Federal Register / Vol. 87, No. 235 / Thursday, December 8, 2022 / Notices
FERC–725J (DEFINITION OF THE BULK ELECTRIC SYSTEM)
Number of
respondents
Annual
number of
responses per
respondent
Total
number of
responses
Average burden
(hrs.) & cost
($) per response
Total annual burden
hours & total
annual cost
($)
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
Generator Owners, Distribution
Providers, and Transmission
Owners (Exception Request).
All Registered Entities (Implementation Plans and Compliance).
Local Distribution Determinations ...
Total .........................................
10
1
10
120 hrs.; $10,320 .......
1,200 hrs.; $103,200 ............
$10,320
157
1
157
350 hrs.; $30,100 .......
54,950 hrs.; $4,725,700 .......
30,100
1
1
1
92 hrs.; $7,912 ...........
92 hrs.; $7,912 .....................
7,912
........................
........................
168
.....................................
56,242 hrs.; $4,836,812 .......
..............................
Comments: Comments are invited on:
(1) whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s
estimates of the burden and cost of the
collection of information, including the
validity of the methodology and
assumptions used; (3) ways to enhance
the quality, utility and clarity of the
information collection; and (4) ways to
minimize the burden of the collection of
information on those who are to
respond, including the use of automated
collection techniques or other forms of
information technology.
Dated: December 2, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–26676 Filed 12–7–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AC23–6–000]
lotter on DSK11XQN23PROD with NOTICES1
Empire Pipeline, Inc.; Notice of Filing
Take notice that on November 15,
2022, Empire Pipeline, Inc. submitted a
request for waiver of the Federal Energy
Regulatory Commission’s (Commission)
requirement to provide its certified
public accountant (CPA) certification
statement for the 2022 FERC Form No.
2 on the basis of the calendar year
ending December 31.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
VerDate Sep<11>2014
17:36 Dec 07, 2022
Jkt 259001
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant. On
or before the comment date, it is not
necessary to serve motions to intervene
or protests on persons other than the
Applicant.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. Hand
delivered submissions in docketed
proceedings should be delivered to
Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Comment Date: 5 p.m. Eastern Time
on January 5, 2023.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
Dated: December 2, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–26688 Filed 12–7–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER22–1192–003.
Applicants: Constellation Mystic
Power, LLC.
Description: Compliance filing:
Compliance Filing of Settlement Tariff
Sheets to be effective 6/1/2022.
Filed Date: 12/2/22.
Accession Number: 20221202–5079.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23–175–001.
Applicants: Daggett Solar Power 3
LLC.
Description: Tariff Amendment:
Amendment to Market-Based Rate
Application to be effective 12/26/2022.
Filed Date: 12/2/22.
Accession Number: 20221202–5111.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23–545–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
OATT Revised Attachment H–1—
Attachment 14 to be effective 2/2/2023.
Filed Date: 12/2/22.
Accession Number: 20221202–5019.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23–546–000.
Applicants: Meadowlark Wind I LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Baseline
to be effective 1/31/2023.
Filed Date: 12/2/22.
Accession Number: 20221202–5032.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23–547–000.
Applicants: Midcontinent
Independent System Operator, Inc.
E:\FR\FM\08DEN1.SGM
08DEN1
lotter on DSK11XQN23PROD with NOTICES1
75244
Federal Register / Vol. 87, No. 235 / Thursday, December 8, 2022 / Notices
Description: § 205(d) Rate Filing:
2022–12–02_SA 3296 ITC–DIG J1262 1st
Rev GIA to be effective 11/22/2022.
Filed Date: 12/2/22.
Accession Number: 20221202–5049.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23–548–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1313R17 Oklahoma Gas and Electric
Company NITSA and NOA to be
effective 2/1/2023.
Filed Date: 12/2/22.
Accession Number: 20221202–5061.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23–549–000.
Applicants: Consolidated Edison
Company of New York, Inc., New York
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
Consolidated Edison Company of New
York, Inc. submits tariff filing per
35.13(a)(2)(iii: NYISO-ConEd Joint 205:
TPIA NYISO, ConEd, Transco SA2734—
CEII to be effective 11/17/2022.
Filed Date: 12/2/22.
Accession Number: 20221202–5063.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23–550–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA No. 3741, Queue
#Y3–012 (amend) to be effective 12/23/
2013.
Filed Date: 12/2/22.
Accession Number: 20221202–5085.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23–551–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 314—Pseudo-Tie with
WAPA and AEPCO to be effective 2/1/
2023.
Filed Date: 12/2/22.
Accession Number: 20221202–5089.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23–552–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Putney Solar
(Solar & Battery) LGIA Filing to be
effective 11/23/2022.
Filed Date: 12/2/22.
Accession Number: 20221202–5095.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23–553–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
VerDate Sep<11>2014
17:36 Dec 07, 2022
Jkt 259001
filing per 35.13(a)(2)(iii: BS Solar (Solar
& Battery) LGIA Filing to be effective
11/23/2022.
Filed Date: 12/2/22.
Accession Number: 20221202–5097.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23–554–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: Tariff Amendment:
Alabama Power Company submits tariff
filing per 35.15: Macon Parkway Solar
Project LGIA Termination Filing to be
effective 12/2/2022.
Filed Date: 12/2/22.
Accession Number: 20221202–5098.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23–555–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: ISA,
SA No. 6710; Queue No. AE2–027 to be
effective 11/2/2022.
Filed Date: 12/2/22.
Accession Number: 20221202–5110.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23–556–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised ISA, SA No. 3395; Queue No.
AE1–134 to be effective 11/2/2022.
Filed Date: 12/2/22.
Accession Number: 20221202–5120.
Comment Date: 5 p.m. ET 12/23/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 2, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–26685 Filed 12–7–22; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15280–000]
Stonecat Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On June 9, 2022, Stonecat Hydro,
LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility the Lower
Swanton Dam Hydroelectric Project No.
15280 (project), to be located on the
Missisquoi River in the Town of
Swanton, Franklin County, Vermont.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) an existing dam
(Swanton Dam) that includes: (a) a west
abutment that includes two 8-foot-long,
8-foot-high wooden headgates; and (b)
an approximately 330-foot long spillway
that would be retrofitted with: (i) 2-foothigh flashboards with a crest elevation
of 110.0 feet mean sea level (msl) at the
top of the flashboards; and (ii) a new 60foot-long, 100-foot-wide reinforced
concrete powerhouse at the east end of
the spillway that includes three 283kilowatt (kW) turbine-generator units,
with a total installed capacity of
approximately 850 kW; (2) an
impoundment with a surface area of
approximately 180 acres at an elevation
of 110 feet msl; (3) a new 60-foot-long,
100-foot-wide intake structure that
includes a reinforced concrete forebay
and trashrack upstream of the new
powerhouse; (4) a new 150-foot-long,
60-foot wide bedrock and reinforced
concrete tailrace; (5) a new 12.47kilovolt transmission line that would
connect the turbine-generators to the
local distribution grid; (6) a new fish
passage facility that would utilize an
approximately 300-foot-long, existing
canal downstream of the west abutment;
(7) an existing parking lot to provide
access to project facilities; and (8)
appurtenant facilities. The estimated
annual generation of the Lower Swanton
Dam Hydroelectric Project would be
3,580 megawatt-hours.
Applicant Contact: Mr. Peter
Blanchfield, Chief Executive Officer,
E:\FR\FM\08DEN1.SGM
08DEN1
Agencies
[Federal Register Volume 87, Number 235 (Thursday, December 8, 2022)]
[Notices]
[Pages 75243-75244]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-26685]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER22-1192-003.
Applicants: Constellation Mystic Power, LLC.
Description: Compliance filing: Compliance Filing of Settlement
Tariff Sheets to be effective 6/1/2022.
Filed Date: 12/2/22.
Accession Number: 20221202-5079.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23-175-001.
Applicants: Daggett Solar Power 3 LLC.
Description: Tariff Amendment: Amendment to Market-Based Rate
Application to be effective 12/26/2022.
Filed Date: 12/2/22.
Accession Number: 20221202-5111.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23-545-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: OATT Revised Attachment H-
1--Attachment 14 to be effective 2/2/2023.
Filed Date: 12/2/22.
Accession Number: 20221202-5019.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23-546-000.
Applicants: Meadowlark Wind I LLC.
Description: Baseline eTariff Filing: Reactive Power Compensation
Baseline to be effective 1/31/2023.
Filed Date: 12/2/22.
Accession Number: 20221202-5032.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23-547-000.
Applicants: Midcontinent Independent System Operator, Inc.
[[Page 75244]]
Description: Sec. 205(d) Rate Filing: 2022-12-02_SA 3296 ITC-DIG
J1262 1st Rev GIA to be effective 11/22/2022.
Filed Date: 12/2/22.
Accession Number: 20221202-5049.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23-548-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1313R17 Oklahoma Gas and
Electric Company NITSA and NOA to be effective 2/1/2023.
Filed Date: 12/2/22.
Accession Number: 20221202-5061.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23-549-000.
Applicants: Consolidated Edison Company of New York, Inc., New York
Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: Consolidated Edison Company
of New York, Inc. submits tariff filing per 35.13(a)(2)(iii: NYISO-
ConEd Joint 205: TPIA NYISO, ConEd, Transco SA2734--CEII to be
effective 11/17/2022.
Filed Date: 12/2/22.
Accession Number: 20221202-5063.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23-550-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to ISA No. 3741,
Queue #Y3-012 (amend) to be effective 12/23/2013.
Filed Date: 12/2/22.
Accession Number: 20221202-5085.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23-551-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Rate Schedule No. 314--
Pseudo-Tie with WAPA and AEPCO to be effective 2/1/2023.
Filed Date: 12/2/22.
Accession Number: 20221202-5089.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23-552-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(iii: Putney Solar (Solar &
Battery) LGIA Filing to be effective 11/23/2022.
Filed Date: 12/2/22.
Accession Number: 20221202-5095.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23-553-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(iii: BS Solar (Solar & Battery)
LGIA Filing to be effective 11/23/2022.
Filed Date: 12/2/22.
Accession Number: 20221202-5097.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23-554-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Tariff Amendment: Alabama Power Company submits tariff
filing per 35.15: Macon Parkway Solar Project LGIA Termination Filing
to be effective 12/2/2022.
Filed Date: 12/2/22.
Accession Number: 20221202-5098.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23-555-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: ISA, SA No. 6710; Queue No.
AE2-027 to be effective 11/2/2022.
Filed Date: 12/2/22.
Accession Number: 20221202-5110.
Comment Date: 5 p.m. ET 12/23/22.
Docket Numbers: ER23-556-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: First Revised ISA, SA No.
3395; Queue No. AE1-134 to be effective 11/2/2022.
Filed Date: 12/2/22.
Accession Number: 20221202-5120.
Comment Date: 5 p.m. ET 12/23/22.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 2, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-26685 Filed 12-7-22; 8:45 am]