Daggett Solar Power 2 LLC; Supplemental Notice That Filing Includes Request for Blanket Section 204 Authorization, 78949-78950 [2022-27961]
Download as PDF
Federal Register / Vol. 87, No. 246 / Friday, December 23, 2022 / Notices
the United States of America and the
Government of the Kingdom of Norway
Concerning Peaceful Uses of Nuclear
Energy until Norway and the United
States have agreed it is no longer
useable for any nuclear activity relevant
from the point of view of safeguards and
it is finally disposed at a national
disposal facility for radioactive waste.
Pursuant to the authority in section
131a. of the Atomic Energy Act of 1954,
as delegated, I have determined that this
proposed subsequent arrangement
concerning the alteration in form or
content of the U.S.-obligated nuclear
material will not be inimical to the
common defense and security.
Signing Authority
This document of the Department of
Energy was signed on December 19,
2022, by Corey Hinderstein, Deputy
Administrator for Defense Nuclear
Nonproliferation, pursuant to delegated
authority from the Secretary of Energy.
That document with the original
signature and date is maintained by
DOE. For administrative purposes only,
and in compliance with requirements of
the Office of the Federal Register, the
undersigned DOE Federal Register
Liaison Officer has been authorized to
sign and submit the document in
electronic format for publication, as an
official document of the Department of
Energy. This administrative process in
no way alters the legal effect of this
document upon publication in the
Federal Register.
Signed in Washington, DC, on December
19, 2022.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2022–27899 Filed 12–22–22; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER23–200–000]
TKELLEY on DSK125TN23PROD with NOTICE
Daggett Solar Power 1 LLC;
Supplemental Notice That Filing
Includes Request for Blanket Section
204 Authorization
This supplemental notice in the
above-referenced proceeding of Daggett
Solar Power 1 LLC’s filing includes a
request for blanket authorization, under
18 CFR part 34, of future issuances of
securities and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
VerDate Sep<11>2014
20:36 Dec 22, 2022
Jkt 259001
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is December 27,
2022.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: December 19, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–27962 Filed 12–22–22; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
78949
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER23–203–000]
Daggett Solar Power 2 LLC;
Supplemental Notice That Filing
Includes Request for Blanket Section
204 Authorization
This supplemental notice in the
above-referenced proceeding of Daggett
Solar Power 2 LLC’s filing includes a
request for blanket authorization, under
18 CFR part 34, of future issuances of
securities and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is December 27,
2022.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
E:\FR\FM\23DEN1.SGM
23DEN1
78950
Federal Register / Vol. 87, No. 246 / Friday, December 23, 2022 / Notices
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: December 19, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–27961 Filed 12–22–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–24–000]
TKELLEY on DSK125TN23PROD with NOTICE
Double E Pipeline, LLC; Notice of
Request Under Blanket Authorization
and Establishing Intervention and
Protest Deadline
Take notice that on December 9, 2022,
Double E Pipeline, LLC (Double E), 910
Louisiana Street, Suite 4200, Houston,
Texas 77002–2700, filed in above
referenced docket a prior notice request
pursuant to sections 157.205, and
157.208 of the Commission’s regulations
under the Natural Gas Act (NGA) and
Double E blanket certificate issued in
Docket No. CP19–495–000, for
authorization to construct and operate
its Red Hills Lateral project consisting of
20 miles of 24-inch lateral pipeline
connecting its existing Poker Lake Meter
station to the proposed Red Hill meter
station located in Eddy and Lea
Counties, New Mexico. Double E states
that the construction is necessary to
provide access to additional growing
supplies of natural gas in the Delaware
Basin. Double E estimates the cost of the
project to be approximately $35.8
million, all as more fully set forth in the
application which is on file with the
Commission and open for public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
VerDate Sep<11>2014
20:36 Dec 22, 2022
Jkt 259001
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this request
should be directed to John E. Griffin,
Vice President, Deputy Counsel, Double
E Pipeline, LLC, 910 Louisiana Street,
Suite 4200, Houston, Texas 77002–2700,
by phone at (832) 930–7820, or by email
at John.Griffin@summitmidstream.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on February 17, 2023.
How to file protests, motions to
intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is February
17, 2023. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
3 18 CFR 157.205(e).
2 Persons
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is February 17,
2023. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/how-guides.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before February
17, 2023. The filing of a comment alone
will not serve to make the filer a party
to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–24–000 in your submission. The
4 18
5 18
E:\FR\FM\23DEN1.SGM
CFR 385.214.
CFR 157.10.
23DEN1
Agencies
[Federal Register Volume 87, Number 246 (Friday, December 23, 2022)]
[Notices]
[Pages 78949-78950]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-27961]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER23-203-000]
Daggett Solar Power 2 LLC; Supplemental Notice That Filing
Includes Request for Blanket Section 204 Authorization
This supplemental notice in the above-referenced proceeding of
Daggett Solar Power 2 LLC's filing includes a request for blanket
authorization, under 18 CFR part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is December 27, 2022.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically may mail similar pleadings to
the Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. Hand delivered submissions in docketed
proceedings should be delivered to Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland 20852.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov) using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
[[Page 78950]]
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Dated: December 19, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-27961 Filed 12-22-22; 8:45 am]
BILLING CODE 6717-01-P