Shenandoah Hydro Company, The Dam, LLC; Notice of Transfer of Exemption, 78102 [2022-27717]
Download as PDF
78102
Federal Register / Vol. 87, No. 244 / Wednesday, December 21, 2022 / Notices
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: December 15, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–27718 Filed 12–20–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6898–003]
lotter on DSK11XQN23PROD with NOTICES1
Shenandoah Hydro Company, The
Dam, LLC; Notice of Transfer of
Exemption
1. On October 31, 2022, Shenandoah
Hydro Company, exemptee for the 300kilowatt Chapman Dam Hydroelectric
Project No. 6898, filed a letter notifying
the Commission that the project was
transferred from Shenandoah Hydro
Company to The Dam, LLC. The
exemption from licensing was originally
VerDate Sep<11>2014
19:56 Dec 20, 2022
Jkt 259001
issued on June 9, 1983.1 The project is
located on the North Fork of the
Shenandoah River, Shenandoah County,
Virginia. The transfer of an exemption
does not require Commission approval.
The Dam, LLC is now the exemptee of
the Chapman Dam Hydroelectric Project
No. 6898. All correspondence must be
forwarded to Mr. Benjamin C. and Mrs.
Susan F. Freakley, The Dam, LLC, 375
Morning Star Lane, Woodstock, VA
22664.
Dated: December 15, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–27717 Filed 12–20–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Compliance Filing to be effective 4/1/
2022.
Filed Date: 12/15/22.
Accession Number: 20221215–5012.
Comment Date: 5 p.m. ET 12/27/22.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 15, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–27720 Filed 12–20–22; 8:45 am]
BILLING CODE 6717–01–P
Filings Instituting Proceedings
Docket Numbers: RP23–285–000
Applicants: Maritimes & Northeast
Pipeline, L.L.C.
Description: § 4(d) Rate Filing: Name
Change Clean-up Filing to be effective
1/16/2023.
Filed Date: 12/15/22.
Accession Number: 20221215–5014.
Comment Date: 5 p.m. ET 12/27/22.
Docket Numbers: RP23–286–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: AGT
Name Change Cleanup to be effective 1/
16/2023.
Filed Date: 12/15/22.
Accession Number: 20221215–5024.
Comment Date: 5 p.m. ET 12/27/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP21–1187–010.
Applicants: Eastern Gas Transmission
and Storage, Inc.
Description: Compliance filing:
EGTS—December 15, 2022 Rate Case
1 Shenandoah Hydro Company, 23 FERC ¶ 62,032
(1983).
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–10279–01–R2]
Proposed CERCLA Cost Recovery
Settlement for the Jewett White Lead
Company Superfund Site, Located on
Staten Island, Richmond County, New
York
Environmental Protection
Agency.
ACTION: Notice; request for public
comment.
AGENCY:
In accordance with the
Comprehensive Environmental
Response, Compensation, and Liability
Act of 1980, as amended (‘‘CERCLA’’),
notice is hereby given by the U.S.
Environmental Protection Agency
(‘‘EPA’’), Region 2, of a proposed cost
recovery settlement agreement
(‘‘Settlement’’) pursuant to CERCLA
with NL Industries, Inc. (‘‘NL’’), Moran
Towing Corporation and Moran
Shipyard Corporation (jointly referred to
as ‘‘Moran’’), and Perfetto Realty, Co.
Inc. (collectively, the ‘‘Settling Parties’’)
for the Jewett White Lead Company
Superfund Site, located on Staten
Island, Richmond County, New York
(the ‘‘Site’’).
DATES: Comments must be submitted on
or before January 20, 2023.
ADDRESSES: Requests for copies of the
proposed Settlement and the
SUMMARY:
E:\FR\FM\21DEN1.SGM
21DEN1
Agencies
[Federal Register Volume 87, Number 244 (Wednesday, December 21, 2022)]
[Notices]
[Page 78102]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-27717]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6898-003]
Shenandoah Hydro Company, The Dam, LLC; Notice of Transfer of
Exemption
1. On October 31, 2022, Shenandoah Hydro Company, exemptee for the
300-kilowatt Chapman Dam Hydroelectric Project No. 6898, filed a letter
notifying the Commission that the project was transferred from
Shenandoah Hydro Company to The Dam, LLC. The exemption from licensing
was originally issued on June 9, 1983.\1\ The project is located on the
North Fork of the Shenandoah River, Shenandoah County, Virginia. The
transfer of an exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ Shenandoah Hydro Company, 23 FERC ] 62,032 (1983).
---------------------------------------------------------------------------
The Dam, LLC is now the exemptee of the Chapman Dam Hydroelectric
Project No. 6898. All correspondence must be forwarded to Mr. Benjamin
C. and Mrs. Susan F. Freakley, The Dam, LLC, 375 Morning Star Lane,
Woodstock, VA 22664.
Dated: December 15, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-27717 Filed 12-20-22; 8:45 am]
BILLING CODE 6717-01-P