Allete, Inc.; Notice of Waiver Period for Water Quality Certification Application, 79881 [2022-28254]
Download as PDF
Federal Register / Vol. 87, No. 248 / Wednesday, December 28, 2022 / Notices
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: December 21, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–28251 Filed 12–27–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15249–001]
ddrumheller on DSK6VXHR33PROD with NOTICES
Lewis Ridge Pumped Storage, LLC;
Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 15249–001.
c. Dated Filed: October 21, 2022.
d. Submitted By: Lewis Ridge Pumped
Storage, LLC.
e. Name of Project: Lewis Ridge
Pumped Storage Project.
f. Location: On Tom Fork near the
communities of Blackmont, Tejay,
Balkan, and Callaway, in Bell County,
Kentucky. The project would not
occupy any federal lands.
g. Filed Pursuant to: 18 CFR 5.5 of the
Commission’s regulations.
h. Applicant Contact: Sandy Slayton,
Vice President, Lewis Ridge Pumped
Storage, LLC, 830 NE Holladay Street,
Portland, Oregon 97232; Phone: (206)
919–3976, Email: sandy@
ryedevelopment.com.
i. FERC Contact: Michael Spencer at
(202) 502–6093 or michael.spencer@
ferc.gov.
j. Lewis Ridge Pumped Storage, LLC.
(Lew(s R(dge) filed its request to use the
Traditional Licensing Process on
VerDate Sep<11>2014
19:20 Dec 27, 2022
Jkt 259001
October 21, 2022. Lew(s R(dge provided
public notice of its request on October
19, 2022. In a letter dated December 21,
2022, the Director of the Division of
Hydropower Licensing approved Lew(s
R(dge’s request to use the Traditional
Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
Kentucky State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Lewis Ridge as the Commission’s nonfederal representative for carrying out
informal consultation, pursuant to
section 7 of the Endangered Species Act
and section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act; and consultation
pursuant to section 106 of the National
Historic Preservation Act.
m. Lewis Ridge filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD may be viewed
on the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY).
o. Register online at https://
ferconline.ferc.gov/eSubscription.aspx
to be notified via email of new filing
and issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
Dated: December 21, 2022.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2361–056]
Allete, Inc.; Notice of Waiver Period for
Water Quality Certification Application
On December 19, 2022, Allete, Inc.
submitted to the Federal Energy
Regulatory Commission (Commission) a
copy of its application for a Clean Water
Act section 401(a)(1) water quality
certification filed with the Minnesota
Pollution Control Agency (Minnesota
PCA), in conjunction with the above
captioned project. Pursuant to 40 CFR
121.6 and section 5.23(b) of the
Commission’s regulations, 1 we hereby
notify the Minnesota PCA of the
following:
Date of Receipt of the Certification
Request: December 14, 2022
Reasonable Period of Time To Act on
the Certification Request: One year
(December 14, 2023)
If the Minnesota PCA fails or refuses
to act on the water quality certification
request on or before the above date, then
the agency certifying authority is
deemed waived pursuant to section
401(a)(1) of the Clean Water Act, 33
U.S.C. 1341(a)(1).
Dated: December 21, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–28254 Filed 12–27–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2570–034]
Eagle Creek Racine Hydro, LLC; Notice
of Waiver Period for Water Quality
Certification Application
On December 21, 2022, Eagle Creek
Racine Hydro, LLC submitted to the
Federal Energy Regulatory Commission
(Commission) a copy of its application
for a Clean Water Act section 401(a)(1)
water quality certification filed with the
Ohio Environmental Protection Agency
(Ohio EPA), in conjunction with the
above captioned project. Pursuant to 40
CFR 121.6 and section 5.23(b) of the
Commission’s regulations,1 we hereby
notify the Ohio EPA of the following:
Date of Receipt of the Certification
Request: December 20, 2022
[FR Doc. 2022–28249 Filed 12–27–22; 8:45 am]
1
BILLING CODE 6717–01–P
PO 00000
Frm 00033
Fmt 4703
1
Sfmt 4703
79881
18 CFR 5.23(b).
18 CFR 5.23(b).
E:\FR\FM\28DEN1.SGM
28DEN1
Agencies
[Federal Register Volume 87, Number 248 (Wednesday, December 28, 2022)]
[Notices]
[Page 79881]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-28254]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2361-056]
Allete, Inc.; Notice of Waiver Period for Water Quality
Certification Application
On December 19, 2022, Allete, Inc. submitted to the Federal Energy
Regulatory Commission (Commission) a copy of its application for a
Clean Water Act section 401(a)(1) water quality certification filed
with the Minnesota Pollution Control Agency (Minnesota PCA), in
conjunction with the above captioned project. Pursuant to 40 CFR 121.6
and section 5.23(b) of the Commission's regulations,\1\ we hereby
notify the Minnesota PCA of the following:
---------------------------------------------------------------------------
\1\ 18 CFR 5.23(b).
Date of Receipt of the Certification Request: December 14, 2022
Reasonable Period of Time To Act on the Certification Request: One year
(December 14, 2023)
If the Minnesota PCA fails or refuses to act on the water quality
certification request on or before the above date, then the agency
certifying authority is deemed waived pursuant to section 401(a)(1) of
the Clean Water Act, 33 U.S.C. 1341(a)(1).
Dated: December 21, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-28254 Filed 12-27-22; 8:45 am]