Cube Yadkin Generation, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 77590-77591 [2022-27460]
Download as PDF
77590
Federal Register / Vol. 87, No. 242 / Monday, December 19, 2022 / Notices
Description: § 205(d) Rate Filing: SFA
Amendment to be effective 12/14/2022.
Filed Date: 12/13/22.
Accession Number: 20221213–5123.
Comment Date: 5 p.m. ET 1/3/23.
Docket Numbers: ER23–621–000.
Applicants: Moss Landing Energy
Storage 2, LLC.
Description: § 205(d) Rate Filing: SFA
Amendment to be effective 12/14/2022.
Filed Date: 12/13/22.
Accession Number: 20221213–5128.
Comment Date: 5 p.m. ET 1/3/23.
Docket Numbers: ER23–622–000.
Applicants: Moss Landing Energy
Storage 1, LLC.
Description: § 205(d) Rate Filing: SFA
1,2,3 and Luminant to be effective 12/
14/2022.
Filed Date: 12/13/22.
Accession Number: 20221213–5130.
Comment Date: 5 p.m. ET 1/3/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 13, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–27449 Filed 12–16–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
tkelley on DSK125TN23PROD with NOTICE
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP23–278–000.
Applicants: ANR Pipeline Company.
Description: § 4(d) Rate Filing: ANR—
Koch 138487 Negotiated Rate Agmt to
be effective 12/10/2022.
VerDate Sep<11>2014
19:38 Dec 16, 2022
Jkt 259001
Filed Date: 12/12/22.
Accession Number: 20221212–5112.
Comment Date: 5 p.m. ET 12/27/22.
Docket Numbers: RP23–279–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: REX
2022–12–12 Negotiated Rate Agreement
to be effective 12/12/2022.
Filed Date: 12/12/22.
Accession Number: 20221212–5152.
Comment Date: 5 p.m. ET 12/27/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP23–180–001.
Applicants: Eastern Shore Natural Gas
Company.
Description: Compliance filing: ESNG
Operational Purchase & Sales
Compliance to be effective 12/10/2022.
Filed Date: 12/13/22.
Accession Number: 20221213–5072.
Comment Date: 5 p.m. ET 12/27/22.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 13, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–27450 Filed 12–16–22; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2197–143]
Cube Yadkin Generation, LLC; Notice
of Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 2197–143.
c. Date Filed: November 17, 2022.
d. Applicant: Cube Yadkin
Generation, LLC.
e. Name of Project: Yadkin
Hydroelectric Project.
f. Location: Tuckertown Development
in Montgomery County, North Carolina.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Joyce Foster,
(804) 338–5110, joyce.foster@
eaglecreekre.com.
i. FERC Contact: Mark Carter, (678)
245–3083, mark.carter@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
January 12, 2023.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–2197–143. Comments
emailed to Commission staff are not
considered part of the Commission
record.
k. Description of Request: Cube
Yadkin Generation, LLC proposes to
E:\FR\FM\19DEN1.SGM
19DEN1
tkelley on DSK125TN23PROD with NOTICE
Federal Register / Vol. 87, No. 242 / Monday, December 19, 2022 / Notices
install a solar photovoltaic system on
project lands near the Tuckertown Dam.
The solar facility would consist of two
solar arrays occupying 0.74 acre of
project lands total, would result in 2.22
acres of land disturbance to construct
the facilities, and would provide 500
kilowatts of power to the electric grid.
The licensee’s proposal is associated
with a grant from the U.S. Department
of Energy to study the control and
coordination of multiple generation
sources (i.e., in this case, solar energy
and hydroelectric energy) connecting to
the electric grid.
l. Locations of the Application: In
addition to publishing the full text of
this document in the Federal Register,
the Commission provides all interested
persons an opportunity to view and/or
print the contents of this document via
the internet through the Commission’s
Home Page (https://www.ferc.gov) using
the ‘‘elibrary’’ link. Enter the docket
number excluding the last three digits in
the document field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3673 or TYY, (202)
502–8659. Agencies may obtain copies
of the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
VerDate Sep<11>2014
19:38 Dec 16, 2022
Jkt 259001
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: December 13, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–27460 Filed 12–16–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–22–000]
Great Lakes Gas Transmission Limited
Partnership; Notice of Application and
Establishing Intervention Deadline
Take notice that on December 8, 2022,
Great Lakes Gas Transmission Limited
Partnership (Great Lakes), 700 Louisiana
Street, Suite 1300, Houston, Texas
77002–2700, filed in the above
referenced docket, an application under
section 7(b) of the Natural Gas Act
(NGA), and Part 157 of the
Commission’s regulations requesting
authorization to temporarily abandon a
portion of its certificated horsepower at
its Compressor Station No. 1 located
near St. Vincent, Minnesota, and to
temporarily abandon the associated
system design capacity from Great
Lakes’ point of receipt at Emerson in
Kittson County, Minnesota, to its point
of delivery at Fortune Lake in Iron
County, Michigan.
More specifically, Great Lakes
requests to temporarily abandon, for up
to 36 months, the certificated
horsepower of Station No. 1 from 32,330
HP to 15,830 HP and reduce the
associated design capacity from 2,049
MDth/d to 1,905 MDth/d in the summer
(144 MDth/d) and from 2,132 MDth/d to
1,947 MDth/d in the winter (185 MDth/
d) from Great Lakes’ point of receipt at
Emerson in Kittson County, Minnesota,
to its point of delivery at Fortune Lake
in Iron County, Michigan, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection.
In its application, Great Lakes states
that the temporary abandonments will
have no impact on service to Great
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
77591
Lakes’ shippers because the capacity
being abandoned is unsubscribed and
the HP being abandoned has not been
used by Great Lakes for deliverability
since 2018–2019. Great Lakes also states
that these temporary abandonments will
allow Great Lakes time for an analysis
of long-term needs for this capacity
versus the cost of repair or replacement
of certain compressor units on its
system.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this prior
notice request should be directed to
David A. Alonzo, Manager, Project
Authorizations, Great Lakes Gas
Transmission Limited Partnership, 700
Louisiana Street, Suite 1300, Houston,
Texas 77002–2700, at (832) 320–5477,
or by email to david_alonzo@
tcenergy.com.
Pursuant to Section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
1 18
E:\FR\FM\19DEN1.SGM
CFR (Code of Federal Regulations) 157.9.
19DEN1
Agencies
[Federal Register Volume 87, Number 242 (Monday, December 19, 2022)]
[Notices]
[Pages 77590-77591]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-27460]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2197-143]
Cube Yadkin Generation, LLC; Notice of Application Accepted for
Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-Project Use of Project Lands and Waters.
b. Project No: 2197-143.
c. Date Filed: November 17, 2022.
d. Applicant: Cube Yadkin Generation, LLC.
e. Name of Project: Yadkin Hydroelectric Project.
f. Location: Tuckertown Development in Montgomery County, North
Carolina.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Joyce Foster, (804) 338-5110,
[email protected].
i. FERC Contact: Mark Carter, (678) 245-3083, [email protected].
j. Deadline for filing comments, motions to intervene, and
protests: January 12, 2023.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include docket number P-2197-143. Comments emailed to Commission staff
are not considered part of the Commission record.
k. Description of Request: Cube Yadkin Generation, LLC proposes to
[[Page 77591]]
install a solar photovoltaic system on project lands near the
Tuckertown Dam. The solar facility would consist of two solar arrays
occupying 0.74 acre of project lands total, would result in 2.22 acres
of land disturbance to construct the facilities, and would provide 500
kilowatts of power to the electric grid. The licensee's proposal is
associated with a grant from the U.S. Department of Energy to study the
control and coordination of multiple generation sources (i.e., in this
case, solar energy and hydroelectric energy) connecting to the electric
grid.
l. Locations of the Application: In addition to publishing the full
text of this document in the Federal Register, the Commission provides
all interested persons an opportunity to view and/or print the contents
of this document via the internet through the Commission's Home Page
(https://www.ferc.gov) using the ``elibrary'' link. Enter the docket
number excluding the last three digits in the document field to access
the document. At this time, the Commission has suspended access to the
Commission's Public Reference Room, due to the proclamation declaring a
National Emergency concerning the Novel Coronavirus Disease (COVID-19),
issued by the President on March 13, 2020. For assistance, contact FERC
at [email protected] or call toll-free, (886) 208-3673 or TYY,
(202) 502-8659. Agencies may obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: December 13, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-27460 Filed 12-16-22; 8:45 am]
BILLING CODE 6717-01-P