Briar Hydro Associates, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 77824-77825 [2022-27589]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
77824
Federal Register / Vol. 87, No. 243 / Tuesday, December 20, 2022 / Notices
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. All filings must clearly identify
the project name and docket number on
the first page: Penacook Upper Falls
Project (P–6689–018).
m. The application is not ready for
environmental analysis at this time.
n. The Penacook Upper Falls Project
consists of the following existing
facilities: (1) an impoundment with a
surface area of 11.4-acres at an elevation
of 306.0 feet above National Geodetic
Vertical Datum 1929; (2) a 21-foot-high,
187-foot-long timber stoplog dam with a
gated concrete spillway ; (3) a 58-footwide, 15-foot-long forebay; (4) a 12.5foot-wide, 39.3-foot-high trashrack with
3.5-inch clear spacing; (5) a 44-footwide by 81-foot-long, concrete
powerhouse, integral to the dam,
containing one Kaplan turbine
generating unit with a capacity of 3.02
megawatts; (6) a 350-foot-long, 47-footwide tailrace; (7) transmission facilities
consisting of a 4.16/34.5- kilovolt (kV)
transformer and a 50-foot-long, 34.5-kV
transmission line; and (8) other
appurtenances.
The project operates in a run-of-river
mode and had an average annual
generation of 13,825,011 kilowatt-hours
between 2012 and 2021. No changes to
the project are proposed.
o. Copies of the application may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document (P–6689). For assistance,
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)—
February 2023
Request Additional Information (if
necessary)—March 2023
Issue Acceptance Letter—May 2023
Issue Scoping Document 1 for
comments—May 2023
Issue Scoping Document 2 (if
necessary)—August 2023
Issue Notice of Ready for Environmental
Analysis August—2023
VerDate Sep<11>2014
18:41 Dec 19, 2022
Jkt 259001
q. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: December 14, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–27586 Filed 12–19–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: CP23–25–000.
Applicants: Southern Natural Gas
Company, L.L.C.
Description: Southern Natural Gas
Company, L.L.C submits Abbreviated
Application for Authorization to
Abandon Services Under Certificate of
Public Convenience and Necessity
under CP23–25.
Filed Date: 12/13/2022.
Accession Number: 20221213–5057.
Comment Date: 5 p.m. ET 1/3/23.
Docket Numbers: RP23–280–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated PAL Koch Energy Services,
LLC GN0822 to be effective 12/14/2022.
Filed Date: 12/14/22.
Accession Number: 20221214–5030.
Comment Date: 5 p.m. ET 12/27/22.
Docket Numbers: RP23–281–000.
Applicants: Southern Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Georgia Pacific Negotiated Rate to be
effective 12/15/2022.
Filed Date: 12/14/22.
Accession Number: 20221214–5042.
Comment Date: 5 p.m. ET 12/27/22.
Docket Numbers: RP23–282–000.
Applicants: Florida Gas Transmission
Company, LLC.
Description: § 4(d) Rate Filing: New
Service Agreements—Brotman to be
effective 1/1/2023.
Filed Date: 12/14/22.
Accession Number: 20221214–5048.
Comment Date: 5 p.m. ET 12/27/22.
Docket Numbers: RP23–283–000.
Applicants: Florida Gas Transmission
Company, LLC.
Description: § 4(d) Rate Filing: Update
Non-Conforming List—Brotman to be
effective 1/1/2023.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Filed Date: 12/14/22.
Accession Number: 20221214–5049.
Comment Date: 5 p.m. ET 12/27/22.
Docket Numbers: RP23–284–000.
Applicants: Alliance Pipeline L.P.
Description: § 4(d) Rate Filing: Tariff
Notice Address Change Filing to be
effective 1/14/2023.
Filed Date: 12/14/22.
Accession Number: 20221214–5075.
Comment Date: 5 p.m. ET 12/27/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 14, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–27622 Filed 12–19–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3342–025]
Briar Hydro Associates, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New License.
b. Project No.: 3342–025.
c. Date Filed: November 30, 2022.
d. Applicant: Briar Hydro Associates.
e. Name of Project: Penacook Lower
Falls Hydroelectric Project.
f. Location: On the Contoocook River,
in City of Concord, and Town of
Boscawen, Merrimack County, New
E:\FR\FM\20DEN1.SGM
20DEN1
Federal Register / Vol. 87, No. 243 / Tuesday, December 20, 2022 / Notices
Hampshire. No federal lands are located
within the project boundary.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Andrew J.
Locke, Essex Hydro Associates, LLC, 55
Union Street, Boston, MA 02108; (617)
357–0032; email—alocke@
essexhydro.com.
i. FERC Contact: Jeanne Edwards at
(202) 502–6181; or jeanne.edwards@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: January 29, 2023.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. All filings must clearly identify
the project name and docket number on
the first page: Penacook Lower Falls
Project (P–3342–025).
m. The application is not ready for
environmental analysis at this time.
n. The Penacook Lower Falls Project
consists of the following existing
facilities:
(1) an impoundment with a surface
area of 8.4-acres at an elevation of 278.6
feet National Geodetic Vertical Datum
1929; (2) a concrete dam with a 15-footlong, 70-foot-wide forebay, a 106-footlong, gated spillway, a 316-foot-long
auxiliary spillway, and a 140-foot-long,
gated diversion structure; (3) a 23.3-footlong, 46.1-foot-high trash rack with a
3.625-inch clear spacing; (4) a 35-footwide by 97.5-foot-long concrete
powerhouse, integral with the spillway,
containing one Kaplan style turbinegenerator unit with a capacity of 4.6
megawatts; (5) a 700-foot-long, 45-foot
wide tailrace; (6) transmission facilities
consisting of a 4.16/34.5 kilovolt (kV)
transformer and 200-foot-long, 34.5-kV
transmission line; and (7) other
appurtenances.
The project operates in a run-of-river
mode. The project had an average
annual generation of 20,198,820 kWh
kilowatt-hours between 2012 and 2021.
No changes in the project operation are
proposed.
o. Copies of the application may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document (P–3342). For assistance,
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if necessary) ............................................................................................................................
Request Additional Information (if necessary) ...............................................................................................................
Issue Acceptance Letter .................................................................................................................................................
Issue Scoping Document 1 for comments .....................................................................................................................
Issue Scoping Document 2 (if necessary) .....................................................................................................................
Issue Notice of Ready for Environmental Analysis ........................................................................................................
q. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Federal Energy Regulatory
Commission
[Docket No. ER23–618–000]
Dated: December 14, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–27589 Filed 12–19–22; 8:45 am]
BILLING CODE 6717–01–P
lotter on DSK11XQN23PROD with NOTICES1
DEPARTMENT OF ENERGY
Sandy Ridge Wind 2, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Sandy
Ridge Wind 2, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
VerDate Sep<11>2014
18:41 Dec 19, 2022
Jkt 259001
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
77825
February 2023.
March 2023.
May 2023.
May 2023.
August 2023
August 2023.
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is January 3,
2023.
E:\FR\FM\20DEN1.SGM
20DEN1
Agencies
[Federal Register Volume 87, Number 243 (Tuesday, December 20, 2022)]
[Notices]
[Pages 77824-77825]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-27589]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3342-025]
Briar Hydro Associates, LLC; Notice of Application Tendered for
Filing With the Commission and Soliciting Additional Study Requests and
Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New License.
b. Project No.: 3342-025.
c. Date Filed: November 30, 2022.
d. Applicant: Briar Hydro Associates.
e. Name of Project: Penacook Lower Falls Hydroelectric Project.
f. Location: On the Contoocook River, in City of Concord, and Town
of Boscawen, Merrimack County, New
[[Page 77825]]
Hampshire. No federal lands are located within the project boundary.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Andrew J. Locke, Essex Hydro Associates, LLC,
55 Union Street, Boston, MA 02108; (617) 357-0032; email_
[email protected]
i. FERC Contact: Jeanne Edwards at (202) 502-6181; or
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: January 29, 2023.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, you may submit a paper
copy. Submissions sent via the U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent
via any other carrier must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings must clearly identify the
project name and docket number on the first page: Penacook Lower Falls
Project (P-3342-025).
m. The application is not ready for environmental analysis at this
time.
n. The Penacook Lower Falls Project consists of the following
existing facilities:
(1) an impoundment with a surface area of 8.4-acres at an elevation
of 278.6 feet National Geodetic Vertical Datum 1929; (2) a concrete dam
with a 15-foot-long, 70-foot-wide forebay, a 106-foot-long, gated
spillway, a 316-foot-long auxiliary spillway, and a 140-foot-long,
gated diversion structure; (3) a 23.3-foot-long, 46.1-foot-high trash
rack with a 3.625-inch clear spacing; (4) a 35-foot-wide by 97.5-foot-
long concrete powerhouse, integral with the spillway, containing one
Kaplan style turbine-generator unit with a capacity of 4.6 megawatts;
(5) a 700-foot-long, 45-foot wide tailrace; (6) transmission facilities
consisting of a 4.16/34.5 kilovolt (kV) transformer and 200-foot-long,
34.5-kV transmission line; and (7) other appurtenances.
The project operates in a run-of-river mode. The project had an
average annual generation of 20,198,820 kWh kilowatt-hours between 2012
and 2021. No changes in the project operation are proposed.
o. Copies of the application may be viewed on the Commission's
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document (P-3342). For assistance, contact FERC
Online Support at [email protected] or call toll-free, (866)
208-3676 or (202) 502-8659 (TTY).
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made as appropriate.
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
Issue Deficiency Letter (if necessary)..................... February 2023.
Request Additional Information (if necessary).............. March 2023.
Issue Acceptance Letter.................................... May 2023.
Issue Scoping Document 1 for comments...................... May 2023.
Issue Scoping Document 2 (if necessary).................... August 2023
Issue Notice of Ready for Environmental Analysis........... August 2023.
----------------------------------------------------------------------------------------------------------------
q. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: December 14, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-27589 Filed 12-19-22; 8:45 am]
BILLING CODE 6717-01-P