Town of Carbondale, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 78956-78957 [2022-27974]
Download as PDF
78956
Federal Register / Vol. 87, No. 246 / Friday, December 23, 2022 / Notices
9. How can the industry keep
informed of the latest supply chain
compromises? How do entities currently
respond to these compromises to keep
their systems secure? Are there ways to
improve these responses? What actions
can government take, both formal
regulatory actions and coordination, to
help keep industry informed of supply
chain compromises and to facilitate
effective responses?
10. What key risk factors do entities
need to consider prior to leveraging
third party services and how should
those risk factors be balanced with an
entity’s organizational policy? What
SCRM controls do you have in place to
ensure your systems and products have
a reduced risk of compromise? Please
discuss any challenges that you have
experienced as well as successes.
11. How should government and
industry prioritize and coordinate
federal cross-agency and private sector
collaboration and activities regarding
SCRM?
[FR Doc. 2022–27965 Filed 12–22–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD23–4–000]
Town of Carbondale, Colorado; Notice
of Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On December 15, 2022, the Town of
Carbondale, Colorado, filed a notice of
intent to construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA). The
proposed Town of Carbondale Nettle
Creek Water Distribution Pump Back
Hydro Project would have an installed
capacity of 7.6 kilowatts (kW), and
would be located along a pipeline
within the applicant’s municipal water
supply system near the Town of
Carbondale, Pitkin County, Colorado.
Applicant Contact: Mark O’Meara,
Utility Director, Town of Carbondale,
511 Colorado Avenue, Carbondale, CO
81623, 970–963–3140, momeara@
carbondaleco.net.
FERC Contact: Christopher Chaney,
202–502–6778, christopher.chaney@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The project would
consist of: (1) a 7.6-kW pump as turbine
generating unit to be installed within an
existing vault, (2) intake and discharge
pipes connecting to the existing water
supply pipeline, and (3) appurtenant
facilities. The proposed project would
have an estimated annual generation of
approximately 66,500 kilowatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all the criteria shown in
the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A) ........................................
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 40 megawatts ................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i) .....................................
TKELLEY on DSK125TN23PROD with NOTICE
FPA 30(a)(3)(C)(ii) ....................................
FPA 30(a)(3)(C)(iii) ...................................
Preliminary Determination: The
proposed Town of Carbondale Nettle
Creek Water Distribution Pump Back
Hydro Project will not alter the primary
purpose of the conduit, which is for
municipal water supply. Therefore,
based upon the above criteria,
Commission staff preliminarily
determines that the operation of the
project described above satisfies the
requirements for a qualifying conduit
hydropower facility, which is not
required to be licensed or exempted
from licensing.
Comments and Motions To Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 30 days from the issuance
date of this notice. Deadline for filing
motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
VerDate Sep<11>2014
20:36 Dec 22, 2022
Jkt 259001
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
1 18
PO 00000
CFR 385.2001–2005 (2021).
Frm 00044
Fmt 4703
Sfmt 4703
Y
Y
Y
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may send a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
E:\FR\FM\23DEN1.SGM
23DEN1
Federal Register / Vol. 87, No. 246 / Friday, December 23, 2022 / Notices
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 385.2010.
Locations of Notice of Intent: The
Commission provides all interested
persons an opportunity to view and/or
print the contents of this document via
the internet through the Commission’s
website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (i.e., CD23–4) in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
Copies of the notice of intent can be
obtained directly from the applicant.
For assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
Dated: December 19, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–27974 Filed 12–22–22; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2017–0750; FRL–10275–01–
OCSPP]
Pesticide Registration Review;
Proposed Interim Decisions for Several
Pesticides; Notice of Availability
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
This notice announces the
availability of EPA’s proposed interim
registration review decisions and opens
a 75-day public comment period on the
proposed interim decisions for the
following pesticides: 1,3Propanediamine, N-(3-aminopropyl)-Ndodecyl-(1,3–PAD); DCNA; Etofenprox;
Lavandulyl Senecioate; Norflurazon;
Oregano Oil; Penta-termanone; Plant
Extract 620; and Thiophanate-methyl
and Carbendazim.
DATES: Comments must be received on
or before March 8, 2023.
ADDRESSES: Submit your comments,
identified by the docket identification
(ID) number for the specific pesticide of
interest provided in Table 1 in Unit IV.,
through the Federal eRulemaking Portal
at https://www.regulations.gov. Follow
the online instructions for submitting
TKELLEY on DSK125TN23PROD with NOTICE
SUMMARY:
VerDate Sep<11>2014
20:36 Dec 22, 2022
Jkt 259001
comments. Do not submit electronically
any information you consider to be
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute. Additional
instructions on commenting and visiting
the docket, along with more information
about dockets generally, is available at
https://www.epa.gov/dockets.
FOR FURTHER INFORMATION CONTACT:
For pesticide specific information,
contact: The Chemical Review Manager
for the pesticide of interest identified in
Table 1 in Unit IV.
For general information on the
registration review program, contact:
Melanie Biscoe, Pesticide Re-Evaluation
Division (7508P), Office of Pesticide
Programs, Environmental Protection
Agency, 1200 Pennsylvania Ave. NW,
Washington, DC 20460–0001; telephone
number: 202–566–0701; email address:
biscoe.melanie@epa.gov.
SUPPLEMENTARY INFORMATION:
A. Does this action apply to me?
This action is directed to the public
in general and may be of interest to a
wide range of stakeholders including
environmental, human health, farm
worker, and agricultural advocates; the
chemical industry; pesticide users; and
members of the public interested in the
sale, distribution, or use of pesticides.
Since others also may be interested, the
Agency has not attempted to describe all
the specific entities that may be affected
by this action. If you have any questions
regarding the applicability of this action
to a particular entity, consult the
Chemical Review Manager for the
pesticide of interest identified in Table
1 in Unit IV.
B. What should I consider as I prepare
my comments for EPA?
1. Submitting CBI. Do not submit this
information to EPA through
regulations.gov or email. Clearly mark
the part or all of the information that
you claim to be CBI. For CBI
information on a disk or CD–ROM that
you mail to EPA, mark the outside of the
disk or CD–ROM as CBI and then
identify electronically within the disk or
CD–ROM the specific information that
is claimed as CBI. In addition to one
complete version of the comment that
includes information claimed as CBI, a
copy of the comment that does not
contain the information claimed as CBI
must be submitted for inclusion in the
public docket. Information so marked
will not be disclosed except in
accordance with procedures set forth in
40 CFR part 2.
Frm 00045
Fmt 4703
Sfmt 4703
2. Tips for preparing your comments.
When preparing and submitting your
comments, see the commenting tips at:
https://www.epa.gov/dockets/
commenting-epa-dockets.
3. Environmental justice. EPA seeks to
achieve environmental justice, the fair
treatment and meaningful involvement
of any group, including minority and/or
low-income populations, in the
development, implementation, and
enforcement of environmental laws,
regulations, and policies. To help
address potential environmental justice
issues, the Agency seeks information on
any groups or segments of the
population who, as a result of their
location, cultural practices, or other
factors, may have atypical or
disproportionately high and adverse
human health impacts or environmental
effects from exposure to the pesticides
discussed in this document, compared
to the general population.
II. Background
I. General Information
PO 00000
78957
Registration review is EPA’s periodic
review of pesticide registrations to
ensure that each pesticide continues to
satisfy the statutory standard for
registration, that is, the pesticide can
perform its intended function without
unreasonable adverse effects on human
health or the environment. As part of
the registration review process, the
Agency has completed proposed interim
decisions for all pesticides listed in
Table 1 in Unit IV. Through this
program, EPA is ensuring that each
pesticide’s registration is based on
current scientific and other knowledge,
including its effects on human health
and the environment.
III. Authority
EPA is conducting its registration
review of the chemicals listed in the
Table 1 in Unit IV pursuant to section
3(g) of the Federal Insecticide,
Fungicide, and Rodenticide Act (FIFRA)
and the Procedural Regulations for
Registration Review at 40 CFR part 155,
subpart C. Section 3(g) of FIFRA
provides, among other things, that the
registrations of pesticides are to be
reviewed every 15 years. Under FIFRA,
a pesticide product may be registered or
remain registered only if it meets the
statutory standard for registration given
in FIFRA section 3(c)(5) (7 U.S.C.
136a(c)(5)). When used in accordance
with widespread and commonly
recognized practice, the pesticide
product must perform its intended
function without unreasonable adverse
effects on the environment; that is,
without any unreasonable risk to man or
the environment, or a human dietary
E:\FR\FM\23DEN1.SGM
23DEN1
Agencies
[Federal Register Volume 87, Number 246 (Friday, December 23, 2022)]
[Notices]
[Pages 78956-78957]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-27974]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD23-4-000]
Town of Carbondale, Colorado; Notice of Preliminary Determination
of a Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On December 15, 2022, the Town of Carbondale, Colorado, filed a
notice of intent to construct a qualifying conduit hydropower facility,
pursuant to section 30 of the Federal Power Act (FPA). The proposed
Town of Carbondale Nettle Creek Water Distribution Pump Back Hydro
Project would have an installed capacity of 7.6 kilowatts (kW), and
would be located along a pipeline within the applicant's municipal
water supply system near the Town of Carbondale, Pitkin County,
Colorado.
Applicant Contact: Mark O'Meara, Utility Director, Town of
Carbondale, 511 Colorado Avenue, Carbondale, CO 81623, 970-963-3140,
[email protected].
FERC Contact: Christopher Chaney, 202-502-6778,
[email protected].
Qualifying Conduit Hydropower Facility Description: The project
would consist of: (1) a 7.6-kW pump as turbine generating unit to be
installed within an existing vault, (2) intake and discharge pipes
connecting to the existing water supply pipeline, and (3) appurtenant
facilities. The proposed project would have an estimated annual
generation of approximately 66,500 kilowatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
------------------------------------------------------------------------
FPA 30(a)(3)(A)................ The conduit the Y
facility uses is a
tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial
consumption and not
primarily for the
generation of
electricity.
FPA 30(a)(3)(C)(i)............. The facility is Y
constructed,
operated, or
maintained for the
generation of
electric power and
uses for such
generation only the
hydroelectric
potential of a non-
federally owned
conduit.
FPA 30(a)(3)(C)(ii)............ The facility has an Y
installed capacity
that does not exceed
40 megawatts.
FPA 30(a)(3)(C)(iii)........... On or before August 9, Y
2013, the facility is
not licensed, or
exempted from the
licensing
requirements of Part
I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: The proposed Town of Carbondale Nettle
Creek Water Distribution Pump Back Hydro Project will not alter the
primary purpose of the conduit, which is for municipal water supply.
Therefore, based upon the above criteria, Commission staff
preliminarily determines that the operation of the project described
above satisfies the requirements for a qualifying conduit hydropower
facility, which is not required to be licensed or exempted from
licensing.
Comments and Motions To Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 30
days from the issuance date of this notice. Deadline for filing motions
to intervene is 30 days from the issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2021).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, you may send a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory
[[Page 78957]]
Commission, 12225 Wilkins Avenue, Rockville, MD 20852. A copy of all
other filings in reference to this application must be accompanied by
proof of service on all persons listed in the service list prepared by
the Commission in this proceeding, in accordance with 18 CFR 385.2010.
Locations of Notice of Intent: The Commission provides all
interested persons an opportunity to view and/or print the contents of
this document via the internet through the Commission's website at
https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number
(i.e., CD23-4) in the docket number field to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. Copies of the notice of
intent can be obtained directly from the applicant. For assistance,
call toll-free 1-866-208-3676 or email [email protected]. For
TTY, call (202) 502-8659.
Dated: December 19, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-27974 Filed 12-22-22; 8:45 am]