Actions Taken at December 15, 2022 Meeting, 79415-79416 [2022-28055]
Download as PDF
Federal Register / Vol. 87, No. 247 / Tuesday, December 27, 2022 / Notices
79415
"Other Items" is a combination of Purchased Services, Casualties and Insurance,
General and Administrative, Other Taxes, Loss and Damage, and Special Charges, price changes
for all of which are measured by the Producer Price Index for Industrial Commodities Less Fuel
and Related Products and Power.
1
Linking is necessitated by a change to the 2021 weights beginning in the fourth quarter
of 2022. The following formula was used for the current quarter's index:
2
1st Qr. 2023 Index
(2021 Weights)
4th Qr. 2022 Index
(2021 Weights)
Times 4th Quarter Linked Index
(1980 = 100 Linked)
Equals Linked Index
(Current Quarter)
Or
377.4 X 331.3 = 346.7
360.6
The first quarter 2023 RCAF was rebased using the October 1, 2022 level of 342.3 in
accordance with the requirements of the Staggers Rail Act of 1980 (10/1/2022 = 100). For the
purpose of calculating the fourth quarter 2022 linked index (2022Q4 = 100), where the fourth
quarter 2022 linked index equals 100 after the forecast error adjustment, the fourth quarter 2022
RCAF is also recalculated using the October 1, 2022 level of 342.3.
3
The first quarter 2023 forecast error adjustment was calculated as follows: (a) third
quarter 2022 RCAF using forecasted data equals 96.0; (b) third quarter 2022 RCAF using actual
data equals 95.7; and (c) the difference equals the forecast error (b-a) of -0.3. Because the actual
third quarter value is less than the forecast value, the difference is subtracted from the
Preliminary RCAF.
joyler@srbc.net. Regular mail inquiries
may be sent to the above address. See
also Commission website at
www.srbc.net.
[FR Doc. 2022–28110 Filed 12–23–22; 8:45 am]
BILLING CODE 4915–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
In
addition to the actions taken on projects
identified in the summary above these
actions were also taken: (1) adoption of
the regulatory program fee schedule for
CY2023; (2) adoption of a resolution
recognizing the 50th anniversary of the
Clean Water Act; (3) and approval of
contracts, grants and agreements.
SUPPLEMENTARY INFORMATION:
Actions Taken at December 15, 2022
Meeting
Susquehanna River Basin
Commission
ACTION: Notice.
AGENCY:
As part of its regular business
meeting held on December 15, 2022, in
Harrisburg, Pennsylvania, the
Commission approved the applications
of certain water resources projects, and
took additional actions, as set forth in
the Supplementary Information below.
DATES: December 15, 2022.
ADDRESSES: Susquehanna River Basin
Commission, 4423 N Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel and
Secretary, telephone: (717) 238–0423,
ext. 1312, fax: (717) 238–2436; email:
TKELLEY on DSK125TN23PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
22:43 Dec 23, 2022
Jkt 259001
Project Applications Approved
1. Project Sponsor and Facility:
Blossburg Municipal Authority, Bloss
Township, Tioga County, Pa.
Applications for groundwater
withdrawals (30-day averages) of up to
0.144 mgd from Taylor Run Well 1 and
0.144 mgd from Taylor Run Well 3.
2. Project Sponsor and Facility:
BlueTriton Brands, Inc. (Valley View
Springs), Hegins Township, Schuylkill
County, Pa. Applications for renewal of
surface water withdrawal of up to 0.200
mgd (peak day) and consumptive use of
PO 00000
Frm 00143
Fmt 4703
Sfmt 4703
up to 0.200 mgd (peak day) (Docket No.
19971101).
3. Project Sponsor: Constellation
Energy Generation, LLC. Project
Facility: Three Mile Island Generating
Station, Londonderry Township,
Dauphin County, Pa. Applications for
renewal of groundwater withdrawals
(30-day averages) of up to 0.099 mgd
from Well A, 0.099 mgd from Well B,
and 0.099 mgd from Well C (Docket No.
20110610), and Commission-initiated
modification of surface water and
consumptive use approvals based on
changes in operating status of the
project and revised demand projections.
4. Project Sponsor: Corning
Incorporated. Project Facility: Corporate
Headquarters, City of Corning, Steuben
County, N.Y. Application for renewal of
groundwater withdrawal of up to 1.440
mgd (30-day average) from Well 6A
(Docket No. 19981201).
5. Project Sponsor and Facility: Dover
Township, York County, Pa.
Applications for groundwater
withdrawals (30-day averages) of up to
0.088 mgd from Well 10 (Docket No.
19911104).
E:\FR\FM\27DEN1.SGM
27DEN1
EN27DE22.035
4
TKELLEY on DSK125TN23PROD with NOTICES
79416
Federal Register / Vol. 87, No. 247 / Tuesday, December 27, 2022 / Notices
6. Project Sponsor and Facility:
Hughesville Borough Authority, Wolf
Township, Lycoming County, Pa.
Applications for renewal of
groundwater withdrawals (30-day
averages) of up to 0.260 mgd from Well
1, 0.260 mgd from Well 2, and 1.440
mgd from Well 3 (Docket No.
20070604).
7. Project Sponsor: Municipal
Authority of the Township of East
Hempfield. Project Facility: Hempfield
Water Authority, East Hempfield
Township, Lancaster County, Pa.
Applications for renewal of
groundwater withdrawals (30-day
averages) of up to 0.353 mgd from Well
6, 0.145 mgd from Well 7, 1.447 mgd
from Well 8, and 1.800 mgd from Well
11, and Commission-initiated
modification to Docket No. 20120906,
which approves withdrawals from Wells
1, 2, 3, 4, and 5 and Spring S–1 (Docket
Nos. 19870306, 19890503, 19930101,
and 20120906).
8. Project Sponsor and Facility:
Repsol Oil & Gas USA, LLC (Choconut
Creek), Choconut Township,
Susquehanna County, Pa. Application
for renewal of surface water withdrawal
of up to 0.999 mgd (peak day) (Docket
No. 20171206).
9. Project Sponsor: State College
Friends Limited Partnership. Project
Facility: Toftrees Golf Resort (Pond 9),
Patton Township, Centre County, Pa.
Applications for surface water
withdrawal of up to 0.750 mgd (peak
day), and renewal with modification to
increase consumptive use (peak day) by
an additional 0.480 mgd, for a total
consumptive use of up to 0.750 mgd
(Docket No. 20021010).
10. Project Sponsor and Facility: SWN
Production Company, LLC (Lycoming
Creek), Lewis Township, Lycoming
County, Pa. Application for renewal of
surface water withdrawal of up to 0.500
mgd (peak day) (Docket No. 20171208).
11. Project Sponsor and Facility: SWN
Production Company, LLC (Lycoming
Creek), McIntyre Township, Lycoming
County, Pa. Application for renewal of
surface water withdrawal of up to 0.500
mgd (peak day) (Docket No. 20171209).
12. Project Sponsor: The United States
Department of Veterans Affairs. Project
Facility: Indiantown Gap National
Cemetery, East Hanover and Union
Townships, Lebanon County, Pa.
Application for consumptive use of up
to 0.099 mgd (30-day average).
13. Project Sponsor: Veolia Water
Pennsylvania, Inc. Project Facility:
Grantham Operation, Upper Allen
Township, Cumberland County, Pa.
Application for renewal of groundwater
withdrawal of up to 0.395 mgd (30-day
VerDate Sep<11>2014
22:43 Dec 23, 2022
Jkt 259001
average) from Well 2 (Docket No.
19901104).
Project Scheduled for Action Involving
a Diversion
1. Project Sponsor and Facility:
BlueTriton Brands, Inc. (Valley View
Springs), Hegins Township, Schuylkill
County, Pa. Application for approval of
an out-of-basin diversion of up to 0.200
mgd (peak day).
Project Tabled
1. Project Sponsor and Facility: Dover
Township, York County, Pa.
Applications for groundwater
withdrawals (30-day averages) of up to
0.360 mgd from Well 8 (Docket No.
19911104).
Authority: Public Law 91–575, 84
Stat. 1509 et seq., 18 CFR parts 806, 807,
and 808.
Dated: December 20, 2022.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2022–28055 Filed 12–23–22; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Projects Approved for Consumptive
Uses of Water
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
This notice lists Approvals by
Rule for projects by the Susquehanna
River Basin Commission during the
period set forth in DATES.
DATES: November 1–30, 2022.
ADDRESSES: Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423, ext. 1312; fax: (717)
238–2436; email: joyler@srbc.net.
Regular mail inquiries may be sent to
the above address.
SUPPLEMENTARY INFORMATION: This
notice lists the projects, described
below, receiving approval for the
consumptive use of water pursuant to
the Commission’s approval by rule
process set forth in 18 CFR 806.22 (f) for
the time period specified above:
Water Source Approval—Issued
Under 18 CFR 806.22 f):
1. Chesapeake Appalachia, L.L.C. ;
Pad ID: Keeler Hollow; ABR–
201009041.R2; Smithfield Township,
Bradford County, Pa.; Consumptive Use
SUMMARY:
PO 00000
Frm 00144
Fmt 4703
Sfmt 4703
of Up to 7.5000 mgd; Approval Date:
November 14, 2022.
2. EXCO Resources (PA), LLC; Pad ID:
Fulmer Drilling Pad #1; ABR–
20100616.R2; Franklin Township,
Lycoming County, Pa.; Consumptive
Use of Up to 2.0000 mgd; Approval
Date: November 14, 2022.
3. Repsol Oil & Gas USA, LLC; Pad ID:
ABELL (05 112) G; ABR–201209002.R2;
Warren Township, Bradford County,
Pa.; Consumptive Use of Up to 6.0000
mgd; Approval Date: November 14,
2022.
4. Seneca Resources Company, LLC;
Pad ID: Bauer 849 2022; ABR–
202211001; Middlebury Township,
Tioga County, Pa.; Consumptive Use of
Up to 4.0000 mgd; Approval Date:
November 14, 2022.
5. Chesapeake Appalachia, L.L.C.; Pad
ID: Delhagen; ABR–201009066.R2; Rush
Township, Susquehanna County, Pa.;
Consumptive Use of Up to 7.5000 mgd;
Approval Date: November 22, 2022.
6. Chesapeake Appalachia, L.L.C.; Pad
ID: Driscoll; ABR–201009061.R2;
Overton Township, Bradford County,
Pa.; Consumptive Use of Up to 7.5000
mgd; Approval Date: November 22,
2022.
7. Coterra Energy Inc.; Pad ID:
StockholmK P1; ABR–20100663.R2;
Dimock Township, Susquehanna
County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: November
22, 2022.
8. Inflection Energy (PA) LLC; Pad ID:
Fox B Well Site; ABR–201709001.R1;
Shrewsbury Township, Lycoming
County, Pa.; Consumptive Use of Up to
4.0000 mgd; Approval Date: November
22, 2022.
9. Seneca Resources Company, LLC;
Pad ID: Erickson 448; ABR–
201009050.R2; Delmar Township, Tioga
County, Pa.; Consumptive Use of Up to
4.0000 mgd; Approval Date: November
22, 2022.
10. Seneca Resources Company, LLC;
Pad ID: Kalke 819; ABR–201009042.R2;
Chatham Township, Tioga County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: November 22, 2022.
11. Seneca Resources Company, LLC;
Pad ID: Lingle 1102; ABR–
201009049.R2; Deerfield Township,
Tioga County, Pa.; Consumptive Use of
Up to 4.0000 mgd; Approval Date:
November 22, 2022.
12. Seneca Resources Company, LLC;
Pad ID: Owlett 843; ABR–201009058.R2;
Middlebury Township, Tioga County,
Pa.; Consumptive Use of Up to 4.0000
mgd; Approval Date: November 22,
2022.
13. Chesapeake Appalachia, L.L.C.;
Pad ID: Bennett NMPY–38; ABR–
201009069.R2; Tuscarora Township,
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 87, Number 247 (Tuesday, December 27, 2022)]
[Notices]
[Pages 79415-79416]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-28055]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Actions Taken at December 15, 2022 Meeting
AGENCY: Susquehanna River Basin Commission
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: As part of its regular business meeting held on December 15,
2022, in Harrisburg, Pennsylvania, the Commission approved the
applications of certain water resources projects, and took additional
actions, as set forth in the Supplementary Information below.
DATES: December 15, 2022.
ADDRESSES: Susquehanna River Basin Commission, 4423 N Front Street,
Harrisburg, PA 17110-1788.
FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel and
Secretary, telephone: (717) 238-0423, ext. 1312, fax: (717) 238-2436;
email: [email protected]. Regular mail inquiries may be sent to the above
address. See also Commission website at www.srbc.net.
SUPPLEMENTARY INFORMATION: In addition to the actions taken on projects
identified in the summary above these actions were also taken: (1)
adoption of the regulatory program fee schedule for CY2023; (2)
adoption of a resolution recognizing the 50th anniversary of the Clean
Water Act; (3) and approval of contracts, grants and agreements.
Project Applications Approved
1. Project Sponsor and Facility: Blossburg Municipal Authority,
Bloss Township, Tioga County, Pa. Applications for groundwater
withdrawals (30-day averages) of up to 0.144 mgd from Taylor Run Well 1
and 0.144 mgd from Taylor Run Well 3.
2. Project Sponsor and Facility: BlueTriton Brands, Inc. (Valley
View Springs), Hegins Township, Schuylkill County, Pa. Applications for
renewal of surface water withdrawal of up to 0.200 mgd (peak day) and
consumptive use of up to 0.200 mgd (peak day) (Docket No. 19971101).
3. Project Sponsor: Constellation Energy Generation, LLC. Project
Facility: Three Mile Island Generating Station, Londonderry Township,
Dauphin County, Pa. Applications for renewal of groundwater withdrawals
(30-day averages) of up to 0.099 mgd from Well A, 0.099 mgd from Well
B, and 0.099 mgd from Well C (Docket No. 20110610), and Commission-
initiated modification of surface water and consumptive use approvals
based on changes in operating status of the project and revised demand
projections.
4. Project Sponsor: Corning Incorporated. Project Facility:
Corporate Headquarters, City of Corning, Steuben County, N.Y.
Application for renewal of groundwater withdrawal of up to 1.440 mgd
(30-day average) from Well 6A (Docket No. 19981201).
5. Project Sponsor and Facility: Dover Township, York County, Pa.
Applications for groundwater withdrawals (30-day averages) of up to
0.088 mgd from Well 10 (Docket No. 19911104).
[[Page 79416]]
6. Project Sponsor and Facility: Hughesville Borough Authority,
Wolf Township, Lycoming County, Pa. Applications for renewal of
groundwater withdrawals (30-day averages) of up to 0.260 mgd from Well
1, 0.260 mgd from Well 2, and 1.440 mgd from Well 3 (Docket No.
20070604).
7. Project Sponsor: Municipal Authority of the Township of East
Hempfield. Project Facility: Hempfield Water Authority, East Hempfield
Township, Lancaster County, Pa. Applications for renewal of groundwater
withdrawals (30-day averages) of up to 0.353 mgd from Well 6, 0.145 mgd
from Well 7, 1.447 mgd from Well 8, and 1.800 mgd from Well 11, and
Commission-initiated modification to Docket No. 20120906, which
approves withdrawals from Wells 1, 2, 3, 4, and 5 and Spring S-1
(Docket Nos. 19870306, 19890503, 19930101, and 20120906).
8. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC
(Choconut Creek), Choconut Township, Susquehanna County, Pa.
Application for renewal of surface water withdrawal of up to 0.999 mgd
(peak day) (Docket No. 20171206).
9. Project Sponsor: State College Friends Limited Partnership.
Project Facility: Toftrees Golf Resort (Pond 9), Patton Township,
Centre County, Pa. Applications for surface water withdrawal of up to
0.750 mgd (peak day), and renewal with modification to increase
consumptive use (peak day) by an additional 0.480 mgd, for a total
consumptive use of up to 0.750 mgd (Docket No. 20021010).
10. Project Sponsor and Facility: SWN Production Company, LLC
(Lycoming Creek), Lewis Township, Lycoming County, Pa. Application for
renewal of surface water withdrawal of up to 0.500 mgd (peak day)
(Docket No. 20171208).
11. Project Sponsor and Facility: SWN Production Company, LLC
(Lycoming Creek), McIntyre Township, Lycoming County, Pa. Application
for renewal of surface water withdrawal of up to 0.500 mgd (peak day)
(Docket No. 20171209).
12. Project Sponsor: The United States Department of Veterans
Affairs. Project Facility: Indiantown Gap National Cemetery, East
Hanover and Union Townships, Lebanon County, Pa. Application for
consumptive use of up to 0.099 mgd (30-day average).
13. Project Sponsor: Veolia Water Pennsylvania, Inc. Project
Facility: Grantham Operation, Upper Allen Township, Cumberland County,
Pa. Application for renewal of groundwater withdrawal of up to 0.395
mgd (30-day average) from Well 2 (Docket No. 19901104).
Project Scheduled for Action Involving a Diversion
1. Project Sponsor and Facility: BlueTriton Brands, Inc. (Valley
View Springs), Hegins Township, Schuylkill County, Pa. Application for
approval of an out-of-basin diversion of up to 0.200 mgd (peak day).
Project Tabled
1. Project Sponsor and Facility: Dover Township, York County, Pa.
Applications for groundwater withdrawals (30-day averages) of up to
0.360 mgd from Well 8 (Docket No. 19911104).
Authority: Public Law 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806, 807, and 808.
Dated: December 20, 2022.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2022-28055 Filed 12-23-22; 8:45 am]
BILLING CODE 7040-01-P