Rio Grande LNG, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Proposed Carbon Capture and Sequestration System Amendment, 75248 [2022-26678]
Download as PDF
75248
Federal Register / Vol. 87, No. 235 / Thursday, December 8, 2022 / Notices
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ (i.e., CP21–113–000), and
follow the instructions. For assistance
with access to eLibrary, the helpline can
be reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
website also provides access to the texts
of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
Dated: December 2, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–26679 Filed 12–7–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–17–000]
lotter on DSK11XQN23PROD with NOTICES1
Rio Grande LNG, LLC; Notice of
Schedule for the Preparation of an
Environmental Assessment for the
Proposed Carbon Capture and
Sequestration System Amendment
On November 17, 2021, Rio Grande
LNG, LLC filed an application in Docket
No. CP22–17–000 requesting a Limited
Amendment to Rio Grande LNG, LLC’s
November 22, 2019 Authorization
pursuant to Section 3 of the Natural Gas
Act. The proposed project is known as
the Carbon Capture and Sequestration
System Amendment (Project) and would
incorporate carbon capture and
sequestration (CCS) systems into the site
and design of the Rio Grande LNG
Terminal, which was previously
approved by the Commission on
November 22, 2019.
On November 29, 2021, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
VerDate Sep<11>2014
17:36 Dec 07, 2022
Jkt 259001
of the Commission staff’s environmental
document for the Project.
This notice identifies Commission
staff’s intention to prepare an
environmental assessment (EA) for the
Project and the planned schedule for the
completion of the environmental
review.1
Schedule for Environmental Review
Issuance of EA—May 5, 2023
90-day Federal Authorization Decision
Deadline 2—August 3, 2023
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
The Project would incorporate CCS
systems into the approved site and
design of the Rio Grande LNG Terminal
in Cameron County, Texas. The
proposed CCS facilities consist of the
following: flue gas cooling and carbon
dioxide absorption, dehydration, and
compression equipment; amine
regenerator and reboiler; and hot oil
system.
Background
On September 2, 2022, the
Commission issued a Notice of Scoping
Period Requesting Comments on
Environmental Issues for the Proposed
Carbon Capture and Sequestration
System Amendment and Notice of
Public Scoping Sessions (Notice of
Scoping). The Notice of Scoping was
sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. In response to
the Notice of Scoping, the Commission
received comments from the U.S. Army
Corps of Engineers; U.S. Environmental
Protection Agency; Texas Governor Greg
Abbott; Texas Parks and Wildlife
Department; Cameron County; Another
Gulf; Friends of the Wildlife Corridor;
Save RGV; Sierra Club (including the
Lower Rio Grande Valley Group); Rio
Grande LNG, LLC; and numerous
individuals. The primary issues raised
by the commenters related to general
opposition to or support for the Project;
climate change, air quality, and
1 40
CFR 1501.10 (2020).
2 The
Commission’s deadline applies to the
decisions of other federal agencies, and state
agencies acting under federally delegated authority,
that are responsible for federal authorizations,
permits, and other approvals necessary for
proposed projects under the Natural Gas Act. Per
18 CFR 157.22(a), the Commission’s deadline for
other agency’s decisions applies unless a schedule
is otherwise established by federal law.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
greenhouse gas emissions;
environmental justice; wetlands and
water quality; vegetation and wildlife;
and impacts related to the Project’s nonjurisdictional facilities. All substantive
comments will be addressed in the EA.
The U.S. Army Corps of Engineers is
a cooperating agency in the preparation
of the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
service provides automatic notification
of filings made to subscribed dockets,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP22–17), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: December 2, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–26678 Filed 12–7–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER23–542–000.
Applicants: San Diego Gas & Electric
Company.
Description: Informational Filing
[Cycle 5] of Fifth Transmission Owner
Rate Formula rate mechanism of San
Diego Gas & Electric Company.
Filed Date: 12/1/22.
Accession Number: 20221201–5234.
Comment Date: 5 p.m. ET 12/20/22.
Docket Numbers: ER23–543–000.
E:\FR\FM\08DEN1.SGM
08DEN1
Agencies
[Federal Register Volume 87, Number 235 (Thursday, December 8, 2022)]
[Notices]
[Page 75248]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-26678]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP22-17-000]
Rio Grande LNG, LLC; Notice of Schedule for the Preparation of an
Environmental Assessment for the Proposed Carbon Capture and
Sequestration System Amendment
On November 17, 2021, Rio Grande LNG, LLC filed an application in
Docket No. CP22-17-000 requesting a Limited Amendment to Rio Grande
LNG, LLC's November 22, 2019 Authorization pursuant to Section 3 of the
Natural Gas Act. The proposed project is known as the Carbon Capture
and Sequestration System Amendment (Project) and would incorporate
carbon capture and sequestration (CCS) systems into the site and design
of the Rio Grande LNG Terminal, which was previously approved by the
Commission on November 22, 2019.
On November 29, 2021, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
environmental document for the Project.
This notice identifies Commission staff's intention to prepare an
environmental assessment (EA) for the Project and the planned schedule
for the completion of the environmental review.\1\
---------------------------------------------------------------------------
\1\ 40 CFR 1501.10 (2020).
---------------------------------------------------------------------------
Schedule for Environmental Review
Issuance of EA--May 5, 2023
90-day Federal Authorization Decision Deadline \2\--August 3, 2023
---------------------------------------------------------------------------
\2\ The Commission's deadline applies to the decisions of other
federal agencies, and state agencies acting under federally
delegated authority, that are responsible for federal
authorizations, permits, and other approvals necessary for proposed
projects under the Natural Gas Act. Per 18 CFR 157.22(a), the
Commission's deadline for other agency's decisions applies unless a
schedule is otherwise established by federal law.
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
The Project would incorporate CCS systems into the approved site
and design of the Rio Grande LNG Terminal in Cameron County, Texas. The
proposed CCS facilities consist of the following: flue gas cooling and
carbon dioxide absorption, dehydration, and compression equipment;
amine regenerator and reboiler; and hot oil system.
Background
On September 2, 2022, the Commission issued a Notice of Scoping
Period Requesting Comments on Environmental Issues for the Proposed
Carbon Capture and Sequestration System Amendment and Notice of Public
Scoping Sessions (Notice of Scoping). The Notice of Scoping was sent to
affected landowners; federal, state, and local government agencies;
elected officials; environmental and public interest groups; Native
American tribes; other interested parties; and local libraries and
newspapers. In response to the Notice of Scoping, the Commission
received comments from the U.S. Army Corps of Engineers; U.S.
Environmental Protection Agency; Texas Governor Greg Abbott; Texas
Parks and Wildlife Department; Cameron County; Another Gulf; Friends of
the Wildlife Corridor; Save RGV; Sierra Club (including the Lower Rio
Grande Valley Group); Rio Grande LNG, LLC; and numerous individuals.
The primary issues raised by the commenters related to general
opposition to or support for the Project; climate change, air quality,
and greenhouse gas emissions; environmental justice; wetlands and water
quality; vegetation and wildlife; and impacts related to the Project's
non-jurisdictional facilities. All substantive comments will be
addressed in the EA.
The U.S. Army Corps of Engineers is a cooperating agency in the
preparation of the EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of formal issuances and submittals in specific dockets, the
Commission offers a free service called eSubscription. This service
provides automatic notification of filings made to subscribed dockets,
document summaries, and direct links to the documents. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP22-17), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC
website also provides access to the texts of formal documents issued by
the Commission, such as orders, notices, and rule makings.
Dated: December 2, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-26678 Filed 12-7-22; 8:45 am]
BILLING CODE 6717-01-P