN1
Federal Register / Vol. 88, No. 7 / Wednesday, January 11, 2023 / Notices
Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423, ext. 1312; fax (717)
238–2436; email: joyler@srbc.net.
Regular mail inquiries may be sent to
the above address.
SUPPLEMENTARY INFORMATION: This
notice lists previously approved
projects, receiving approval of minor
modifications, described below,
pursuant to 18 CFR 806.18 or to
Commission Resolution Nos. 2013–11
and 2015–06 for the time period
specified above.
1. Inflection Energy (PA) LLC
(Loyalsock Creek), Docket No.
20221214, Upper Fairfield Township,
Lycoming County, Pa.; approval to
change intake design and location;
Approval Date: December 28, 2022.
Authority: Public Law 91–575, 84
Stat. 1509 et seq., 18 CFR parts 806 and
808.
ADDRESSES:
Dated: January 6, 2023.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2023–00375 Filed 1–10–23; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Grandfathering (GF) Registration
Notice
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
This notice lists
Grandfathering Registration for projects
by the Susquehanna River Basin
Commission during the period set forth
in DATES.
DATES: December 1–31, 2022.
ADDRESSES: Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423, ext. 1312; fax: (717)
238–2436; email: joyler@srbc.net.
Regular mail inquiries may be sent to
the above address.
SUPPLEMENTARY INFORMATION: This
notice lists GF Registration for projects,
described below, pursuant to 18 CFR
part 806, subpart E, for the time period
specified above:
1. Barney & Dickenson, Inc., GF
Certificate No. GF–202212232, Town of
lotter on DSK11XQN23PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
17:17 Jan 10, 2023
Jkt 259001
Vestal, Broome County, N.Y.; Main
Storage Pond and combined withdrawal
from Wells 1, 2, and 3; Issue Date:
December 15, 2022.
2. City of Norwich—Public Water
Supply System, GF Certificate No. GF–
202212233, Towns of Norwich and New
Berlin and City of Norwich, Chenango
County, N.Y.; combined withdrawal
from Wells 1 and 2, Well 3, and the
Lower Reservoir; Issue Date: December
15, 2022.
3. Hardinge Inc., GF Certificate No.
GF–202212234, Town of Horseheads,
Chemung County, N.Y.; Wells 1, 2, and
3; Issue Date: December 15, 2022.
4. Hidden Valley Golf Course, Inc., GF
Certificate No. GF–202212235, Wayne
Township, Schuylkill County, Pa.,
Artesian Well, the Other On-site Well,
and the Chateau (Upper) Pond; Issue
Date: December 15, 2022.
5. Knight Settlement Sand & Gravel,
LLC, GF Certificate No. GF–202212236,
Town of Bath, Steuben County, N.Y.;
Cohocton River and the Concrete Well;
Issue Date: December 15, 2022.
6. The Pennsylvania State
University—Public Water Supply
System and University Campus Use, GF
Certificate No. GF–202212237, College
and Patton Townships and State College
Borough, Centre County, Pa.; see
Addendum; Issue Date: December 15,
2022.
7. Tower City Borough Authority—
Public Water Supply System, GF
Certificate No. GF–202212238, Porter
Township, Schuylkill County, Pa.;
Wells 1 and 3; Issue Date: December 15,
2022.
Authority: Public Law 91–575, 84
Stat. 1509 et seq., 18 CFR parts 806 and
808.
Dated: January 6, 2023.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2023–00374 Filed 1–10–23; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Public Hearing
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
The Susquehanna River Basin
Commission will hold a public hearing
on February 2, 2023. The Commission
will hold this hearing in-person and
telephonically. At this public hearing,
the Commission will hear testimony on
the projects listed in the SUPPLEMENTARY
INFORMATION section of this notice. Such
SUMMARY:
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
1625
projects are intended to be scheduled
for Commission action at its next
business meeting, tentatively scheduled
for March 16, 2023, which will be
noticed separately. The public should
take note that this public hearing will be
the only opportunity to offer oral
comment to the Commission for the
listed projects. The deadline for the
submission of written comments is
February 13, 2023.
DATES: The public hearing will convene
on February 2, 2023, at 6:30 p.m. The
public hearing will end at 9:00 p.m. or
at the conclusion of public testimony,
whichever is earlier. The deadline for
the submission of written comments is
Monday, February 13, 2023.
ADDRESSES: This public hearing will be
conducted in-person and virtually. You
may attend in person at Susquehanna
River Basin Commission, 4423 N Front
St., Harrisburg, Pennsylvania or join by
telephone using Toll Free Number 1–
877–304–9269 and then entering guest
passcode 2619070 followed by #.
FOR FURTHER INFORMATION CONTACT:
Jason Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423 or joyler@srbc.net.
Information concerning the applications
for the projects is available at the
Commission’s Water Application and
Approval Viewer at https://
www.srbc.net/waav. Additional
supporting documents are available to
inspect and copy in accordance with the
Commission’s Access to Records Policy
at www.srbc.net/regulatory/policiesguidance/docs/access-to-records-policy2009-02.pdf.
SUPPLEMENTARY INFORMATION: The
public hearing will cover the following
projects:
Projects Scheduled for Action
1. Project Sponsor: Biglerville
Borough Authority. Project Facility:
Biglerville Borough Water Company,
Biglerville Borough and Butler
Township, Adams County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.112 mgd (30-day
average) from Well 7 (Docket No.
19930503).
2. Project Sponsor and Facility: BKV
Operating, LLC (North Branch
Wyalusing Creek), Middletown
Township, Susquehanna County, Pa.
Application for surface water
withdrawal of up to 2.731 mgd (peak
day).
3. Project Sponsor and Facility:
Dillsburg Area Authority, Carroll
Township, York County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.460 mgd (30-day
E:\FR\FM\11JAN1.SGM
11JAN1
Agencies
[Federal Register Volume 88, Number 7 (Wednesday, January 11, 2023)]
[Notices]
[Pages 1624-1625]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-00375]
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Projects Approved for Minor Modifications
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice lists the minor modifications approved for a
previously approved project by the Susquehanna River Basin Commission
during the period set forth in DATES.
DATES: December 1-31, 2022.
[[Page 1625]]
ADDRESSES: Susquehanna River Basin Commission, 4423 North Front Street,
Harrisburg, PA 17110-1788.
FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone: (717) 238-0423, ext. 1312; fax
(717) 238-2436; email: [email protected]. Regular mail inquiries may be
sent to the above address.
SUPPLEMENTARY INFORMATION: This notice lists previously approved
projects, receiving approval of minor modifications, described below,
pursuant to 18 CFR 806.18 or to Commission Resolution Nos. 2013-11 and
2015-06 for the time period specified above.
1. Inflection Energy (PA) LLC (Loyalsock Creek), Docket No.
20221214, Upper Fairfield Township, Lycoming County, Pa.; approval to
change intake design and location; Approval Date: December 28, 2022.
Authority: Public Law 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806 and 808.
Dated: January 6, 2023.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2023-00375 Filed 1-10-23; 8:45 am]
BILLING CODE 7040-01-P