Download as PDF Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices lotter on DSK11XQN23PROD with NOTICES1 NEPA Process and the Environmental Document Any environmental document issued by the Commission will discuss impacts that could occur as a result of the construction and operation of the proposed project under the relevant general resource areas: • Geology and soils; • Water resources and wetlands; • Vegetation and wildlife; • Threatened and endangered species; • Cultural resources; • Land use; • Environmental justice • Air quality and noise; and • Reliability and safety. Commission staff will also evaluate reasonable alternatives to the proposed project or portions of the project and make recommendations on how to lessen or avoid impacts on the various resource areas. Your comments will help Commission staff identify and focus on the issues that might have an effect on the human environment and potentially eliminate others from further study and discussion in the environmental document. Following this scoping period, Commission staff will determine whether to prepare an Environmental Assessment (EA) or an Environmental Impact Statement (EIS). The EA or the EIS will present Commission staff’s independent analysis of the issues. If Commission staff prepares an EA, a Notice of Schedule for the Preparation of an Environmental Assessment will be issued. The EA may be issued for an allotted public comment period. The Commission would consider timely comments on the EA before making its decision regarding the proposed project. If Commission staff prepares an EIS, a Notice of Intent to Prepare an EIS/ Notice of Schedule will be issued, which will open up an additional comment period. Staff will then prepare a draft EIS which will be issued for public comment. Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS. Any EA or draft and final EIS will be available in electronic format in the public record through eLibrary 3 and the Commission’s natural gas environmental documents web page (https://www.ferc.gov/industries-data/ natural-gas/environment/ environmental-documents). If eSubscribed, you will receive instant 3 For instructions on connecting to eLibrary, refer to the last page of this notice. VerDate Sep<11>2014 16:58 Nov 29, 2022 Jkt 259001 email notification when the environmental document is issued. With this notice, the Commission is asking agencies with jurisdiction by law and/or special expertise with respect to the environmental issues of this project to formally cooperate in the preparation of the environmental document.4 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Consultation Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, the Commission is using this notice to initiate consultation with the applicable State Historic Preservation Office(s), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.5 The environmental document for this project will document findings on the impacts on historic properties and summarize the status of consultations under section 106. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project and includes a mailing address with their comments. Commission staff will update the environmental mailing list as the analysis proceeds to ensure that Commission notices related to this environmental review are sent to all individuals, organizations, and government entities interested in and/or 4 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at title 40, Code of Federal Regulations, section 1501.8. 5 The Advisory Council on Historic Preservation’s regulations are at title 36, Code of Federal Regulations, part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 73549 potentially affected by the proposed project. If you need to make changes to your name/address, or if you would like to remove your name from the mailing list, please complete one of the following steps: (1) Send an email to GasProjectAddressChange@ferc.gov stating your request. You must include the docket number CP23–3–000 in your request. If you are requesting a change to your address, please be sure to include your name and the correct address. If you are requesting to delete your address from the mailing list, please include your name and address as it appeared on this notice. This email address is unable to accept comments. OR (2) Return the attached ‘‘Mailing List Update Form’’ (appendix 2). Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website at www.ferc.gov using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number in the ‘‘Docket Number’’ field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. Public sessions or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/newsevents/events along with other related information. Dated: November 23, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–26093 Filed 11–29–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC23–32–000. Applicants: Brookfield Smoky Mountain Hydropower LP, Smoky Mountain Transmission LLC, AMF Kimble Holdings, LLC. E:\FR\FM\30NON1.SGM 30NON1 lotter on DSK11XQN23PROD with NOTICES1 73550 Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Brookfield Smoky Mountain Hydropower LP et al. Filed Date: 11/22/22. Accession Number: 20221122–5226. Comment Date: 5 pm ET 12/9/22. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG23–26–000. Applicants: Yellow Pine Solar Interconnect, LLC. Description: Yellow Pine Solar Interconnect, LLC Notice of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 11/21/22. Accession Number: 20221121–5219. Comment Date: 5 pm ET 12/9/22. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER21–2454–000. Applicants: Rainbow Energy Marketing Corporation. Description: Refund Report for August 2020 of Rainbow Energy Marketing Corporation. Filed Date: 11/16/22. Accession Number: 20221116–5188. Comment Date: 5 pm ET 12/7/22. Docket Numbers: ER22–2933–000. Applicants: Nevada Power Company, Sierra Pacific Power Company. Description: Supplement to September 26, 2022 Nevada Power Company tariff filing. Filed Date: 11/21/22. Accession Number: 20221121–5110. Comment Date: 5 pm ET 12/9/22. Docket Numbers: ER23–375–001. Applicants: Colice Hall Solar, LLC. Description: Tariff Amendment: Supplement to Application for MarketBased Rate Authority to be effective 12/ 15/2022. Filed Date: 11/23/22. Accession Number: 20221123–5102. Comment Date: 5 pm ET 12/14/22. Docket Numbers: ER23–480–000. Applicants: Savion, LLC, Madison Fields Solar Project, LLC, Shell Energy North America (US), L.P. Description: Savion, LLC, Madison Fields Solar Project, LLC, et al. Request a One Time Limited Waiver of a Procedural Deadline set forth in Sec. 5.14(h-2)(1)(A) of Attachment DD to the PJM Interconnection, L.L.C. Tariff. Filed Date: 11/18/22. Accession Number: 20221118–5276. Comment Date: 5 pm ET 11/28/22. Docket Numbers: ER23–483–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA No. 5071; Queue No. AB1–132 to be effective 4/16/2018. VerDate Sep<11>2014 16:58 Nov 29, 2022 Jkt 259001 Filed Date: 11/23/22. Accession Number: 20221123–5006. Comment Date: 5 pm ET 12/9/22. Docket Numbers: ER23–484–000. Applicants: Unitil Energy Systems, Inc. Description: Tariff Amendment: Partial cancellation Hydro Wheeling Agreement to be effective 10/1/2022. Filed Date: 11/23/22. Accession Number: 20221123–5015. Comment Date: 5 pm ET 12/14/22. Docket Numbers: ER23–485–000. Applicants: Public Service Company of Colorado. Description: § 205(d) Rate Filing: WAPA Ault-Husky Con Agrmt Amnd 1– 567–0.1.0 to be effective 11/24/2022. Filed Date: 11/23/22. Accession Number: 20221123–5027. Comment Date: 5 pm ET 12/14/22. Docket Numbers: ER23–486–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Rate Schedule No. 217, Exhibit B.SGR to be effective 1/23/2023. Filed Date: 11/23/22. Accession Number: 20221123–5029. Comment Date: 5 pm ET 12/14/22. Docket Numbers: ER23–487–000. Applicants: Rivercrest Power-South, LLC Description: Compliance filing: Baseline refile to be effective 9/29/2022. Filed Date: 11/23/22. Accession Number: 20221123–5032. Comment Date: 5 pm ET 12/14/22. Docket Numbers: ER23–488–000. Applicants: ISO New England Inc., Eversource Energy Service Company (as agent). Description: § 205(d) Rate Filing: ISO New England Inc. submits tariff filing per 35.13(a)(2)(iii): ISO–NE/Eversource; First Revised Service Agreement No. LGIA–ISONE/NSTAR–20–01 to be effective 11/4/2022. Filed Date: 11/23/22. Accession Number: 20221123–5033. Comment Date: 5 pm ET 12/14/22. Docket Numbers: ER23–489–000. Applicants: Neptune Energy Center, LLC. Description: Baseline eTariff Filing: Neptune Energy Center, LLC Application for Market-Based Rate Authorization to be effective 1/23/2023. Filed Date: 11/23/22. Accession Number: 20221123–5054. Comment Date: 5 pm ET 12/14/22. Docket Numbers: ER23–490–000. Applicants: Louisville Gas and Electric Company. Description: Compliance filing: Order No. 676–J Compliance Filing to be effective 1/27/2023. PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 Filed Date: 11/23/22. Accession Number: 20221123–5055. Comment Date: 5 pm ET 12/14/22. Docket Numbers: ER23–491–000. Applicants: Power Authority of the State of New York, New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: Power Authority of the State of New York submits tariff filing per 35.13(a)(2)(iii): Section 205 Filing of NYPA: Proposed Formula Rate Amendments to be effective 1/24/2023. Filed Date: 11/23/22. Accession Number: 20221123–5059. Comment Date: 5 pm ET 12/14/22. Docket Numbers: ER23–492–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Initial Filing of Service Agreement FERC No. 909 to be effective 11/17/ 2022. Filed Date: 11/23/22. Accession Number: 20221123–5070. Comment Date: 5 pm ET 12/14/22. Docket Numbers: ER23–493–000. Applicants: Thunder Wolf Energy Center, LLC. Description: Baseline eTariff Filing: Thunder Wolf Energy Center, LLC Application for Market-Based Rate Authorization to be effective 1/23/2023. Filed Date: 11/23/22. Accession Number: 20221123–5099. Comment Date: 5 pm ET 12/14/22. Docket Numbers: ER23–494–000. Applicants: Goose Creek Wind, LLC. Description: Baseline eTariff Filing: Reactive Power Tariff Application to be effective 12/31/9998. Filed Date: 11/23/22. Accession Number: 20221123–5165. Comment Date: 5 pm ET 12/14/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. E:\FR\FM\30NON1.SGM 30NON1 Federal Register / Vol. 87, No. 229 / Wednesday, November 30, 2022 / Notices Dated: November 23, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–26096 Filed 11–29–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 9282–039] lotter on DSK11XQN23PROD with NOTICES1 Pine Valley Hydroelectric Power Company, LLC; Notice of Intent To File License Application, Filing of PreApplication Document, and Approving Use of The Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 9282–039. c. Date Filed: September 27, 2022. d. Submitted by: Pine Valley Hydroelectric Power Company, LLC (Pine Valley Hydro). e. Name of Project: Pine Valley Hydroelectric Project (project). f. Location: On the Souhegan River in Hillsborough County, New Hampshire. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant To: 18 CFR 5.3 and 5.5 of the Commission’s regulations. h. Potential Applicant Contact: Mr. Jonathan DiCesare, Pine Valley Hydroelectric Power Company, LLC; 10 Roberts Lane, Suite 201, Ridgefield, CT 06877; (518) 657–9012; or email at info@ dichotomypower.com. i. FERC Contact: Michael Watts at (202) 502–6123; or email at michael.watts@ferc.gov. j. Pine Valley Hydro filed its request to use the Traditional Licensing Process on September 27, 2022, and provided public notice of its request on September 20, 2022. In a letter dated November 23 2022, the Director of the Division of Hydropower Licensing approved Pine Valley Hydro’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the New Hampshire State Historic Preservation Officer, as required by VerDate Sep<11>2014 16:58 Nov 29, 2022 Jkt 259001 section 106 of the National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Pine Valley Hydro as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and consultation pursuant to section 106 of the National Historic Preservation Act. m. On September 27, 2022, Pine Valley Hydro filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD may be viewed and/or printed on the Commission’s website (https://www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19) issued on March 13, 2020. o. The licensee states its unequivocal intent to submit an application for a subsequent license for Project No. 9282. Pursuant to 18 CFR 16.20, each application for a subsequent license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by September 30, 2027. p. Register online at https:// ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: November 23, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–26090 Filed 11–29–22; 8:45 am] BILLING CODE 6717–01–P PO 00000 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–14–000] Wyoming Interstate Company, LLC; Notice of Application and Establishing Intervention Deadline Take notice that on November 10, 2022, Wyoming Interstate Company, LLC (WIC), Post Office Box 1087, Colorado Springs, Colorado 80944, filed in Docket No. CP23–14–000, an application under section 7(b) of the Natural Gas Act (NGA), and Part 157 of the Commission’s regulations requesting authority to abandon, in place, the Diamond Mountain Compressor Station (Diamond Mountain Abandonment Project) located at approximate Milepost 54.8 on WIC’s 24-inch diameter Kanda Lateral in Uintah County, Utah, all as more fully set forth in the request which is on file with the Commission and open to public inspection with the Commission and open for public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding the application should be directed to Francisco Tarin, Director, Regulatory, Wyoming Interstate Company, LLC; P.O. Box 1087, Colorado Springs, Colorado 80944, by phone at (719) 667–7517, or via email at Francisco_Tarin@ kindermorgan.com. Pursuant to section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or 1 18 Frm 00013 Fmt 4703 Sfmt 4703 73551 CFR (Code of Federal Regulations) 157.9. E:\FR\FM\30NON1.SGM 30NON1

Agencies

[Federal Register Volume 87, Number 229 (Wednesday, November 30, 2022)]
[Notices]
[Pages 73549-73551]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-26096]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC23-32-000.
    Applicants: Brookfield Smoky Mountain Hydropower LP, Smoky Mountain 
Transmission LLC, AMF Kimble Holdings, LLC.

[[Page 73550]]

    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act of Brookfield Smoky Mountain Hydropower LP et 
al.
    Filed Date: 11/22/22.
    Accession Number: 20221122-5226.
    Comment Date: 5 pm ET 12/9/22.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG23-26-000.
    Applicants: Yellow Pine Solar Interconnect, LLC.
    Description: Yellow Pine Solar Interconnect, LLC Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 11/21/22.
    Accession Number: 20221121-5219.
    Comment Date: 5 pm ET 12/9/22.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER21-2454-000.
    Applicants: Rainbow Energy Marketing Corporation.
    Description: Refund Report for August 2020 of Rainbow Energy 
Marketing Corporation.
    Filed Date: 11/16/22.
    Accession Number: 20221116-5188.
    Comment Date: 5 pm ET 12/7/22.

    Docket Numbers: ER22-2933-000.
    Applicants: Nevada Power Company, Sierra Pacific Power Company.
    Description: Supplement to September 26, 2022 Nevada Power Company 
tariff filing.
    Filed Date: 11/21/22.
    Accession Number: 20221121-5110.
    Comment Date: 5 pm ET 12/9/22.

    Docket Numbers: ER23-375-001.
    Applicants: Colice Hall Solar, LLC.
    Description: Tariff Amendment: Supplement to Application for 
Market-Based Rate Authority to be effective 12/15/2022.
    Filed Date: 11/23/22.
    Accession Number: 20221123-5102.
    Comment Date: 5 pm ET 12/14/22.

    Docket Numbers: ER23-480-000.
    Applicants: Savion, LLC, Madison Fields Solar Project, LLC, Shell 
Energy North America (US), L.P.
    Description: Savion, LLC, Madison Fields Solar Project, LLC, et al. 
Request a One Time Limited Waiver of a Procedural Deadline set forth in 
Sec. 5.14(h-2)(1)(A) of Attachment DD to the PJM Interconnection, 
L.L.C. Tariff.
    Filed Date: 11/18/22.
    Accession Number: 20221118-5276.
    Comment Date: 5 pm ET 11/28/22.

    Docket Numbers: ER23-483-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to ISA No. 5071; 
Queue No. AB1-132 to be effective 4/16/2018.
    Filed Date: 11/23/22.
    Accession Number: 20221123-5006.
    Comment Date: 5 pm ET 12/9/22.

    Docket Numbers: ER23-484-000.
    Applicants: Unitil Energy Systems, Inc.
    Description: Tariff Amendment: Partial cancellation Hydro Wheeling 
Agreement to be effective 10/1/2022.
    Filed Date: 11/23/22.
    Accession Number: 20221123-5015.
    Comment Date: 5 pm ET 12/14/22.

    Docket Numbers: ER23-485-000.
    Applicants: Public Service Company of Colorado.
    Description: Sec.  205(d) Rate Filing: WAPA Ault-Husky Con Agrmt 
Amnd 1-567-0.1.0 to be effective 11/24/2022.
    Filed Date: 11/23/22.
    Accession Number: 20221123-5027.
    Comment Date: 5 pm ET 12/14/22.

    Docket Numbers: ER23-486-000.
    Applicants: Arizona Public Service Company.
    Description: Sec.  205(d) Rate Filing: Rate Schedule No. 217, 
Exhibit B.SGR to be effective 1/23/2023.
    Filed Date: 11/23/22.
    Accession Number: 20221123-5029.
    Comment Date: 5 pm ET 12/14/22.

    Docket Numbers: ER23-487-000.
    Applicants: Rivercrest Power-South, LLC
    Description: Compliance filing: Baseline refile to be effective 9/
29/2022.
    Filed Date: 11/23/22.
    Accession Number: 20221123-5032.
    Comment Date: 5 pm ET 12/14/22.

    Docket Numbers: ER23-488-000.
    Applicants: ISO New England Inc., Eversource Energy Service Company 
(as agent).
    Description: Sec.  205(d) Rate Filing: ISO New England Inc. submits 
tariff filing per 35.13(a)(2)(iii): ISO-NE/Eversource; First Revised 
Service Agreement No. LGIA-ISONE/NSTAR-20-01 to be effective 11/4/2022.
    Filed Date: 11/23/22.
    Accession Number: 20221123-5033.
    Comment Date: 5 pm ET 12/14/22.

    Docket Numbers: ER23-489-000.
    Applicants: Neptune Energy Center, LLC.
    Description: Baseline eTariff Filing: Neptune Energy Center, LLC 
Application for Market-Based Rate Authorization to be effective 1/23/
2023.
    Filed Date: 11/23/22.
    Accession Number: 20221123-5054.
    Comment Date: 5 pm ET 12/14/22.

    Docket Numbers: ER23-490-000.
    Applicants: Louisville Gas and Electric Company.
    Description: Compliance filing: Order No. 676-J Compliance Filing 
to be effective 1/27/2023.
    Filed Date: 11/23/22.
    Accession Number: 20221123-5055.
    Comment Date: 5 pm ET 12/14/22.

    Docket Numbers: ER23-491-000.
    Applicants: Power Authority of the State of New York, New York 
Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: Power Authority of the State 
of New York submits tariff filing per 35.13(a)(2)(iii): Section 205 
Filing of NYPA: Proposed Formula Rate Amendments to be effective 1/24/
2023.
    Filed Date: 11/23/22.
    Accession Number: 20221123-5059.
    Comment Date: 5 pm ET 12/14/22.

    Docket Numbers: ER23-492-000.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Sec.  205(d) Rate Filing: Initial Filing of Service 
Agreement FERC No. 909 to be effective 11/17/2022.
    Filed Date: 11/23/22.
    Accession Number: 20221123-5070.
    Comment Date: 5 pm ET 12/14/22.

    Docket Numbers: ER23-493-000.
    Applicants: Thunder Wolf Energy Center, LLC.
    Description: Baseline eTariff Filing: Thunder Wolf Energy Center, 
LLC Application for Market-Based Rate Authorization to be effective 1/
23/2023.
    Filed Date: 11/23/22.
    Accession Number: 20221123-5099.
    Comment Date: 5 pm ET 12/14/22.

    Docket Numbers: ER23-494-000.
    Applicants: Goose Creek Wind, LLC.
    Description: Baseline eTariff Filing: Reactive Power Tariff 
Application to be effective 12/31/9998.
    Filed Date: 11/23/22.
    Accession Number: 20221123-5165.
    Comment Date: 5 pm ET 12/14/22.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.


[[Page 73551]]


    Dated: November 23, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-26096 Filed 11-29-22; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.