Combined Notice of Filings #1, 74416-74417 [2022-26384]
Download as PDF
74416
Federal Register / Vol. 87, No. 232 / Monday, December 5, 2022 / Notices
Estimate of Annual Burden: 1 The
number of respondents is based on
NERC’s Registry as of November 4,
2022. Entities registered for more than
one applicable function type have been
accounted for in the figures below. The
Commission estimates the annual public
reporting burden and cost 2 for the
information collection as:
FERC–725I—(MANDATORY RELIABILITY STANDARDS FOR THE NORTHEAST POWER COORDINATING COUNCIL)
Information collection requirements
Number of
respondents
Annual
number of
responses per
respondent
Total number
of responses
Average burden
hours & cost
($)
per response
Total annual
burden hours &
total annual cost
($)
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
PCs Design and document automatic
UFLS program.
PCs update and maintain UFLS program database.
GOs provide documentation and data
to the planning coordinator.
GOs: record retention ........................
Total ............................................
3
1
3
8 hrs.; $728 ......
24 hrs.; $2,184
$728
3
1
3
16 hrs.; $1,456
48 hrs.; $4,368
$1,456
121
1
121
16 hrs.; $1,456
1,456
121
1
121
4 hrs.; $364 ......
1,936 hrs.;
$176,176.
484 hrs.;
$33,300,176.
........................
........................
248
...........................
........................
Docket Numbers: EC23–33–000.
Applicants: Huck Finn Solar, LLC,
HFREC Holding Company, LLC, Union
Electric Company d/b/a Ameren
Missouri.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Huck Finn Solar,
LLC.
Filed Date: 11/29/22.
Accession Number: 20221129–5111.
Comment Date: 5 p.m. ET 1/30/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–1053–001;
ER21–2573–001.
Applicants: HollyFrontier Puget
Sound Refining LLC, HollyFrontier El
Dorado Refining LLC.
Description: Notice of Change in
Status of HollyFrontier El Dorado
Refining LLC, et al.
Filed Date: 11/28/22.
Accession Number: 20221128–5157.
Comment Date: 5 p.m. ET 12/19/22.
Docket Numbers: ER19–1553–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits Formula
Transmission Rate Annual Update
Filing (TO2023).
Filed Date: 11/18/22.
Accession Number: 20221118–5107.
Comment Date: 5 p.m. ET 12/9/22.
Docket Numbers: ER22–2624–001.
Applicants: Middletown Coke
Company, LLC.
Description: Tariff Amendment:
Amendment to 189 to be effective 11/3/
2022.
Filed Date: 11/3/22.
Accession Number: 20221103–5126.
Comment Date: 5 p.m. ET 12/13/22.
Docket Numbers: ER23–500–000.
Applicants: Capital Energy PA LLC.
Description: Notice of Cancellation of
Market Based Rate Tariff of Capital
Energy PA LLC.
Filed Date: 11/28/22.
Accession Number: 20221128–5156.
Comment Date: 5 p.m. ET 12/19/22.
Docket Numbers: ER23–501–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Services Company.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii): 2022–11–29_SA 3932
Union Electric-Hannibal-MJMEUC WCA
to be effective 12/15/2022.
Filed Date: 11/29/22.
Accession Number: 20221129–5027.
Comment Date: 5 p.m. ET 12/20/22.
Docket Numbers: ER23–502–000.
Applicants: HollyFrontier Puget
Sound Refining LLC.
Description: § 205(d) Rate Filing:
Notice of Succession filing to be
effective 11/30/2022.
Filed Date: 11/29/22.
Accession Number: 20221129–5085.
Comment Date: 5 p.m. ET 12/20/22.
Docket Numbers: ER23–503–000.
Applicants: HollyFrontier El Dorado
Refining LLC.
Description: § 205(d) Rate Filing:
Notice of Succession filing to be
effective 11/30/2022.
Filed Date: 11/29/22.
Accession Number: 20221129–5088.
Comment Date: 5 p.m. ET 12/20/22.
Docket Numbers: ER23–504–000.
1 ‘‘Burden’’ is the total time, effort, or financial
resources expended by persons to generate,
maintain, retain, or disclose or provide information
to or for a federal agency. For further explanation
of what is included in the information collection
burden, refer to Title 5 CFR 1320.3.
2 Commission staff estimates that the industry’s
skill set and cost (for wages and benefits) for FERC–
725I are approximately the same as the
Commission’s average cost. The FERC 2022 average
salary plus benefits for one FERC full-time
equivalent (FTE) is $188,922/year (or $91.00/hour).
Comments: Comments are invited on:
(1) whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: November 29, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–26388 Filed 12–2–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
ddrumheller on DSK30NT082PROD with NOTICES
2,492 hrs.; ........
$199,360 ..........
364
VerDate Sep<11>2014
19:34 Dec 02, 2022
Jkt 259001
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
E:\FR\FM\05DEN1.SGM
05DEN1
ddrumheller on DSK30NT082PROD with NOTICES
Federal Register / Vol. 87, No. 232 / Monday, December 5, 2022 / Notices
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Amendment to Rate Schedule FERC No.
249 to be effective 12/31/2022.
Filed Date: 11/29/22.
Accession Number: 20221129–5124.
Comment Date: 5 p.m. ET 12/20/22.
Docket Numbers: ER23–505–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX-Monte Alto Windpower 6th
A&R GIA to be effective 11/14/2022.
Filed Date: 11/29/22.
Accession Number: 20221129–5125.
Comment Date: 5 p.m. ET 12/20/22.
Docket Numbers: ER23–506–000.
Applicants: AEP Oklahoma
Transmission Company, Inc.
Description: § 205(d) Rate Filing:
AEPOTC-Seven Cowboy Wind
Maintenance Agreement to be effective
11/7/2022.
Filed Date: 11/29/22.
Accession Number: 20221129–5129.
Comment Date: 5 p.m. ET 12/20/22.
Docket Numbers: ER23–507–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Amendment to Rate Schedule FERC No.
16 to be effective 1/30/2023.
Filed Date: 11/29/22.
Accession Number: 20221129–5143.
Comment Date: 5 p.m. ET 12/20/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 29, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–26384 Filed 12–2–22; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
19:34 Dec 02, 2022
Jkt 259001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–6–000]
RH energytrans, LLC; Notice of
Request for Extension of Time
Take notice that on November 18,
2022, RH energytrans, LLC (RH)
requested that the Federal Energy
Regulatory Commission (Commission)
grant a second extension of time, until
December 7, 2024, to complete
construction of, and place into service,
its Meadville and County Line
compressor stations in Crawford and
Erie Counties, Pennsylvania. The
Commission previously issued a letter
order granting an extension of time until
and including December 7, 2022.1 The
Order Issuing Certificate (Certificate
Order) 2 required RH to complete the
construction of the proposed Risberg
Line Project facilities 3 and make them
available for service within two years
from issuance, or by December 7, 2020.4
In RH’s initial October 2020 request
for an extension of time 5 RH stated that
it had experienced construction delays
due to winter weather, the dissolution
of one of its pipeline contractors, and
delays resulting from COVID–19
pandemic restrictions. RH states that it
has continued to experience similar
conditions and that commercial activity
has only slowly been returning in the
areas served by the Risberg Line. As a
result, RH now requests an additional
two years, or until December 7, 2024, to
complete the authorized construction at
the Meadville and County Line
compressor stations and make them
available for service.6
This notice establishes a 15-calendar
day intervention and comment period
deadline. Any person wishing to
comment on RH’s request for an
extension of time may do so. No reply
comments or answers will be
considered. If you wish to obtain legal
1 RH energytrans, LLC, Docket No. CP18–6–000,
Letter Order (Nov. 18, 2020).
2 RH energytrans, LLC, 165 FERC ¶ 61,218 (2018)
(Certificate Order).
3 The Risberg Line Project consists of the
conversion of 31.6 miles of existing 8-inch and 12inch natural gas gathering pipeline to transmission
service, construction of 28.3 miles of new 12-inch
pipeline, conversion of the existing Countyline
Compressor station from gathering to transmission
service, and construction of a new compressor
station at Meadville, PA.
4 Id. at ordering para. (B)(1).
5 RH energytrans, LLC, Request for Extension of
Time to Complete Construction of Jurisdictional
Facilities, Docket No. CP18–6–000 (Oct. 19, 2020).
6 On December 1, 2019, RH placed all of the
Risberg Line Project facilities into service except for
the Meadville and County Line compressor stations.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
74417
status by becoming a party to the
proceedings for this request, you
should, on or before the comment date
stated below, file a motion to intervene
in accordance with the requirements of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).7
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
those extension requests that are
contested,8 the Commission will aim to
issue an order acting on the request
within 45 days.9 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.10 The Commission will not
consider arguments that re-litigate the
issuance of the Certificate Order,
including whether the Commission
properly found the project to be in the
public convenience and necessity and
whether the Commission’s
environmental analysis for the
certificate complied with the National
Environmental Policy Act.11 At the time
a pipeline requests an extension of time,
orders on certificates of public
convenience and necessity are final and
the Commission will not re-litigate their
issuance.12 The OEP Director, or his or
her designee, will act on those extension
requests that are uncontested.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
7 Only motions to intervene from entities that
were party to the underlying proceeding will be
accepted. Algonquin Gas Transmission, LLC, 170
FERC ¶ 61,144, at P 39 (2020).
8 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR. 385.2201(c)(1) (2020).
9 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
10 Id. P 40.
11 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
12 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
E:\FR\FM\05DEN1.SGM
05DEN1
Agencies
[Federal Register Volume 87, Number 232 (Monday, December 5, 2022)]
[Notices]
[Pages 74416-74417]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-26384]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC23-33-000.
Applicants: Huck Finn Solar, LLC, HFREC Holding Company, LLC, Union
Electric Company d/b/a Ameren Missouri.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of Huck Finn Solar, LLC.
Filed Date: 11/29/22.
Accession Number: 20221129-5111.
Comment Date: 5 p.m. ET 1/30/23.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER16-1053-001; ER21-2573-001.
Applicants: HollyFrontier Puget Sound Refining LLC, HollyFrontier
El Dorado Refining LLC.
Description: Notice of Change in Status of HollyFrontier El Dorado
Refining LLC, et al.
Filed Date: 11/28/22.
Accession Number: 20221128-5157.
Comment Date: 5 p.m. ET 12/19/22.
Docket Numbers: ER19-1553-000.
Applicants: Southern California Edison Company.
Description: Southern California Edison Company submits Formula
Transmission Rate Annual Update Filing (TO2023).
Filed Date: 11/18/22.
Accession Number: 20221118-5107.
Comment Date: 5 p.m. ET 12/9/22.
Docket Numbers: ER22-2624-001.
Applicants: Middletown Coke Company, LLC.
Description: Tariff Amendment: Amendment to 189 to be effective 11/
3/2022.
Filed Date: 11/3/22.
Accession Number: 20221103-5126.
Comment Date: 5 p.m. ET 12/13/22.
Docket Numbers: ER23-500-000.
Applicants: Capital Energy PA LLC.
Description: Notice of Cancellation of Market Based Rate Tariff of
Capital Energy PA LLC.
Filed Date: 11/28/22.
Accession Number: 20221128-5156.
Comment Date: 5 p.m. ET 12/19/22.
Docket Numbers: ER23-501-000.
Applicants: Midcontinent Independent System Operator, Inc., Ameren
Services Company.
Description: Sec. 205(d) Rate Filing: Midcontinent Independent
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii): 2022-
11-29_SA 3932 Union Electric-Hannibal-MJMEUC WCA to be effective 12/15/
2022.
Filed Date: 11/29/22.
Accession Number: 20221129-5027.
Comment Date: 5 p.m. ET 12/20/22.
Docket Numbers: ER23-502-000.
Applicants: HollyFrontier Puget Sound Refining LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succession filing
to be effective 11/30/2022.
Filed Date: 11/29/22.
Accession Number: 20221129-5085.
Comment Date: 5 p.m. ET 12/20/22.
Docket Numbers: ER23-503-000.
Applicants: HollyFrontier El Dorado Refining LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succession filing
to be effective 11/30/2022.
Filed Date: 11/29/22.
Accession Number: 20221129-5088.
Comment Date: 5 p.m. ET 12/20/22.
Docket Numbers: ER23-504-000.
[[Page 74417]]
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Amendment to Rate Schedule
FERC No. 249 to be effective 12/31/2022.
Filed Date: 11/29/22.
Accession Number: 20221129-5124.
Comment Date: 5 p.m. ET 12/20/22.
Docket Numbers: ER23-505-000.
Applicants: AEP Texas Inc.
Description: Sec. 205(d) Rate Filing: AEPTX-Monte Alto Windpower
6th A&R GIA to be effective 11/14/2022.
Filed Date: 11/29/22.
Accession Number: 20221129-5125.
Comment Date: 5 p.m. ET 12/20/22.
Docket Numbers: ER23-506-000.
Applicants: AEP Oklahoma Transmission Company, Inc.
Description: Sec. 205(d) Rate Filing: AEPOTC-Seven Cowboy Wind
Maintenance Agreement to be effective 11/7/2022.
Filed Date: 11/29/22.
Accession Number: 20221129-5129.
Comment Date: 5 p.m. ET 12/20/22.
Docket Numbers: ER23-507-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Amendment to Rate Schedule
FERC No. 16 to be effective 1/30/2023.
Filed Date: 11/29/22.
Accession Number: 20221129-5143.
Comment Date: 5 p.m. ET 12/20/22.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: November 29, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-26384 Filed 12-2-22; 8:45 am]
BILLING CODE 6717-01-P