Cube Yadkin Generation, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 77590-77591 [2022-27460]

Download as PDF 77590 Federal Register / Vol. 87, No. 242 / Monday, December 19, 2022 / Notices Description: § 205(d) Rate Filing: SFA Amendment to be effective 12/14/2022. Filed Date: 12/13/22. Accession Number: 20221213–5123. Comment Date: 5 p.m. ET 1/3/23. Docket Numbers: ER23–621–000. Applicants: Moss Landing Energy Storage 2, LLC. Description: § 205(d) Rate Filing: SFA Amendment to be effective 12/14/2022. Filed Date: 12/13/22. Accession Number: 20221213–5128. Comment Date: 5 p.m. ET 1/3/23. Docket Numbers: ER23–622–000. Applicants: Moss Landing Energy Storage 1, LLC. Description: § 205(d) Rate Filing: SFA 1,2,3 and Luminant to be effective 12/ 14/2022. Filed Date: 12/13/22. Accession Number: 20221213–5130. Comment Date: 5 p.m. ET 1/3/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 13, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–27449 Filed 12–16–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings tkelley on DSK125TN23PROD with NOTICE Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP23–278–000. Applicants: ANR Pipeline Company. Description: § 4(d) Rate Filing: ANR— Koch 138487 Negotiated Rate Agmt to be effective 12/10/2022. VerDate Sep<11>2014 19:38 Dec 16, 2022 Jkt 259001 Filed Date: 12/12/22. Accession Number: 20221212–5112. Comment Date: 5 p.m. ET 12/27/22. Docket Numbers: RP23–279–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: REX 2022–12–12 Negotiated Rate Agreement to be effective 12/12/2022. Filed Date: 12/12/22. Accession Number: 20221212–5152. Comment Date: 5 p.m. ET 12/27/22. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings Docket Numbers: RP23–180–001. Applicants: Eastern Shore Natural Gas Company. Description: Compliance filing: ESNG Operational Purchase & Sales Compliance to be effective 12/10/2022. Filed Date: 12/13/22. Accession Number: 20221213–5072. Comment Date: 5 p.m. ET 12/27/22. Any person desiring to protest in any the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 13, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–27450 Filed 12–16–22; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2197–143] Cube Yadkin Generation, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Project Use of Project Lands and Waters. b. Project No: 2197–143. c. Date Filed: November 17, 2022. d. Applicant: Cube Yadkin Generation, LLC. e. Name of Project: Yadkin Hydroelectric Project. f. Location: Tuckertown Development in Montgomery County, North Carolina. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Joyce Foster, (804) 338–5110, joyce.foster@ eaglecreekre.com. i. FERC Contact: Mark Carter, (678) 245–3083, mark.carter@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: January 12, 2023. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–2197–143. Comments emailed to Commission staff are not considered part of the Commission record. k. Description of Request: Cube Yadkin Generation, LLC proposes to E:\FR\FM\19DEN1.SGM 19DEN1 tkelley on DSK125TN23PROD with NOTICE Federal Register / Vol. 87, No. 242 / Monday, December 19, 2022 / Notices install a solar photovoltaic system on project lands near the Tuckertown Dam. The solar facility would consist of two solar arrays occupying 0.74 acre of project lands total, would result in 2.22 acres of land disturbance to construct the facilities, and would provide 500 kilowatts of power to the electric grid. The licensee’s proposal is associated with a grant from the U.S. Department of Energy to study the control and coordination of multiple generation sources (i.e., in this case, solar energy and hydroelectric energy) connecting to the electric grid. l. Locations of the Application: In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https://www.ferc.gov) using the ‘‘elibrary’’ link. Enter the docket number excluding the last three digits in the document field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3673 or TYY, (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, VerDate Sep<11>2014 19:38 Dec 16, 2022 Jkt 259001 and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: December 13, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–27460 Filed 12–16–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–22–000] Great Lakes Gas Transmission Limited Partnership; Notice of Application and Establishing Intervention Deadline Take notice that on December 8, 2022, Great Lakes Gas Transmission Limited Partnership (Great Lakes), 700 Louisiana Street, Suite 1300, Houston, Texas 77002–2700, filed in the above referenced docket, an application under section 7(b) of the Natural Gas Act (NGA), and Part 157 of the Commission’s regulations requesting authorization to temporarily abandon a portion of its certificated horsepower at its Compressor Station No. 1 located near St. Vincent, Minnesota, and to temporarily abandon the associated system design capacity from Great Lakes’ point of receipt at Emerson in Kittson County, Minnesota, to its point of delivery at Fortune Lake in Iron County, Michigan. More specifically, Great Lakes requests to temporarily abandon, for up to 36 months, the certificated horsepower of Station No. 1 from 32,330 HP to 15,830 HP and reduce the associated design capacity from 2,049 MDth/d to 1,905 MDth/d in the summer (144 MDth/d) and from 2,132 MDth/d to 1,947 MDth/d in the winter (185 MDth/ d) from Great Lakes’ point of receipt at Emerson in Kittson County, Minnesota, to its point of delivery at Fortune Lake in Iron County, Michigan, all as more fully set forth in the application which is on file with the Commission and open to public inspection. In its application, Great Lakes states that the temporary abandonments will have no impact on service to Great PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 77591 Lakes’ shippers because the capacity being abandoned is unsubscribed and the HP being abandoned has not been used by Great Lakes for deliverability since 2018–2019. Great Lakes also states that these temporary abandonments will allow Great Lakes time for an analysis of long-term needs for this capacity versus the cost of repair or replacement of certain compressor units on its system. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TTY, (202) 502–8659. Any questions regarding this prior notice request should be directed to David A. Alonzo, Manager, Project Authorizations, Great Lakes Gas Transmission Limited Partnership, 700 Louisiana Street, Suite 1300, Houston, Texas 77002–2700, at (832) 320–5477, or by email to david_alonzo@ tcenergy.com. Pursuant to Section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of 1 18 E:\FR\FM\19DEN1.SGM CFR (Code of Federal Regulations) 157.9. 19DEN1

Agencies

[Federal Register Volume 87, Number 242 (Monday, December 19, 2022)]
[Notices]
[Pages 77590-77591]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-27460]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2197-143]


Cube Yadkin Generation, LLC; Notice of Application Accepted for 
Filing and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Non-Project Use of Project Lands and Waters.
    b. Project No: 2197-143.
    c. Date Filed: November 17, 2022.
    d. Applicant: Cube Yadkin Generation, LLC.
    e. Name of Project: Yadkin Hydroelectric Project.
    f. Location: Tuckertown Development in Montgomery County, North 
Carolina.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Joyce Foster, (804) 338-5110, 
[email protected].
    i. FERC Contact: Mark Carter, (678) 245-3083, [email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: January 12, 2023.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may 
submit a paper copy. Submissions sent via the U.S. Postal Service must 
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852. The first page of any filing should 
include docket number P-2197-143. Comments emailed to Commission staff 
are not considered part of the Commission record.
    k. Description of Request: Cube Yadkin Generation, LLC proposes to

[[Page 77591]]

install a solar photovoltaic system on project lands near the 
Tuckertown Dam. The solar facility would consist of two solar arrays 
occupying 0.74 acre of project lands total, would result in 2.22 acres 
of land disturbance to construct the facilities, and would provide 500 
kilowatts of power to the electric grid. The licensee's proposal is 
associated with a grant from the U.S. Department of Energy to study the 
control and coordination of multiple generation sources (i.e., in this 
case, solar energy and hydroelectric energy) connecting to the electric 
grid.
    l. Locations of the Application: In addition to publishing the full 
text of this document in the Federal Register, the Commission provides 
all interested persons an opportunity to view and/or print the contents 
of this document via the internet through the Commission's Home Page 
(https://www.ferc.gov) using the ``elibrary'' link. Enter the docket 
number excluding the last three digits in the document field to access 
the document. At this time, the Commission has suspended access to the 
Commission's Public Reference Room, due to the proclamation declaring a 
National Emergency concerning the Novel Coronavirus Disease (COVID-19), 
issued by the President on March 13, 2020. For assistance, contact FERC 
at [email protected] or call toll-free, (886) 208-3673 or TYY, 
(202) 502-8659. Agencies may obtain copies of the application directly 
from the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: December 13, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-27460 Filed 12-16-22; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.