Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2394–008;
ER10–2395–008.
Applicants: Colorado Power Partners,
BIV Generation Company, L.L.C.
Description: Updated Market Power
Analysis for Northwest Region of BIV
Generation Company, L.L.C., et al.
Filed Date: 12/28/22.
Accession Number: 20221228–5221.
Comment Date: 5 p.m. ET 1/18/23.
Docket Numbers: ER11–2753–009;
ER12–1316–008.
Applicants: Silver State Solar Power
North, LLC, Cedar Point Wind, LLC.
Description: Triennial Market Power
Analysis for Northwest Region of Cedar
Point Wind, LLC, et al.
Filed Date: 12/29/22.
Accession Number: 20221229–5255.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER17–1217–002.
Applicants: Total Gas & Power North
America, Inc.
Description: Triennial Market Power
Analysis for Northwest Region of
TotalEnergies Gas & Power North
America, Inc.
Filed Date: 12/29/22.
Accession Number: 20221229–5258.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER20–2197–003.
Applicants: Atlantic City Electric
Company, PJM Interconnection, L.L.C.
Description: Compliance filing:
Atlantic City Electric Company submits
tariff filing per 35: ACE and Delmarva
Supplemental Compliance Filing ER20–
2197 & ER20–2198 to be effective 9/1/
2020.
Filed Date: 12/29/22.
Accession Number: 20221229–5100.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER22–1395–000.
Applicants: Public Service Company
of New Mexico.
Description: Refund Report: Refund
Report to be effective N/A.
Filed Date: 12/29/22.
Accession Number: 20221229–5227.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23–101–001.
Applicants: North East Offshore, LLC.
Description: Market: Market Base Rate
Triennial Review to be effective 12/30/
2022.
Filed Date: 12/29/22.
Accession Number: 20221229–5208.
Comment Date: 5 p.m. ET 2/27/23.
VerDate Sep<11>2014
18:21 Jan 06, 2023
Jkt 259001
Docket Numbers: ER23–102–001.
Applicants: Revolution Wind, LLC.
Description: Market: Market Base Rate
Triennial Review to be effective 12/30/
2022.
Filed Date: 12/29/22.
Accession Number: 20221229–5212.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER23–103–001.
Applicants South Fork Wind, LLC.
Description: Market: Market Base Rate
Triennial Review to be effective 12/30/
2022.
Filed Date: 12/29/22.
Accession Number: 20221229–5211.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER23–104–001.
Applicants Sunrise Wind LLC.
Description: Market: Market Base Rate
Triennial Review to be effective 12/30/
2022.
Filed Date: 12/29/22.
Accession Number: 20221229–5217.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER23–337–001.
Applicants Southwest Power Pool,
Inc.
Description: Tariff Amendment:
3599R1 Missouri Electric Commission
NITSA NOA to be effective 1/1/2023.
Filed Date: 12/29/22.
Accession Number: 20221229–5098.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23–739–000.
Applicants ISO New England Inc.,
Eversource Energy Service Company (as
agent), New England Power Pool
Participants Committee, The United
Illuminating Company.
Description: § 205(d) Rate Filing: ISO
New England Inc. submits tariff filing
per 35.13(a)(2)(iii: Revisions to Enable
Treatment of Storage as TransmissionOnly Asset—Part 1 of 2 to be effective
12/31/9998.
Filed Date: 12/29/22.
Accession Number: 20221229–5051.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23–740–000.
Applicants Evergy Kansas Central,
Inc.
Description: § 205(d) Rate Filing:
Amendment, Market-Based Rate Tariff
to be effective 2/13/2023.
Filed Date: 12/29/22.
Accession Number: 20221229–5061.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23–741–000.
Applicants Evergy Metro, Inc.
Description: § 205(d) Rate Filing:
Amendment, Market-Based Rate Tariff
to be effective 2/27/2023.
Filed Date: 12/29/22.
Accession Number: 20221229–5064.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23–742–000.
Applicants: Evergy Missouri West,
Inc.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Description:: § 205(d) Rate Filing:
Amendment, Market-Based Rate Tariff
to be effective 2/27/2023.
Filed Date: 12/29/22.
Accession Number: 20221229–5067.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23–743–000.
Applicants: ISO New England Inc.,
Eversource Energy Service Company (as
agent),The United Illuminating
Company, New England Power Pool
Participants Committee.
Description:: § 205(d) Rate Filing: ISO
New England Inc. submits tariff filing
per 35.13(a)(2)(iii: Revisions to Enable
Treatment of Storage as TransmissionOnly Assets—Part 2 of 2 to be effective
12/31/9998.
Filed Date: 12/29/22.
Accession Number: 20221229–5086.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23–744–000.
Applicants: Occidental Power
Marketing, L.P.
Description: Market: Occidental
Power Marketing, L.P. Updated Market
Power Analysis to be effective 12/30/
2022.
Filed Date:12/29/22.
Accession Number: 20221229–5137.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER23–745–000.
Applicants: Occidental Power
Services, Inc.
Description: Market: Occidental
Power Services, Inc. Updated Market
Power Analysis to be effective 12/30/
2022.
Filed Date: 12/29/22.
Accession Number: 20221229–5138.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER23–746–000.
Applicants: OTCF, LLC.
Description: Market: OTCF, LLC
Updated Market Power Analysis to be
effective 12/30/2022.
Filed Date: 12/29/22.
Accession Number: 20221229–5139.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER23–747–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised ISA, Service Agreement No.
1435; Queue AC1–008_AC2–071_AG1–
001 to be effective 11/29/2022.
Filed Date: 12/29/22.
Accession Number: 20221229–5144.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23–748–000.
Applicants: Power 2 Profit Energy
Solutions, Inc.
Description: Baseline eTariff Filing:
Market-Based Rate Tariff Application to
be effective 1/1/2023.
Filed Date: 12/29/22.
Accession Number: 20221229–5184.
E:\FR\FM\09JAN1.SGM
09JAN1
Federal Register / Vol. 88, No. 5 / Monday, January 9, 2023 / Notices
Comment Date: 5 p.m. ET 1/19/23
Docket Numbers: ER23–749–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original NSA, Service Agreement No.
6722; Queue No. AE1–155 to be
effective 11/30/2022.
Filed Date: 12/29/22.
Accession Number: 20221229–5271.
Comment Date: 5 p.m. ET 1/19/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 29, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–00097 Filed 1–6–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1121–136]
lotter on DSK11XQN23PROD with NOTICES1
Pacific Gas and Electric Company;
Notice of Application for Amendment
of License, Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Application for
non-capacity amendment of license.
b. Project No.: 1121–136.
c. Date Filed: October 28, 2022.
d. Licensee: Pacific Gas and Electric
Company.
e. Name of Project: Battle Creek
Hydroelectric Project.
f. Location: On the mainstem Battle
Creek, and on the North Fork and South
Fork Battle Creek in Shasta and Tehama
Counties, California.
VerDate Sep<11>2014
18:21 Jan 06, 2023
Jkt 259001
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Licensee Contact: Richard Doble,
Pacific Gas and Electric Company, Mail
Code N11D, P.O. Box 770000, San
Francisco, CA 94177, (415) 260–2675,
Richard.Doble@PGE.com.
i. FERC Contact: Rebecca Martin,
(202) 502–6012, Rebecca.martin@
ferc.gov.
j. Deadline for filing comments,
interventions, and protests: January 30,
2023.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426. The first
page of any filing should include docket
number P–1121–136. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: Pacific Gas
and Electric Company (licensee or
PG&E) is requesting that its license for
the Battle Creek Hydroelectric Project be
amended to remove Inskip Diversion
Dam, adjacent infrastructure, fish
ladder, and approximately 30,000 to
56,000 cubic yards of sediment from
behind the dam. No changes to longterm operations of the project are
proposed. Erosion of the sluiceway and
dam toe present a continuing facility
safety risk. Inskip Canal and
Powerhouse are currently offline, and
there are no plans to bring them back
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
1215
online. PG&E notified the Commission
of its intent not to relicense the project
and no other entity has expressed an
interest in relicensing the project. Inskip
Diversion Dam would be removed and
the inlet into Inskip Canal from Inskip
Diversion Dam would be plugged. Once
stored sediment is dredged and the dam
is removed, the stream channel would
be restored to a natural condition.
Restoration of the channel is proposed
upstream of the existing dam and would
be designed to include a series of pools
and riffles/steps/cascades to provide
channel bed stability. Bank stabilization
and revegetation would be implemented
within the work area to ensure longterm stability of the restored stream
banks.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
E:\FR\FM\09JAN1.SGM
09JAN1
Agencies
[Federal Register Volume 88, Number 5 (Monday, January 9, 2023)]
[Notices]
[Pages 1214-1215]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-00097]
[[Page 1214]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2394-008; ER10-2395-008.
Applicants: Colorado Power Partners, BIV Generation Company, L.L.C.
Description: Updated Market Power Analysis for Northwest Region of
BIV Generation Company, L.L.C., et al.
Filed Date: 12/28/22.
Accession Number: 20221228-5221.
Comment Date: 5 p.m. ET 1/18/23.
Docket Numbers: ER11-2753-009; ER12-1316-008.
Applicants: Silver State Solar Power North, LLC, Cedar Point Wind,
LLC.
Description: Triennial Market Power Analysis for Northwest Region
of Cedar Point Wind, LLC, et al.
Filed Date: 12/29/22.
Accession Number: 20221229-5255.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER17-1217-002.
Applicants: Total Gas & Power North America, Inc.
Description: Triennial Market Power Analysis for Northwest Region
of TotalEnergies Gas & Power North America, Inc.
Filed Date: 12/29/22.
Accession Number: 20221229-5258.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER20-2197-003.
Applicants: Atlantic City Electric Company, PJM Interconnection,
L.L.C.
Description: Compliance filing: Atlantic City Electric Company
submits tariff filing per 35: ACE and Delmarva Supplemental Compliance
Filing ER20-2197 & ER20-2198 to be effective 9/1/2020.
Filed Date: 12/29/22.
Accession Number: 20221229-5100.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER22-1395-000.
Applicants: Public Service Company of New Mexico.
Description: Refund Report: Refund Report to be effective N/A.
Filed Date: 12/29/22.
Accession Number: 20221229-5227.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23-101-001.
Applicants: North East Offshore, LLC.
Description: Market: Market Base Rate Triennial Review to be
effective 12/30/2022.
Filed Date: 12/29/22.
Accession Number: 20221229-5208.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER23-102-001.
Applicants: Revolution Wind, LLC.
Description: Market: Market Base Rate Triennial Review to be
effective 12/30/2022.
Filed Date: 12/29/22.
Accession Number: 20221229-5212.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER23-103-001.
Applicants South Fork Wind, LLC.
Description: Market: Market Base Rate Triennial Review to be
effective 12/30/2022.
Filed Date: 12/29/22.
Accession Number: 20221229-5211.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER23-104-001.
Applicants Sunrise Wind LLC.
Description: Market: Market Base Rate Triennial Review to be
effective 12/30/2022.
Filed Date: 12/29/22.
Accession Number: 20221229-5217.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER23-337-001.
Applicants Southwest Power Pool, Inc.
Description: Tariff Amendment: 3599R1 Missouri Electric Commission
NITSA NOA to be effective 1/1/2023.
Filed Date: 12/29/22.
Accession Number: 20221229-5098.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23-739-000.
Applicants ISO New England Inc., Eversource Energy Service Company
(as agent), New England Power Pool Participants Committee, The United
Illuminating Company.
Description: Sec. 205(d) Rate Filing: ISO New England Inc. submits
tariff filing per 35.13(a)(2)(iii: Revisions to Enable Treatment of
Storage as Transmission-Only Asset--Part 1 of 2 to be effective 12/31/
9998.
Filed Date: 12/29/22.
Accession Number: 20221229-5051.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23-740-000.
Applicants Evergy Kansas Central, Inc.
Description: Sec. 205(d) Rate Filing: Amendment, Market-Based Rate
Tariff to be effective 2/13/2023.
Filed Date: 12/29/22.
Accession Number: 20221229-5061.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23-741-000.
Applicants Evergy Metro, Inc.
Description: Sec. 205(d) Rate Filing: Amendment, Market-Based Rate
Tariff to be effective 2/27/2023.
Filed Date: 12/29/22.
Accession Number: 20221229-5064.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23-742-000.
Applicants: Evergy Missouri West, Inc.
Description:: Sec. 205(d) Rate Filing: Amendment, Market-Based
Rate Tariff to be effective 2/27/2023.
Filed Date: 12/29/22.
Accession Number: 20221229-5067.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23-743-000.
Applicants: ISO New England Inc., Eversource Energy Service Company
(as agent),The United Illuminating Company, New England Power Pool
Participants Committee.
Description:: Sec. 205(d) Rate Filing: ISO New England Inc.
submits tariff filing per 35.13(a)(2)(iii: Revisions to Enable
Treatment of Storage as Transmission-Only Assets--Part 2 of 2 to be
effective 12/31/9998.
Filed Date: 12/29/22.
Accession Number: 20221229-5086.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23-744-000.
Applicants: Occidental Power Marketing, L.P.
Description: Market: Occidental Power Marketing, L.P. Updated
Market Power Analysis to be effective 12/30/2022.
Filed Date:12/29/22.
Accession Number: 20221229-5137.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER23-745-000.
Applicants: Occidental Power Services, Inc.
Description: Market: Occidental Power Services, Inc. Updated Market
Power Analysis to be effective 12/30/2022.
Filed Date: 12/29/22.
Accession Number: 20221229-5138.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER23-746-000.
Applicants: OTCF, LLC.
Description: Market: OTCF, LLC Updated Market Power Analysis to be
effective 12/30/2022.
Filed Date: 12/29/22.
Accession Number: 20221229-5139.
Comment Date: 5 p.m. ET 2/27/23.
Docket Numbers: ER23-747-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: First Revised ISA, Service
Agreement No. 1435; Queue AC1-008_AC2-071_AG1-001 to be effective 11/
29/2022.
Filed Date: 12/29/22.
Accession Number: 20221229-5144.
Comment Date: 5 p.m. ET 1/19/23.
Docket Numbers: ER23-748-000.
Applicants: Power 2 Profit Energy Solutions, Inc.
Description: Baseline eTariff Filing: Market-Based Rate Tariff
Application to be effective 1/1/2023.
Filed Date: 12/29/22.
Accession Number: 20221229-5184.
[[Page 1215]]
Comment Date: 5 p.m. ET 1/19/23
Docket Numbers: ER23-749-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original NSA, Service
Agreement No. 6722; Queue No. AE1-155 to be effective 11/30/2022.
Filed Date: 12/29/22.
Accession Number: 20221229-5271.
Comment Date: 5 p.m. ET 1/19/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 29, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-00097 Filed 1-6-23; 8:45 am]