Notice of Effectiveness of Exempt Wholesale Generator and Foreign Utility Company Status, 75619 [2022-26843]
Download as PDF
75619
Federal Register / Vol. 87, No. 236 / Friday, December 9, 2022 / Notices
components to refurbish and upgrade,
replace the existing generators, replace
control panels and instrumentation in
the control room, balance plant
electrical and mechanical systems,
upgrade the cooling system, and replace
the spillway gates and trash racks. The
project is located in the Savannah River
basin on the Tallulah, Chattooga, and
Tugalo rivers, in Rabun, Habersham,
and Stephens counties, Georgia, and
Oconee County, South Carolina. The
project does not occupy federal lands.
The EA contains Commission staff’s
analysis of the potential environmental
effects of the proposed amendment and
concludes that, it would not constitute
a major federal action that would
significantly affect the quality of the
human environment.
The Commission provides all
interested persons with an opportunity
to view and/or print the EA via the
internet through the Commission’s
Home Page (https://www.ferc.gov) using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://ferconline.ferc.gov/
eSubscription.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice. The
Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://ferconline.ferc.gov/eFiling.
aspx. Commenters can submit brief
comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
ferconline.ferc.gov/QuickComment.
aspx. You must include your name and
contact information at the end of your
comments. For assistance, please
contact FERC Online Support. In lieu of
electronic filings, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–2354–
152.
For further information, contact
Aneela Mousam at (202) 502–8357 or
aneela.mousam@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–26841 Filed 12–8–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator and Foreign
Utility Company Status
Docket Nos.
Eastover Solar LLC ..........................................................................................................................................................................
PGR 2021 Lessee 17, LLC ..............................................................................................................................................................
Yellow Pine Solar, LLC .....................................................................................................................................................................
Mesquite Solar 4, LLC ......................................................................................................................................................................
Mesquite Solar 5, LLC ......................................................................................................................................................................
Fall River Solar, LLC ........................................................................................................................................................................
DLS—Jean Duluth Project Co, LLC .................................................................................................................................................
DLS—Laskin Project Co, LLC ..........................................................................................................................................................
DLS—Sylvan Project Co, LLC ..........................................................................................................................................................
GulfStar Power, LLC .........................................................................................................................................................................
Yellowbud Solar, LLC .......................................................................................................................................................................
Jicarilla Solar 1 LLC .........................................................................................................................................................................
Jicarilla Storage 1 LLC .....................................................................................................................................................................
Colice Hall Solar, LLC ......................................................................................................................................................................
I Squared Capital ..............................................................................................................................................................................
Take notice that during the month of
November 2022, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a) (2021).
Dated: December 1, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–26843 Filed 12–8–22; 8:45 am]
lotter on DSK11XQN23PROD with NOTICES1
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:50 Dec 08, 2022
Jkt 259001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–2698–000.
Applicants: Portland General Electric
Company.
Description: Puget Sound Energy, Inc.
submits Average System Cost Rate
Filing for Sales of Electric Power to the
Bonneville Power Administration, FY
2024–2025.
Filed Date: 12/1/22.
Accession Number: 20221201–5315.
Comment Date: 5 p.m. ET 12/22/22.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
EG22–215–000
EG22–216–000
EG22–217–000
EG22–218–000
EG22–219–000
EG22–220–000
EG22–221–000
EG22–222–000
EG22–223–000
EG22–224–000
EG22–225–000
EG22–226–000
EG22–227–000
EG22–228–000
FC22–3–000
Docket Numbers: ER22–2344–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
Deficiency Response—Storage Facilities
as Transmission Only Assets to be
effective 12/31/9998.
Filed Date: 12/2/22.
Accession Number: 20221202–5142.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23–557–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to OATT & OA on Emission
Adders and Calculation of Cost-Based
Offers to be effective 2/1/2023.
Filed Date: 12/2/22.
Accession Number: 20221202–5123.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23–558–000.
E:\FR\FM\09DEN1.SGM
09DEN1
Agencies
[Federal Register Volume 87, Number 236 (Friday, December 9, 2022)]
[Notices]
[Page 75619]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-26843]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator and Foreign
Utility Company Status
------------------------------------------------------------------------
Docket Nos.
------------------------------------------------------------------------
Eastover Solar LLC........................... EG22-215-000
PGR 2021 Lessee 17, LLC...................... EG22-216-000
Yellow Pine Solar, LLC....................... EG22-217-000
Mesquite Solar 4, LLC........................ EG22-218-000
Mesquite Solar 5, LLC........................ EG22-219-000
Fall River Solar, LLC........................ EG22-220-000
DLS--Jean Duluth Project Co, LLC............. EG22-221-000
DLS--Laskin Project Co, LLC.................. EG22-222-000
DLS--Sylvan Project Co, LLC.................. EG22-223-000
GulfStar Power, LLC.......................... EG22-224-000
Yellowbud Solar, LLC......................... EG22-225-000
Jicarilla Solar 1 LLC........................ EG22-226-000
Jicarilla Storage 1 LLC...................... EG22-227-000
Colice Hall Solar, LLC....................... EG22-228-000
I Squared Capital............................ FC22-3-000
------------------------------------------------------------------------
Take notice that during the month of November 2022, the status of
the above-captioned entities as Exempt Wholesale Generators or Foreign
Utility Companies became effective by operation of the Commission's
regulations. 18 CFR 366.7(a) (2021).
Dated: December 1, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-26843 Filed 12-8-22; 8:45 am]
BILLING CODE 6717-01-P