Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 77102-77103 [2022-27311]

Download as PDF 77102 Federal Register / Vol. 87, No. 241 / Friday, December 16, 2022 / Notices lotter on DSK11XQN23PROD with NOTICES1 FERC No. 110 to be effective 11/18/ 2022. Filed Date: 12/12/22. Accession Number: 20221212–5069. Comment Date: 5 p.m. ET 1/2/23. Docket Numbers: ER23–604–000. Applicants: Basin Electric Power Cooperative. Description: Tariff Amendment: Basin Electric Notice of Cancellation of Service Agreement No. 23 to be effective 2/11/2023. Filed Date: 12/12/22. Accession Number: 20221212–5071. Comment Date: 5 p.m. ET 1/2/23. Docket Numbers: ER23–605–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, SA No. 6715; Queue No. AE2–111 to be effective 11/11/2022. Filed Date: 12/12/22. Accession Number: 20221212–5077. Comment Date: 5 p.m. ET 1/2/23. Docket Numbers: ER23–607–000 Applicants: K2SO, LLC Description: Baseline eTariff Filing: Baseline new to be effective 12/13/2022. Filed Date: 12/12/22. Accession Number: 20221212–5081. Comment Date: 5 p.m. ET 1/2/23. Docket Numbers: ER23–608–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Administrative Filing for Collation Correction to be effective 12/12/2022. Filed Date: 12/12/22. Accession Number: 20221212–5098. Comment Date: 5 p.m. ET 1/2/23. Docket Numbers: ER23–609–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2022–12–12 Tariff Clarifications to be effective 2/11/2023. Filed Date: 12/12/22. Accession Number: 20221212–5106. Comment Date: 5 p.m. ET 1/2/23. Docket Numbers: ER23–610–000 Applicants: Northern Indiana Public Service Company LLC Description: § 205(d) Rate Filing: East Winamac CIAC Agreement to be effective 1/1/2023. Filed Date: 12/12/22. Accession Number: 20221212–5128. Comment Date: Take notice that the Commission received the following electric securities filings: Docket Numbers: ES23–17–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Application Under Section 204 of the Federal Power Act for Authorization to Issue Securities of VerDate Sep<11>2014 20:05 Dec 15, 2022 Jkt 259001 Midcontinent Independent System Operator, Inc. Filed Date: 12/12/22. Accession Number: 20221212–5107. Comment Date: 5 p.m. ET 1/2/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 12, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–27338 Filed 12–15–22; 8:45 am] BILLING CODE 6717–01–P Public Participation DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–21–000] Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on December 1, 2022, Columbia Gas Transmission, LLC (Columbia), 700 Louisiana Street, Suite 1300, Houston, Texas 77002–2700, filed in above referenced docket a prior notice request pursuant to sections 157.205, 157.208, and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA) and Columbia’s blanket certificate issued in Docket No. CP83–76–000, for authorization to replace a total of 2.7 miles of its existing 18-inch-diameter pipeline Line D420 in three separate segments located in Lucas, Wood, and Ottawa Counties, Ohio. Columbia states that the replacement is necessary to comply with the Pipeline and Hazardous Materials Safety Administration requirements under 49 CFR part 192.611. Columbia estimates the cost of the project to be approximately $17.9 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 million, all as more fully set forth in the application which is on file with the Commission and open for public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this request should be directed to David A. Alonzo, Manager, Project Authorizations, Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas, 77002–2700, by phone at (832) 320–5477, or by email at david_alonzo@ tcenergy.com. There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on February 10, 2023. How to file protests, motions to intervene, and comments is explained below. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is 1 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 2 Persons E:\FR\FM\16DEN1.SGM 16DEN1 Federal Register / Vol. 87, No. 241 / Friday, December 16, 2022 / Notices filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,3 and must be submitted by the protest deadline, which is February 10, 2023. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. lotter on DSK11XQN23PROD with NOTICES1 Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is February 10, 2023. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/how-guides. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. 3 18 CFR 157.205(e). 4 18 CFR 385.214. 5 18 CFR 157.10. VerDate Sep<11>2014 20:05 Dec 15, 2022 Jkt 259001 Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before February 10, 2023. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP23–21–000 in your submission. The Commission encourages electronic filing of submissions. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing.’’ The Commission’s eFiling staff are available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. (2) You can file a paper copy of your submission. Your submission must reference the Project docket number CP23–21–000. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 To send via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852 Protests and motions to intervene must be served on the applicant either by mail to David A. Alonzo, Manager, Project Authorizations, 700 Louisiana Street, Suite 1300, Houston, Texas, 77002–2700 or by email (with a link to the document) at: david_alonzo@ tcenergy.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. PO 00000 Frm 00047 Fmt 4703 Sfmt 9990 77103 Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to https://www.ferc.gov/ferconline/overview. Dated: December 12, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–27311 Filed 12–15–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14994–000] Pumped Hydro Storage LLC; Notice of Surrender of Preliminary Permit Take notice that Pumped Hydro Storage LLC, permittee for the proposed Little Colorado River Pumped Storage Project, has requested that its preliminary permit be terminated. The permit was issued on May 21, 2020, and would have expired on April 30, 2023.1 The project would have been located on the Little Colorado River in Coconino County, Arizona. The preliminary permit for Project No. 14994 will remain in effect until the close of business, January 11, 2023. But, if the Commission is closed on this day, then the permit remains in effect until the close of business on the next day in which the Commission is open.2 New applications for this site may not be submitted until after the permit surrender is effective. Dated: December 12, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–27313 Filed 12–15–22; 8:45 am] BILLING CODE 6717–01–P 1 171 2 18 E:\FR\FM\16DEN1.SGM FERC ¶ 61,138 (2020). CFR 385.2007(a)(2) (2021). 16DEN1

Agencies

[Federal Register Volume 87, Number 241 (Friday, December 16, 2022)]
[Notices]
[Pages 77102-77103]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-27311]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-21-000]


Columbia Gas Transmission, LLC; Notice of Request Under Blanket 
Authorization and Establishing Intervention and Protest Deadline

    Take notice that on December 1, 2022, Columbia Gas Transmission, 
LLC (Columbia), 700 Louisiana Street, Suite 1300, Houston, Texas 77002-
2700, filed in above referenced docket a prior notice request pursuant 
to sections 157.205, 157.208, and 157.216 of the Commission's 
regulations under the Natural Gas Act (NGA) and Columbia's blanket 
certificate issued in Docket No. CP83-76-000, for authorization to 
replace a total of 2.7 miles of its existing 18-inch-diameter pipeline 
Line D420 in three separate segments located in Lucas, Wood, and Ottawa 
Counties, Ohio. Columbia states that the replacement is necessary to 
comply with the Pipeline and Hazardous Materials Safety Administration 
requirements under 49 CFR part 192.611. Columbia estimates the cost of 
the project to be approximately $17.9 million, all as more fully set 
forth in the application which is on file with the Commission and open 
for public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions concerning this request should be directed to David 
A. Alonzo, Manager, Project Authorizations, Columbia Gas Transmission, 
LLC, 700 Louisiana Street, Suite 1300, Houston, Texas, 77002-2700, by 
phone at (832) 320-5477, or by email at [email protected].

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on February 10, 2023. 
How to file protests, motions to intervene, and comments is explained 
below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\1\ any person \2\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is

[[Page 77103]]

filed and not withdrawn within 30 days after the time allowed for 
filing a protest, the instant request for authorization will be 
considered by the Commission.
---------------------------------------------------------------------------

    \1\ 18 CFR 157.205.
    \2\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\3\ and must be submitted by 
the protest deadline, which is February 10, 2023. A protest may also 
serve as a motion to intervene so long as the protestor states it also 
seeks to be an intervenor.
---------------------------------------------------------------------------

    \3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \4\ and the regulations under the NGA \5\ by the 
intervention deadline for the project, which is February 10, 2023. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/how-guides.
---------------------------------------------------------------------------

    \4\ 18 CFR 385.214.
    \5\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before February 10, 2023. The filing of a comment alone will not 
serve to make the filer a party to the proceeding. To become a party, 
you must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP23-21-000 in your submission. The Commission encourages electronic 
filing of submissions.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing.''
    The Commission's eFiling staff are available to assist you at (202) 
502-8258 or [email protected]
    (2) You can file a paper copy of your submission. Your submission 
must reference the Project docket number CP23-21-000.

To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426
To send via any other courier, use the following address: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852

    Protests and motions to intervene must be served on the applicant 
either by mail to David A. Alonzo, Manager, Project Authorizations, 700 
Louisiana Street, Suite 1300, Houston, Texas, 77002-2700 or by email 
(with a link to the document) at: [email protected]. Any 
subsequent submissions by an intervenor must be served on the applicant 
and all other parties to the proceeding. Contact information for 
parties can be downloaded from the service list at the eService link on 
FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to https://www.ferc.gov/ferc-online/overview.

    Dated: December 12, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-27311 Filed 12-15-22; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.