Daggett Solar Power 2 LLC; Supplemental Notice That Filing Includes Request for Blanket Section 204 Authorization, 78949-78950 [2022-27961]

Download as PDF Federal Register / Vol. 87, No. 246 / Friday, December 23, 2022 / Notices the United States of America and the Government of the Kingdom of Norway Concerning Peaceful Uses of Nuclear Energy until Norway and the United States have agreed it is no longer useable for any nuclear activity relevant from the point of view of safeguards and it is finally disposed at a national disposal facility for radioactive waste. Pursuant to the authority in section 131a. of the Atomic Energy Act of 1954, as delegated, I have determined that this proposed subsequent arrangement concerning the alteration in form or content of the U.S.-obligated nuclear material will not be inimical to the common defense and security. Signing Authority This document of the Department of Energy was signed on December 19, 2022, by Corey Hinderstein, Deputy Administrator for Defense Nuclear Nonproliferation, pursuant to delegated authority from the Secretary of Energy. That document with the original signature and date is maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register. Signed in Washington, DC, on December 19, 2022. Treena V. Garrett, Federal Register Liaison Officer, U.S. Department of Energy. [FR Doc. 2022–27899 Filed 12–22–22; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER23–200–000] TKELLEY on DSK125TN23PROD with NOTICE Daggett Solar Power 1 LLC; Supplemental Notice That Filing Includes Request for Blanket Section 204 Authorization This supplemental notice in the above-referenced proceeding of Daggett Solar Power 1 LLC’s filing includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, VerDate Sep<11>2014 20:36 Dec 22, 2022 Jkt 259001 in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is December 27, 2022. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Dated: December 19, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–27962 Filed 12–22–22; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 78949 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER23–203–000] Daggett Solar Power 2 LLC; Supplemental Notice That Filing Includes Request for Blanket Section 204 Authorization This supplemental notice in the above-referenced proceeding of Daggett Solar Power 2 LLC’s filing includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is December 27, 2022. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public E:\FR\FM\23DEN1.SGM 23DEN1 78950 Federal Register / Vol. 87, No. 246 / Friday, December 23, 2022 / Notices Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Dated: December 19, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–27961 Filed 12–22–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–24–000] TKELLEY on DSK125TN23PROD with NOTICE Double E Pipeline, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on December 9, 2022, Double E Pipeline, LLC (Double E), 910 Louisiana Street, Suite 4200, Houston, Texas 77002–2700, filed in above referenced docket a prior notice request pursuant to sections 157.205, and 157.208 of the Commission’s regulations under the Natural Gas Act (NGA) and Double E blanket certificate issued in Docket No. CP19–495–000, for authorization to construct and operate its Red Hills Lateral project consisting of 20 miles of 24-inch lateral pipeline connecting its existing Poker Lake Meter station to the proposed Red Hill meter station located in Eddy and Lea Counties, New Mexico. Double E states that the construction is necessary to provide access to additional growing supplies of natural gas in the Delaware Basin. Double E estimates the cost of the project to be approximately $35.8 million, all as more fully set forth in the application which is on file with the Commission and open for public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the VerDate Sep<11>2014 20:36 Dec 22, 2022 Jkt 259001 proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this request should be directed to John E. Griffin, Vice President, Deputy Counsel, Double E Pipeline, LLC, 910 Louisiana Street, Suite 4200, Houston, Texas 77002–2700, by phone at (832) 930–7820, or by email at John.Griffin@summitmidstream.com. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on February 17, 2023. How to file protests, motions to intervene, and comments is explained below. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,3 and must be submitted by the protest deadline, which is February 17, 2023. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to 1 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 3 18 CFR 157.205(e). 2 Persons PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is February 17, 2023. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/how-guides. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before February 17, 2023. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP23–24–000 in your submission. The 4 18 5 18 E:\FR\FM\23DEN1.SGM CFR 385.214. CFR 157.10. 23DEN1

Agencies

[Federal Register Volume 87, Number 246 (Friday, December 23, 2022)]
[Notices]
[Pages 78949-78950]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-27961]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER23-203-000]


Daggett Solar Power 2 LLC; Supplemental Notice That Filing 
Includes Request for Blanket Section 204 Authorization

    This supplemental notice in the above-referenced proceeding of 
Daggett Solar Power 2 LLC's filing includes a request for blanket 
authorization, under 18 CFR part 34, of future issuances of securities 
and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is December 27, 2022.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically may mail similar pleadings to 
the Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. Hand delivered submissions in docketed 
proceedings should be delivered to Health and Human Services, 12225 
Wilkins Avenue, Rockville, Maryland 20852.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov) using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public

[[Page 78950]]

Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.

    Dated: December 19, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-27961 Filed 12-22-22; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.