Combined Notice of Filings #1, 1214-1215 [2023-00097]

Download as PDF 1214 Federal Register / Vol. 88, No. 5 / Monday, January 9, 2023 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission lotter on DSK11XQN23PROD with NOTICES1 Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2394–008; ER10–2395–008. Applicants: Colorado Power Partners, BIV Generation Company, L.L.C. Description: Updated Market Power Analysis for Northwest Region of BIV Generation Company, L.L.C., et al. Filed Date: 12/28/22. Accession Number: 20221228–5221. Comment Date: 5 p.m. ET 1/18/23. Docket Numbers: ER11–2753–009; ER12–1316–008. Applicants: Silver State Solar Power North, LLC, Cedar Point Wind, LLC. Description: Triennial Market Power Analysis for Northwest Region of Cedar Point Wind, LLC, et al. Filed Date: 12/29/22. Accession Number: 20221229–5255. Comment Date: 5 p.m. ET 2/27/23. Docket Numbers: ER17–1217–002. Applicants: Total Gas & Power North America, Inc. Description: Triennial Market Power Analysis for Northwest Region of TotalEnergies Gas & Power North America, Inc. Filed Date: 12/29/22. Accession Number: 20221229–5258. Comment Date: 5 p.m. ET 2/27/23. Docket Numbers: ER20–2197–003. Applicants: Atlantic City Electric Company, PJM Interconnection, L.L.C. Description: Compliance filing: Atlantic City Electric Company submits tariff filing per 35: ACE and Delmarva Supplemental Compliance Filing ER20– 2197 & ER20–2198 to be effective 9/1/ 2020. Filed Date: 12/29/22. Accession Number: 20221229–5100. Comment Date: 5 p.m. ET 1/19/23. Docket Numbers: ER22–1395–000. Applicants: Public Service Company of New Mexico. Description: Refund Report: Refund Report to be effective N/A. Filed Date: 12/29/22. Accession Number: 20221229–5227. Comment Date: 5 p.m. ET 1/19/23. Docket Numbers: ER23–101–001. Applicants: North East Offshore, LLC. Description: Market: Market Base Rate Triennial Review to be effective 12/30/ 2022. Filed Date: 12/29/22. Accession Number: 20221229–5208. Comment Date: 5 p.m. ET 2/27/23. VerDate Sep<11>2014 18:21 Jan 06, 2023 Jkt 259001 Docket Numbers: ER23–102–001. Applicants: Revolution Wind, LLC. Description: Market: Market Base Rate Triennial Review to be effective 12/30/ 2022. Filed Date: 12/29/22. Accession Number: 20221229–5212. Comment Date: 5 p.m. ET 2/27/23. Docket Numbers: ER23–103–001. Applicants South Fork Wind, LLC. Description: Market: Market Base Rate Triennial Review to be effective 12/30/ 2022. Filed Date: 12/29/22. Accession Number: 20221229–5211. Comment Date: 5 p.m. ET 2/27/23. Docket Numbers: ER23–104–001. Applicants Sunrise Wind LLC. Description: Market: Market Base Rate Triennial Review to be effective 12/30/ 2022. Filed Date: 12/29/22. Accession Number: 20221229–5217. Comment Date: 5 p.m. ET 2/27/23. Docket Numbers: ER23–337–001. Applicants Southwest Power Pool, Inc. Description: Tariff Amendment: 3599R1 Missouri Electric Commission NITSA NOA to be effective 1/1/2023. Filed Date: 12/29/22. Accession Number: 20221229–5098. Comment Date: 5 p.m. ET 1/19/23. Docket Numbers: ER23–739–000. Applicants ISO New England Inc., Eversource Energy Service Company (as agent), New England Power Pool Participants Committee, The United Illuminating Company. Description: § 205(d) Rate Filing: ISO New England Inc. submits tariff filing per 35.13(a)(2)(iii: Revisions to Enable Treatment of Storage as TransmissionOnly Asset—Part 1 of 2 to be effective 12/31/9998. Filed Date: 12/29/22. Accession Number: 20221229–5051. Comment Date: 5 p.m. ET 1/19/23. Docket Numbers: ER23–740–000. Applicants Evergy Kansas Central, Inc. Description: § 205(d) Rate Filing: Amendment, Market-Based Rate Tariff to be effective 2/13/2023. Filed Date: 12/29/22. Accession Number: 20221229–5061. Comment Date: 5 p.m. ET 1/19/23. Docket Numbers: ER23–741–000. Applicants Evergy Metro, Inc. Description: § 205(d) Rate Filing: Amendment, Market-Based Rate Tariff to be effective 2/27/2023. Filed Date: 12/29/22. Accession Number: 20221229–5064. Comment Date: 5 p.m. ET 1/19/23. Docket Numbers: ER23–742–000. Applicants: Evergy Missouri West, Inc. PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 Description:: § 205(d) Rate Filing: Amendment, Market-Based Rate Tariff to be effective 2/27/2023. Filed Date: 12/29/22. Accession Number: 20221229–5067. Comment Date: 5 p.m. ET 1/19/23. Docket Numbers: ER23–743–000. Applicants: ISO New England Inc., Eversource Energy Service Company (as agent),The United Illuminating Company, New England Power Pool Participants Committee. Description:: § 205(d) Rate Filing: ISO New England Inc. submits tariff filing per 35.13(a)(2)(iii: Revisions to Enable Treatment of Storage as TransmissionOnly Assets—Part 2 of 2 to be effective 12/31/9998. Filed Date: 12/29/22. Accession Number: 20221229–5086. Comment Date: 5 p.m. ET 1/19/23. Docket Numbers: ER23–744–000. Applicants: Occidental Power Marketing, L.P. Description: Market: Occidental Power Marketing, L.P. Updated Market Power Analysis to be effective 12/30/ 2022. Filed Date:12/29/22. Accession Number: 20221229–5137. Comment Date: 5 p.m. ET 2/27/23. Docket Numbers: ER23–745–000. Applicants: Occidental Power Services, Inc. Description: Market: Occidental Power Services, Inc. Updated Market Power Analysis to be effective 12/30/ 2022. Filed Date: 12/29/22. Accession Number: 20221229–5138. Comment Date: 5 p.m. ET 2/27/23. Docket Numbers: ER23–746–000. Applicants: OTCF, LLC. Description: Market: OTCF, LLC Updated Market Power Analysis to be effective 12/30/2022. Filed Date: 12/29/22. Accession Number: 20221229–5139. Comment Date: 5 p.m. ET 2/27/23. Docket Numbers: ER23–747–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: First Revised ISA, Service Agreement No. 1435; Queue AC1–008_AC2–071_AG1– 001 to be effective 11/29/2022. Filed Date: 12/29/22. Accession Number: 20221229–5144. Comment Date: 5 p.m. ET 1/19/23. Docket Numbers: ER23–748–000. Applicants: Power 2 Profit Energy Solutions, Inc. Description: Baseline eTariff Filing: Market-Based Rate Tariff Application to be effective 1/1/2023. Filed Date: 12/29/22. Accession Number: 20221229–5184. E:\FR\FM\09JAN1.SGM 09JAN1 Federal Register / Vol. 88, No. 5 / Monday, January 9, 2023 / Notices Comment Date: 5 p.m. ET 1/19/23 Docket Numbers: ER23–749–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original NSA, Service Agreement No. 6722; Queue No. AE1–155 to be effective 11/30/2022. Filed Date: 12/29/22. Accession Number: 20221229–5271. Comment Date: 5 p.m. ET 1/19/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 29, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–00097 Filed 1–6–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1121–136] lotter on DSK11XQN23PROD with NOTICES1 Pacific Gas and Electric Company; Notice of Application for Amendment of License, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Proceeding: Application for non-capacity amendment of license. b. Project No.: 1121–136. c. Date Filed: October 28, 2022. d. Licensee: Pacific Gas and Electric Company. e. Name of Project: Battle Creek Hydroelectric Project. f. Location: On the mainstem Battle Creek, and on the North Fork and South Fork Battle Creek in Shasta and Tehama Counties, California. VerDate Sep<11>2014 18:21 Jan 06, 2023 Jkt 259001 g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Licensee Contact: Richard Doble, Pacific Gas and Electric Company, Mail Code N11D, P.O. Box 770000, San Francisco, CA 94177, (415) 260–2675, Richard.Doble@PGE.com. i. FERC Contact: Rebecca Martin, (202) 502–6012, Rebecca.martin@ ferc.gov. j. Deadline for filing comments, interventions, and protests: January 30, 2023. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. The first page of any filing should include docket number P–1121–136. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: Pacific Gas and Electric Company (licensee or PG&E) is requesting that its license for the Battle Creek Hydroelectric Project be amended to remove Inskip Diversion Dam, adjacent infrastructure, fish ladder, and approximately 30,000 to 56,000 cubic yards of sediment from behind the dam. No changes to longterm operations of the project are proposed. Erosion of the sluiceway and dam toe present a continuing facility safety risk. Inskip Canal and Powerhouse are currently offline, and there are no plans to bring them back PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 1215 online. PG&E notified the Commission of its intent not to relicense the project and no other entity has expressed an interest in relicensing the project. Inskip Diversion Dam would be removed and the inlet into Inskip Canal from Inskip Diversion Dam would be plugged. Once stored sediment is dredged and the dam is removed, the stream channel would be restored to a natural condition. Restoration of the channel is proposed upstream of the existing dam and would be designed to include a series of pools and riffles/steps/cascades to provide channel bed stability. Bank stabilization and revegetation would be implemented within the work area to ensure longterm stability of the restored stream banks. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the E:\FR\FM\09JAN1.SGM 09JAN1

Agencies

[Federal Register Volume 88, Number 5 (Monday, January 9, 2023)]
[Notices]
[Pages 1214-1215]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-00097]



[[Page 1214]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2394-008; ER10-2395-008.
    Applicants: Colorado Power Partners, BIV Generation Company, L.L.C.
    Description: Updated Market Power Analysis for Northwest Region of 
BIV Generation Company, L.L.C., et al.
    Filed Date: 12/28/22.
    Accession Number: 20221228-5221.
    Comment Date: 5 p.m. ET 1/18/23.

    Docket Numbers: ER11-2753-009; ER12-1316-008.
    Applicants: Silver State Solar Power North, LLC, Cedar Point Wind, 
LLC.
    Description: Triennial Market Power Analysis for Northwest Region 
of Cedar Point Wind, LLC, et al.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5255.
    Comment Date: 5 p.m. ET 2/27/23.

    Docket Numbers: ER17-1217-002.
    Applicants: Total Gas & Power North America, Inc.
    Description: Triennial Market Power Analysis for Northwest Region 
of TotalEnergies Gas & Power North America, Inc.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5258.
    Comment Date: 5 p.m. ET 2/27/23.

    Docket Numbers: ER20-2197-003.
    Applicants: Atlantic City Electric Company, PJM Interconnection, 
L.L.C.
    Description: Compliance filing: Atlantic City Electric Company 
submits tariff filing per 35: ACE and Delmarva Supplemental Compliance 
Filing ER20-2197 & ER20-2198 to be effective 9/1/2020.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5100.
    Comment Date: 5 p.m. ET 1/19/23.

    Docket Numbers: ER22-1395-000.
    Applicants: Public Service Company of New Mexico.
    Description: Refund Report: Refund Report to be effective N/A.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5227.
    Comment Date: 5 p.m. ET 1/19/23.

    Docket Numbers: ER23-101-001.
    Applicants: North East Offshore, LLC.
    Description: Market: Market Base Rate Triennial Review to be 
effective 12/30/2022.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5208.
    Comment Date: 5 p.m. ET 2/27/23.

    Docket Numbers: ER23-102-001.
    Applicants: Revolution Wind, LLC.
    Description: Market: Market Base Rate Triennial Review to be 
effective 12/30/2022.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5212.
    Comment Date: 5 p.m. ET 2/27/23.

    Docket Numbers: ER23-103-001.
    Applicants South Fork Wind, LLC.
    Description: Market: Market Base Rate Triennial Review to be 
effective 12/30/2022.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5211.
    Comment Date: 5 p.m. ET 2/27/23.

    Docket Numbers: ER23-104-001.
    Applicants Sunrise Wind LLC.
    Description: Market: Market Base Rate Triennial Review to be 
effective 12/30/2022.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5217.
    Comment Date: 5 p.m. ET 2/27/23.

    Docket Numbers: ER23-337-001.
    Applicants Southwest Power Pool, Inc.
    Description: Tariff Amendment: 3599R1 Missouri Electric Commission 
NITSA NOA to be effective 1/1/2023.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5098.
    Comment Date: 5 p.m. ET 1/19/23.

    Docket Numbers: ER23-739-000.
    Applicants ISO New England Inc., Eversource Energy Service Company 
(as agent), New England Power Pool Participants Committee, The United 
Illuminating Company.
    Description: Sec.  205(d) Rate Filing: ISO New England Inc. submits 
tariff filing per 35.13(a)(2)(iii: Revisions to Enable Treatment of 
Storage as Transmission-Only Asset--Part 1 of 2 to be effective 12/31/
9998.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5051.
    Comment Date: 5 p.m. ET 1/19/23.

    Docket Numbers: ER23-740-000.
    Applicants Evergy Kansas Central, Inc.
    Description: Sec.  205(d) Rate Filing: Amendment, Market-Based Rate 
Tariff to be effective 2/13/2023.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5061.
    Comment Date: 5 p.m. ET 1/19/23.

    Docket Numbers: ER23-741-000.
    Applicants Evergy Metro, Inc.
    Description: Sec.  205(d) Rate Filing: Amendment, Market-Based Rate 
Tariff to be effective 2/27/2023.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5064.
    Comment Date: 5 p.m. ET 1/19/23.

    Docket Numbers: ER23-742-000.
    Applicants: Evergy Missouri West, Inc.
    Description:: Sec.  205(d) Rate Filing: Amendment, Market-Based 
Rate Tariff to be effective 2/27/2023.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5067.
    Comment Date: 5 p.m. ET 1/19/23.

    Docket Numbers: ER23-743-000.
    Applicants: ISO New England Inc., Eversource Energy Service Company 
(as agent),The United Illuminating Company, New England Power Pool 
Participants Committee.
    Description:: Sec.  205(d) Rate Filing: ISO New England Inc. 
submits tariff filing per 35.13(a)(2)(iii: Revisions to Enable 
Treatment of Storage as Transmission-Only Assets--Part 2 of 2 to be 
effective 12/31/9998.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5086.
    Comment Date: 5 p.m. ET 1/19/23.

    Docket Numbers: ER23-744-000.
    Applicants: Occidental Power Marketing, L.P.
    Description: Market: Occidental Power Marketing, L.P. Updated 
Market Power Analysis to be effective 12/30/2022.
    Filed Date:12/29/22.
    Accession Number: 20221229-5137.
    Comment Date: 5 p.m. ET 2/27/23.

    Docket Numbers: ER23-745-000.
    Applicants: Occidental Power Services, Inc.
    Description: Market: Occidental Power Services, Inc. Updated Market 
Power Analysis to be effective 12/30/2022.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5138.
    Comment Date: 5 p.m. ET 2/27/23.

    Docket Numbers: ER23-746-000.
    Applicants: OTCF, LLC.
    Description: Market: OTCF, LLC Updated Market Power Analysis to be 
effective 12/30/2022.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5139.
    Comment Date: 5 p.m. ET 2/27/23.

    Docket Numbers: ER23-747-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: First Revised ISA, Service 
Agreement No. 1435; Queue AC1-008_AC2-071_AG1-001 to be effective 11/
29/2022.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5144.
    Comment Date: 5 p.m. ET 1/19/23.

    Docket Numbers: ER23-748-000.
    Applicants: Power 2 Profit Energy Solutions, Inc.
    Description: Baseline eTariff Filing: Market-Based Rate Tariff 
Application to be effective 1/1/2023.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5184.

[[Page 1215]]

    Comment Date: 5 p.m. ET 1/19/23

    Docket Numbers: ER23-749-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original NSA, Service 
Agreement No. 6722; Queue No. AE1-155 to be effective 11/30/2022.
    Filed Date: 12/29/22.
    Accession Number: 20221229-5271.
    Comment Date: 5 p.m. ET 1/19/23.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: December 29, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-00097 Filed 1-6-23; 8:45 am]
BILLING CODE 6717-01-P