Georgia Power Company; Notice of Availability of Environmental Assessment, 75618-75619 [2022-26841]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 75618 Federal Register / Vol. 87, No. 236 / Friday, December 9, 2022 / Notices turbine-generator units; and (e) an approximately 10-foot-long east abutment; (2) an existing impoundment with a surface area of 35 acres at an elevation of 74.0 feet national geodetic vertical datum of 1929; (3) a new intake structure with a 70- to 100-foot-long angled trashrack with 0.75-inch clear bar spacing; (4) two new 10-foot-long, 10-foot-high steel headgates; (5) a new 40-foot-long, 60-foot-wide tailrace; (6) a new 850-foot-long, 13.8-kilovolt transmission line connecting the turbine-generator units to the regional grid; and (7) appurtenant facilities. The estimated annual generation of the Slater Hydroelectric Project would be 3,500 megawatt-hours. Applicant Contact: Mr. William Fay, White Rapids, LLC, 4145 Church Street, P.O. Box 193, Palmer, Massachusetts 01079; phone: (413) 362–5410; email: fayengineeringservices@gmail.com. FERC Contact: Erin Kimsey; phone: (202) 502–8621; email: Erin.Kimsey@ ferc.gov. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/ QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P– 15282–000. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to VerDate Sep<11>2014 17:50 Dec 08, 2022 Jkt 259001 view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: December 5, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–26774 Filed 12–8–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13–042] Green Island Power Authority; Albany Engineering Corporation; Notice of Application for Partial Transfer of License and Soliciting Comments, Motions To Intervene, and Protests On October 21, 2022, Green Island Power Authority (transferor) and Albany Engineering Corporation (transferee) colicensees for the Green Island Hydroelectric Project No. 13, filed jointly an application for a partial transfer of license. The project is located at the U.S. Army Corps of Engineers (Corps) Green Island-Troy Lock and Dam on the Hudson River, in Albany County, New York. The project occupies federal land under the jurisdiction of the Corps.1 The applicants seek Commission approval to partially transfer the license for the Green Island Hydroelectric Project from the Green Island Power Authority and Albany Engineering Power Corporation as co-licensees to Albany Engineering Corporation as the sole licensee. Applicants Contact: For the transferor: Ms. Kristin Swinton, Green Island Power Authority, 69 Hudson Avenue, Green Island, NY 12183, Phone: (518) 271–9397, Email: kristin@ greenislandpowerauthority.com. For the transferee: Mr. James A. Besha, P.E., and Ms. Wendy Jo Carey, P.E., Albany Engineering Corporation, 5 Washington Square, Albany, NY 12205, Phone: (518) 456–7712, Emails: jim@ albanyengineering.com wendy@ albanyengineering.com. FERC Contact: Anumzziatta Purchiaroni, Phone: (202) 502–6191, Email: Anumzziatta.purchiaroni@ ferc.gov. 1 Green Island Power Authority, 140 FERC ¶ 62,133 (2012). PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 Deadline for filing comments, motions to intervene, and protests: 30 days from the date that the Commission issues this notice. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via U.S. Postal Service must be addressed to, Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to, Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–13–042. Comments emailed to Commission staff are not considered part of the Commission record. Dated: December 1, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–26842 Filed 12–8–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2354–152] Georgia Power Company; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for a non-capacity amendment of license for the North Georgia Project and has prepared an Environmental Assessment (EA). The licensee proposes to amend the license to replace and upgrade four generating units in the Tugalo powerhouse. The licensee proposes at the Tugalo Development to: remove all turbine E:\FR\FM\09DEN1.SGM 09DEN1 75619 Federal Register / Vol. 87, No. 236 / Friday, December 9, 2022 / Notices components to refurbish and upgrade, replace the existing generators, replace control panels and instrumentation in the control room, balance plant electrical and mechanical systems, upgrade the cooling system, and replace the spillway gates and trash racks. The project is located in the Savannah River basin on the Tallulah, Chattooga, and Tugalo rivers, in Rabun, Habersham, and Stephens counties, Georgia, and Oconee County, South Carolina. The project does not occupy federal lands. The EA contains Commission staff’s analysis of the potential environmental effects of the proposed amendment and concludes that, it would not constitute a major federal action that would significantly affect the quality of the human environment. The Commission provides all interested persons with an opportunity to view and/or print the EA via the internet through the Commission’s Home Page (https://www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https://ferconline.ferc.gov/ eSubscription.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the date of this notice. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://ferconline.ferc.gov/eFiling. aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// ferconline.ferc.gov/QuickComment. aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filings, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–2354– 152. For further information, contact Aneela Mousam at (202) 502–8357 or aneela.mousam@ferc.gov. Kimberly D. Bose, Secretary. [FR Doc. 2022–26841 Filed 12–8–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator and Foreign Utility Company Status Docket Nos. Eastover Solar LLC .......................................................................................................................................................................... PGR 2021 Lessee 17, LLC .............................................................................................................................................................. Yellow Pine Solar, LLC ..................................................................................................................................................................... Mesquite Solar 4, LLC ...................................................................................................................................................................... Mesquite Solar 5, LLC ...................................................................................................................................................................... Fall River Solar, LLC ........................................................................................................................................................................ DLS—Jean Duluth Project Co, LLC ................................................................................................................................................. DLS—Laskin Project Co, LLC .......................................................................................................................................................... DLS—Sylvan Project Co, LLC .......................................................................................................................................................... GulfStar Power, LLC ......................................................................................................................................................................... Yellowbud Solar, LLC ....................................................................................................................................................................... Jicarilla Solar 1 LLC ......................................................................................................................................................................... Jicarilla Storage 1 LLC ..................................................................................................................................................................... Colice Hall Solar, LLC ...................................................................................................................................................................... I Squared Capital .............................................................................................................................................................................. Take notice that during the month of November 2022, the status of the abovecaptioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission’s regulations. 18 CFR 366.7(a) (2021). Dated: December 1, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–26843 Filed 12–8–22; 8:45 am] lotter on DSK11XQN23PROD with NOTICES1 BILLING CODE 6717–01–P VerDate Sep<11>2014 17:50 Dec 08, 2022 Jkt 259001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER21–2698–000. Applicants: Portland General Electric Company. Description: Puget Sound Energy, Inc. submits Average System Cost Rate Filing for Sales of Electric Power to the Bonneville Power Administration, FY 2024–2025. Filed Date: 12/1/22. Accession Number: 20221201–5315. Comment Date: 5 p.m. ET 12/22/22. PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 EG22–215–000 EG22–216–000 EG22–217–000 EG22–218–000 EG22–219–000 EG22–220–000 EG22–221–000 EG22–222–000 EG22–223–000 EG22–224–000 EG22–225–000 EG22–226–000 EG22–227–000 EG22–228–000 FC22–3–000 Docket Numbers: ER22–2344–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: Deficiency Response—Storage Facilities as Transmission Only Assets to be effective 12/31/9998. Filed Date: 12/2/22. Accession Number: 20221202–5142. Comment Date: 5 p.m. ET 12/23/22. Docket Numbers: ER23–557–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revisions to OATT & OA on Emission Adders and Calculation of Cost-Based Offers to be effective 2/1/2023. Filed Date: 12/2/22. Accession Number: 20221202–5123. Comment Date: 5 p.m. ET 12/23/22. Docket Numbers: ER23–558–000. E:\FR\FM\09DEN1.SGM 09DEN1

Agencies

[Federal Register Volume 87, Number 236 (Friday, December 9, 2022)]
[Notices]
[Pages 75618-75619]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-26841]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2354-152]


Georgia Power Company; Notice of Availability of Environmental 
Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR part 380, the Office of Energy Projects has 
reviewed the application for a non-capacity amendment of license for 
the North Georgia Project and has prepared an Environmental Assessment 
(EA). The licensee proposes to amend the license to replace and upgrade 
four generating units in the Tugalo powerhouse. The licensee proposes 
at the Tugalo Development to: remove all turbine

[[Page 75619]]

components to refurbish and upgrade, replace the existing generators, 
replace control panels and instrumentation in the control room, balance 
plant electrical and mechanical systems, upgrade the cooling system, 
and replace the spillway gates and trash racks. The project is located 
in the Savannah River basin on the Tallulah, Chattooga, and Tugalo 
rivers, in Rabun, Habersham, and Stephens counties, Georgia, and Oconee 
County, South Carolina. The project does not occupy federal lands.
    The EA contains Commission staff's analysis of the potential 
environmental effects of the proposed amendment and concludes that, it 
would not constitute a major federal action that would significantly 
affect the quality of the human environment.
    The Commission provides all interested persons with an opportunity 
to view and/or print the EA via the internet through the Commission's 
Home Page (https://www.ferc.gov) using the ``eLibrary'' link. Enter the 
docket number, excluding the last three digits in the docket number 
field, to access the document. For assistance, contact FERC Online 
Support at [email protected] or toll-free at (866) 208-3676, 
or for TTY, (202) 502-8659.
    You may also register online at https://ferconline.ferc.gov/eSubscription.aspx to be notified via email of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    Any comments should be filed within 30 days from the date of this 
notice. The Commission strongly encourages electronic filing. Please 
file comments using the Commission's eFiling system at https://ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments 
up to 6,000 characters, without prior registration, using the eComment 
system at https://ferconline.ferc.gov/QuickComment.aspx. You must 
include your name and contact information at the end of your comments. 
For assistance, please contact FERC Online Support. In lieu of 
electronic filings, you may submit a paper copy. Submissions sent via 
the U.S. Postal Service must be addressed to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Room 1A, Washington, DC 20426. Submissions sent via any other carrier 
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. 
The first page of any filing should include docket number P-2354-152.
    For further information, contact Aneela Mousam at (202) 502-8357 or 
[email protected].

Kimberly D. Bose,
Secretary.
[FR Doc. 2022-26841 Filed 12-8-22; 8:45 am]
BILLING CODE 6717-01-P